This document is a detailed specification (Section 02900) for Airfield Paint and Rubber Removal Maintenance at McConnell Air Force Base. The scope of work includes removing existing airfield painted markings and runway rubber deposits, and repainting various airfield markings across multiple areas such as North MAPA, Delta Ramp, Echo Ramp, Foxtrot Ramp, and runways 19L/01R and 19R/01L. Specific tasks involve applying reflective and non-reflective markings in yellow, white, and red, including centerline markings, side stripe markings, hold position markings, restricted area markings, and enhanced taxiway centerline markings.
The specification provides extensive technical details on marking requirements, including paint types, application methods, color specifications, and removal techniques. Key requirements include 85% paint removal on certain areas like North MAPA and Foxtrot Ramp, rubber removal from specific runway sections, and precise painting guidelines following UFC 3-260-04 standards. Equipment specifications mandate using pneumatic spraying machines, maintaining specific paint coverage rates, and using reflective media. The work involves careful surface preparation, paint application at specific temperatures, and strict compliance with environmental and safety regulations. The project requires meticulous attention to marking dimensions, reflectivity, and positioning across various airfield surfaces.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRQE254444 – FY25 AIRFIELD PAINT &
RUBBER REMOVAL MAINTENANCE 02900-1
SECTION 02900 – AIRFIELD PAINTED MARKINGS & REMOVAL OF AIRFIELD PAINT & RUBBER
1. SCOPE OF WORK: Work includes the furnishing of all plant, labor, equipment, supervision, materials, incidentals, and operations as required for removing airfield painted markings and runway rubber deposits and painting airfield markings in strict accordance with the contract drawings, UFC 3-260-04, and technical specifications as specified herein subject to the terms and conditions of the contract.
1.1 PRINCIPAL FEATURES: Work shall include, but not be limited to, removing and disposing of existing airfield painted markings and runway rubber, and applying reflective and non-reflective paint on runways, overruns, taxiways, shoulders, aprons, etc. as specified and shown herein. Estimated quantities are as follows:
Unless otherwise stated below, black markings will be non-reflective.
NON-REFLECTIVE YELLOW MARKINGS
[3] Hydrant pit covers on North MAPA. 14 EA non-reflective yellow 6 ft wide border around hydrant pit covers.
REFLECTIVE YELLOW MARKINGS
[10] Centerline Markings on North MAPA (KC-135 Parking). Includes centerline markings for 17 aircraft parking stalls (rows 1 to 6 and columns A to C, include aircraft stop block marking and stall number), blast fence centerline markings, and lead-in lines to hangars 1124 and 1125, Taxiway Alpha, and Taxiway Bravo. 6 inch wide reflective yellow, with 6-inch-wide black border. Centerlines on MAPA conform to taxiway centerlines, see Figure 6-7 in UFC 3-260-04 for more guidance.
[11] Side Stripe Markings on North MAPA (KC-135 Parking). Alternating 6 inch wide reflective yellow and 6-inch-wide black markings. Pattern from MAPA pavement to shoulder is black-reflective yellow-black-reflective yellow. Include curved side stripes indicating entrance or exit onto Taxiway Bravo (full turn). See paragraph 6-3.1 in UFC 3-260-04 for more guidance.
[13] Centerline Markings on Echo Ramp. Includes centerline markings for a total of 4 aircraft parking stalls (including aircraft stop block markings), lead lines (full turn) to Taxiway Alpha, and blast fence centerline markings. 6 inch wide reflective yellow, with 6-inch-wide black border. Centerlines on Ramp conforms to taxiway centerlines, see Figure 6-7 in UFC 3-260-04 for more guidance.
[14] Centerline Markings on Delta Ramp. Includes centerline markings for a total of 15 aircraft parking stalls (including aircraft stop block markings) and lead lines (full turn) to Taxiway Alpha. 6 inch wide reflective yellow, with 6-inch-wide black border. Centerlines on Ramp conforms to taxiway centerlines, see Figure 6- 7 in UFC 3-260-04 for more guidance.
[15] Centerline Markings on Foxtrot Ramp. Includes centerline markings for a total of 15 aircraft parking stalls (including aircraft stop block markings) and lead lines (full turn) to Taxiway Alpha. 6 inch wide reflective yellow, with 6-inch-wide black border. Centerlines on Ramp conforms to taxiway centerlines, see Figure 6- 7 in UFC 3-260-04 for more guidance.
[16] Side Stripe Markings on Echo Ramp. Alternating 6 inch wide reflective yellow and 6-inch-wide black markings. Pattern from Ramp pavement to shoulder is black-reflective yellow-black-reflective yellow.
Include curved side stripes indicating entrance or exit (full turn) onto Taxiway Alpha. See paragraph 6-3.1 in UFC 3-260-04 for more guidance.
[17] Side Stripe Markings on Delta Ramp. Alternating 6 inch wide reflective yellow and 6-inch-wide black markings. Pattern from Ramp pavement to shoulder is black-reflective yellow-black-reflective yellow.
Include curved side stripes indicating entrance or exit (full turn) onto Taxiway Alpha. Note that on the east side of the ramp, the pattern from pavement to shoulder is black-reflective yellow-black-reflective yellow, black (please match existing conditions). See paragraph 6-3.1 in UFC 3-260-04 for more guidance.
[18] Side Stripe Markings on Foxtrot Ramp. Alternating 6 inch wide reflective yellow and 6-inch-wide black markings. Pattern from Ramp pavement to shoulder is black-reflective yellow-black-reflective yellow.
Include curved side stripes indicating entrance or exit (full turn) onto Taxiway Alpha. See paragraph 6-3.1 in UFC 3-260-04 for more guidance.
RUBBER REMOVAL MAINTENANCE 02900-2
[19] Centerline Markings on Taxiway Delta (full length). Includes centerlines accounting for turns (full turn) onto Taxiway Alpha, Runway 19L/01R, Runway 19R01L, and Taxiway Foxtrot. No work to extend past property line. 6 inch wide reflective yellow, with 6-inch-wide black border. See Figure 6-7 in UFC 3-260- 04 for more guidance.
[20] Side Stripe Markings on Taxiway Delta. Alternating 6 inch wide reflective yellow and 6-inch-wide black markings. Pattern from Taxiway pavement to shoulder is black-reflective yellow-black-reflective yellow, black on eastern part of taxiway. Note that pattern changes to black-reflective yellow-black-reflective yellow on the western part of the taxiway. In these instances, match existing conditions. Include curved side stripes indicating entrance or exit (full turn) onto Taxiway Alpha, Runway 19L01R, Runway 19R/01L, and Taxiway Foxtrot. No work to extend past property line. See paragraph 6-3.1 in UFC 3-260-04 for more guidance. Note that side stripes should about the hold line with no interruption, if there is an interruption between the side stripe and the hold line on the Taxiway, it shall be corrected.
[21] Hold Position Markings on Taxiway Delta. 4 EA, 2 solid and 2 dashed 6 inch wide reflective yellow markings spaced 6 inches apart with 6 inch wide non-reflective black border markings on all sides. See Figure 6-7 in UFC 3-260-04 for reference. Work will also include repainting reflective red directional signage, see Figure 6-10 in UFC 3-260-04 for guidance. Reflective red directional signage will read “01R-19L” when approaching the east runway from the east. Reflective red directional signage will read “19L-01R” when approaching the east runway from the west. Reflective red directional signage will read “01L-19R” when approaching the west runway from the east. Reflective red directional signage will read “19R-01L” when approaching the west runway from the west. Note that numbers / letters in this signage are much smaller than runway designators, see detail within this specification for dimensions.
[22] Enhanced Centerline Markings on Taxiway Delta. 3 EA, 1 solid and 2 dashed 6-inch-wide reflective yellow markings spaced 6 inches apart with 6 inch wide non-reflective black borders. See Figure 6-7 in UFC 3- 260-04 for reference. Note that enhanced centerline should abut hold position markings, per Figure 6-7.
Existing markings in which this does not occur, or this occurs not in compliance with standards, will be updated such that enhanced centerline touches hold markings correctly.
[24] Centerline Markings on Taxiway Echo (full length). Includes centerlines accounting for turns (full turn) onto Taxiway Alpha, Runway 19L/01R, and Runway 19R/01L. No work to extend past property line. 6 inch wide reflective yellow, with 6-inch-wide black border. See Figure 6-7 in UFC 3-260-04 for more guidance.
[25] Side Stripe Markings on Taxiway Echo. Alternating 6 inch wide reflective yellow and 6-inch-wide black markings. Pattern from Taxiway pavement to shoulder is black-reflective yellow-black-reflective yellow.
Include curved side stripes indicating entrance or exit (full turn) onto Taxiway Alpha, Runway 19L/01R, and Runway 19R/01L. See Figure 6-7 in UFC 3-260-04 for more guidance. Note that side stripes should about the hold line with no interruption, if there is an interruption between the side stripe and the hold line on the Taxiway, it shall be corrected.
REFLECTIVE WHITE MARKINGS
[26] Centerline Markings on Runway 19L/01R. Reflective white markings. Markings located on dark milled-and-overlayed portion of runway do not have 6-inch wide, non-reflective black border. Elsewhere on Runway, 6-inch wide, non-reflective black border is required. See Figure 5-3 in UFC 3-260-04 for more guidance.
[28] Threshold Markings on Runway 19L/01R. Reflective white markings (bars) with 6-inch wide, non-reflective black border. Includes horizontal bar preceding threshold markings. See Figure 5-3 in UFC 3-260-04 for more guidance. Work will include alpha-numeric runway designation.
[30] All Markings on Runway 19R/01L existing underneath rubber to be removed in this project. This includes the centerline, and possibly touchdown markings. Reference Figure 5-3 and 5-1 “Precision Instrument Runway” for more information.
Note: See Item [43] for additional Reflective White Marking work.
NON-REFLECTIVE WHITE MARKINGS
RUBBER REMOVAL MAINTENANCE 02900-3
[46] Driving lanes and AGE Box Markings on South MAPA. Non-reflective white markings. Driving lanes with 6-inch wide, non-reflective white. AGE boxes have 6-inch-wide vertical markings.
REFLECTIVE RED MARKINGS
[31] Restricted Area Markings encompassing the North MAPA. 6-inch-wide reflective red marking. Work includes the entry control point reflective white bars stating “Entry Point”. See end of section for image of sign, match existing.
[32] Restricted Area Markings encompassing the Delta Ramp. 6-inch-wide reflective red marking. Work includes the entry control point reflective white bars stating “Entry Point”. See end of section for image of sign, match existing.
[33] Restricted Area Markings encompassing the Echo Ramp. 6-inch-wide reflective red marking. Work includes the entry control point reflective white bars stating “Entry Point”. See end of section for image of sign, match existing.
[34] Restricted Area Markings encompassing the Foxtrot Ramp. 6-inch-wide reflective red marking. Work includes the entry control point reflective white bars stating “Entry Point”. See end of section for image of sign, match existing.
[45] Restricted Area Markings encompassing the South MAPA. 6-inch-wide reflective red marking. Work includes the entry control point reflective white bars stating “Entry Point”. See end of section for image of sign, match existing.
Note: See Item [21] for additional Reflective Red Marking work.
NON-REFLECTIVE BLACK MARKINGS
[35] Paint over existing markings at locations as identified by the Government. Estimate for marked out markings is approximately 5,000 SF.
RESTRICTED AREA WARNING SIGN MARKINGS
[36] Restricted Area Warning Sign Markings adjacent to restricted area markings encompassing the North Mapa. 4 feet wide by 5 feet long reflective white background with reflective red & black lettering. See detail at end of specification section for more guidance.
[37] Restricted Area Warning Sign Markings adjacent to restricted area markings encompassing Delta Ramp. 4 feet wide by 5 feet long reflective white background with reflective red & black lettering. See detail at end of specification section for more guidance.
[38] Restricted Area Warning Sign Markings adjacent to restricted area markings encompassing the Echo Ramp. 4 feet wide by 5 feet long reflective white background with reflective red & black lettering. See detail at end of specification section for more guidance.
[39] Restricted Area Warning Sign Markings adjacent to restricted area markings encompassing the Foxtrot Ramp. 4 feet wide by 5 feet long reflective white background with reflective red & black lettering. See detail at end of specification section for more guidance.
[44] Restricted Area Warning Sign Markings adjacent to restricted area markings encompassing the South MAPA. 4 feet wide by 5 feet long reflective white background with reflective red & black lettering. See detail at end of specification section for more guidance.
85% PAINT REMOVAL
[40] All repainting work taking place on the North MAPA must be 85% removed before new paint layer placed.
This includes items [3], [10], [11], [31], and [36].
[41] All repainting work taking place on the Foxtrot Ramp mut be 85% removed before new paint layer placed. This includes items [15], [18], [34], and [39].
RUBBER REMOVAL MAINTENANCE 02900-4
RUNWAY RUBBER REMOVAL
[42] West (19R/01L) and East (19L/01R) Runways. Location of rubber removal is the center 75 feet on each runway. Area of interest are rubber markings caused by landings. This rubber tends to start near fixed distance markings at each end of each runway and extend for over 2,000 LF towards the midpoint of Runway.
100% PAINT REMOVAL
[43] Deicing Pit blacked-out nose blocks must be 100% removed. This work will also include repainting the existing nose blocks. Non-reflective black background with reflective white lettering & arrows. See end of this specification for details on the location of this work, match existing.
2. CONTRACTOR EQUIPMENT AND MATERIALS STORAGE AREA: A storage area for the Contractor to store his equipment and materials during the contract performance shall be designated by the Contracting Officer.
Upon completion of work, the area shall be cleaned up and left in the same condition as before use as storage area.
3. REMOVED PAINT AND/OR RUBBER: All debris, waste, and by-products generated by paint and/or removal operations shall be removed from the airfield and disposed of off base in strict compliance with applicable local, state, and federal environmental statutes and regulations, including, but not limited to, regulations promulgated under the Resource Conservation Recovery Act, 42 U.S.C. 6901, et. seq., the Comprehensive Environmental Response, Compensation, and Liability Act, 42 U.S.C. 9601, et. seq., and the Hazardous Materials Transportation Act, 49 U.S.C. 1801, et. seq. Flushing of paint and/or rubber deposits and debris from the removal operation off the pavement edge is not acceptable and is not permitted. Contractor shall submit a copy of the receipt of disposal or other proof verifying where waste was disposed. Removed paint and/or rubber deposits shall be removed immediately with a power vacuum sweeper. A power vacuum sweeper shall be provided by the contractor at no cost to the government and shall not damage the runway pavement in any form or manner. If it is determined by the contracting officer’s technical representative that the power vacuum sweeper damages the runway, all paint and/or rubber removal operations shall stop until such time that the sweeper is adjusted for proper operation or a new sweeper is provided. Time to adjust or replace the sweeper shall not be construed as downtime and contractor shall incur all costs.
4. WARRANTY: All work, materials, and equipment shall be warranted for a period of one year from the date of acceptance by the contracting officer. Any warranty provisions contained in the contract clauses shall supplement this warranty specification.
5. PAVEMENT MARKINGS:
5.1 REFERENCES: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM D 792 (1991) Density and Specific Gravity (Relative Density) of Plastics by Displacement ASTM D 4280 (1995) Extended Life Type, Nonplowable, Prismatic, Raised, Retro reflective Pavement Markers ASTM D 4505 (1992) Preformed Plastic Pavement Marking Tape for Extended Service Life ASTM E 28 (1992) Softening Point by Ring-and-Ball Apparatus
FEDERAL SPECIFICATIONS (FS)
FS TT-B-1325 (Rev D) Beads, (Glass Spheres) Retro-Reflective Type I, Gradation A FS TT-P-1952 (Rev E) Paint, Traffic and Airfield Marking, Waterborne
FEDERAL STANDARDS (FED-STD)
RUBBER REMOVAL MAINTENANCE 02900-5
FED-STD 595 (Rev B) Color Used in Government Procurement
5.2 SUBMITTALS: The following shall be submitted in accordance with MACC General Conditions:
5.2.1 Equipment Lists: Lists of proposed equipment to be used in performance of construction work, including descriptive data, and notifications of proposed contractor actions as specified in this section.
5.2.2 Instructions: Manufacturer's current printed product description and Material Safety Data Sheets (MSDS) for each type paint/color proposed for use.
5.2.3 Material Tests: Certified copies of the test reports, prior to the use of the materials at the jobsite.
Testing shall be performed in an approved independent laboratory.
5.2.4 Certificates: Certificate stating that the proposed pavement marking paint meets the Volatile Organic Compound (VOC) regulations of the local Air Pollution Control District having jurisdiction over the geographical area in which the project is located.
5.3 DELIVERY AND STORAGE: All materials shall be delivered and stored in sealed containers that plainly show the designated name, formula or specification number, batch number, color, date of manufacture, manufacturer's name, and directions, all of which shall be plainly legible at time of use.
5.4 EQUIPMENT: All machines, tools and equipment used in the performance of the work shall be approved and maintained in satisfactory operating condition. Equipment operating on roads and runways will display low speed traffic markings and traffic warning lights.
5.4.1 Paint Application Equipment: The equipment to apply paint to pavements shall be a self-propelled or mobile-drawn pneumatic spraying machine with suitable arrangements of atomizing nozzles and controls to obtain the specified results. The machine shall have a speed during application not less than 5 miles per hour and shall be capable of applying the stripe widths indicated, at the paint coverage rate specified in paragraph 5.10 APPLICATION, and of even uniform thickness with clear-cut edges. Equipment used for marking streets and highways shall be capable of placing the prescribed number of lines at a single pass as solid lines, intermittent lines or a combination of solid and/or intermittent lines using a maximum of two different colors of paint as specified.
The equipment used to apply the paint binder to airfield pavements shall be a self-propelled or mobile-drawn pneumatic spraying machine with an arrangement of atomizing nozzles capable of applying a line width at any one time in multiples of 6 inches, 6 inches to 36 inches. The paint applicator shall have paint reservoirs or tanks of sufficient capacity and suitable gauges to apply paint in accordance with requirements specified. Tanks shall be equipped with suitable air-driven mechanical agitators. The spray mechanism shall be equipped with quick-action valves conveniently located, and shall include necessary pressure regulators and gauges in full view and reach of the operator. Paint strainers shall be installed in paint supply lines to insure freedom from residue and foreign matter that may cause malfunction of the spray guns. The paint applicator shall be readily adaptable for attachment of an air-actuated dispenser for the reflective media approved for use. Pneumatic spray guns shall be provided for hand application of paint in areas where the mobile paint applicator cannot be used.
5.4.2 Reflective Media Dispenser: The dispenser for applying the reflective media shall be attached to the paint dispenser and operate automatically and simultaneously with the applicator through the same control mechanism. The dispenser shall be capable of adjustment and designed to provide uniform flow of reflective media over the full length and width of the stripe at the rate of coverage specified in paragraph APPLICATION at all operating speeds of the applicator to which it is attached.
5.4.3 Surface Preparation Equipment: See paragraph 6: PAINT AND/OR RUBBER REMOVAL as specified herein.
5.4.4 Traffic Controls: Suitable warning signs shall be placed near the beginning of the worksite and well ahead of the worksite for alerting approaching traffic from both directions. Small markers shall be placed along
RUBBER REMOVAL MAINTENANCE 02900-6
newly painted lines or freshly placed raised markers to control traffic and prevent damage to newly painted surfaces or displacement of raised pavement markers. Painting equipment shall be marked with large warning signs indicating slow-moving painting equipment in operation.
5.5 HAND-OPERATED, PUSH-TYPE MACHINES: Where pavement marking is limited to small street and parking areas, hand-operated push-type machines may be specified in lieu of detailed equipment requirements. All machines, tools, and equipment used in performance of the work shall be approved and maintained in satisfactory operating condition. Hand-operated push-type machines of a type commonly used for application of paint to pavement surfaces shall be acceptable for marking small streets and parking areas. Applicator machine shall be equipped with the necessary paint tanks and spraying nozzles, and shall be capable of applying paint uniformly at coverage specified. Sandblasting equipment shall be provided as required for cleaning surfaces to be painted. Hand-operated spray guns shall be provided for use in areas where push-type machines cannot be used.
5.6 PAINT: The paint shall be homogeneous, easily stirred to smooth consistency, and shall show no hard settlement or other objectionable characteristics during a storage period of 6 months. Paints for airfields, roads, and streets shall conform to FS TT-P-1952, color as indicated. Pavement marking paints shall comply with applicable state and local laws enacted to ensure compliance with Federal Clean Air Standards. Paint materials shall conform to the restrictions of the local Air Pollution Control District.
5.7 REFLECTIVE MEDIA: Reflective media shall conform to FS TT-B-1325, Type I, Gradation A.
5.8 SAMPLING AND TESTING: The government reserves the right to sample and test materials if problems develop. A sample shall be taken by random selection from sealed containers by the Contractor in the presence of a representative of the Contracting Officer. Samples shall be clearly identified by designated name, specification number, batch number, manufacturer's formulation number, project contract number, intended use, and quantity involved. If the sample fails to meet specification requirements, the material represented by the sample shall be replaced and the new material will be tested. Cost of sampling and testing all material will be borne by the Contractor. Testing shall be performed in an approved independent laboratory. If materials are approved based on reports furnished by the Contractor, samples will be retained by the Government for possible future testing should the material appear defective during or after application.
5.9 SURFACE PREPARATION: Surfaces to be marked shall be thoroughly cleaned before application of the pavement marking material. Dust, dirt, and other granular surface deposits shall be removed by sweeping, blowing with compressed air, rinsing with water or a combination of these methods as required. Rubber deposits, surface laitance, existing paint markings, and other coatings adhering to the pavement shall be completely removed as specified herein and/or as applicable, as directed, or as shown on the drawings. Areas of old pavement affected with oil or grease shall be scrubbed with several applications of trisodium phosphate solution or other approved detergent or degreaser, and rinsed thoroughly after each application. After cleaning, oil-soaked areas shall be sealed with cut shellac to prevent bleeding through the new paint. Pavement surfaces shall be allowed to dry, when water is used for cleaning, prior to striping or marking. Surfaces shall be re-cleaned, when work has been stopped due to rain.
5.10 APPLICATION: All pavement markings and patterns shall be placed as shown on the contract drawings.
5.10.1 Paint: Paint shall be applied to clean, dry surfaces, and only when air and pavement temperatures are above 40 degrees F and less than 95 degrees F. Paint temperature shall be maintained within these same limits. Paint shall be applied pneumatically with approved equipment at rate of coverage specified herein. The Contractor shall provide guide lines and templates as necessary to control paint application. Special precautions shall be taken in marking numbers, letters, and symbols. Edges of markings shall be sharply outlined.
5.10.1.1 Rate of Application:
5.10.1.1.1 Reflective Markings: Pigmented binder shall be applied evenly to the pavement area to be coated at a rate 105 plus or minus 5 square feet per gallon. Glass spheres shall be applied uniformly to the wet paint on airfield, road, and street pavement at a rate of 6 plus or minus 0.5 pounds of glass spheres per gallon of paint.
RUBBER REMOVAL MAINTENANCE 02900-7
5.10.1.1.2 Non Reflective Markings: Paint shall be applied evenly to the pavement surface to be coated at a rate of 105 plus or minus 5 square feet per gallon.
5.10.1.2 Drying: The maximum drying time requirements of the paint specifications will be strictly enforced to prevent undue softening of bitumen, and pickup, displacement, or discoloration by tires of traffic. If there is a delay in drying of the markings, painting operations shall be discontinued until cause of the slow drying is determined and corrected.
5.10.2 Reflective Media: Application of reflective media shall immediately follow application of pigmented binder. Drop-on application of glass spheres shall be accomplished to insure that reflective media is evenly distributed at the specified rate of coverage. Should there be malfunction of either paint applicator or reflective media dispenser, operations shall be discontinued immediately until deficiency is corrected.
6. REMOVAL OF PAINT AND/OR RUBBER:
6.1 SCOPE: The work covered by this section of the specification consists of furnishing all labor, equipment, materials, tools, operations and appliances required to remove 85 or 100 percent of the paint and/or rubber build up from airfield runways, taxiways and aprons as specified herein and shown on the drawings.
6.1.1 Areas of the airfield runways to have paint applied and/or removal are identified in paragraph SCOPE OF WORK and/or as shown on the drawings. The government shall verify these areas as required at the pre-construction meeting and on the airfield before removal begins.
6.1.2 Determination of 85% or 100% Paint and/or Rubber Removal: The determination of 85% or 100% removal shall be accomplished by test as described in paragraph 6.7 DEMONSTRATION OF PROFICIENCY. The Contracting Officer and his representatives shall be present at the test area for the purpose of observing the pavement texture obtained as a product of the test strip. The test strip shall be the measure of performance required of the Contractor for the paint and/or rubber removal operations.
6.2 OPERATIONS OF THE AIRFIELD: The performance of the work will be in the controlled zones of the airfield.
All access to or through the airfield area shall be coordinated with the Contracting Officer, Government Inspector and the Airfield Manager. The Contractor shall, at all times that he is on the airfield, be in verbal and visual contact with the control tower. The control tower and the Airfield Manager shall be verbally informed when the work is complete and all equipment, labor and materials have been removed from the airfield by the Contractor. The Airfield Manager and the contracting officer’s technical representative shall conduct a visual runway check to ensure that all contractor tools, equipment, employees, and debris have been removed before opening the runway to airfield traffic.
6.2.1 It is the intention of the Government to close the runway to all aircraft traffic while paint and/or rubber are being removed. However, there may be interruptions of the work to provide a runway for aircraft which have an emergency or when a special mission for an aircraft is assigned. In the event there is a need to operate aircraft on the runway, the Contractor shall remove his equipment off the operational surfaces of the airfield and beyond the holdline within 10 minutes of being notified to clear the runway. A scheduled landing or departure which has been identified to the Contractor prior to the Contractor beginning work for the work shift shall not be considered as an interruption.
6.2.2 It is important that the Contractor adhere to the scheduled runway closure(s), weather permitting, as runway closures must be coordinated in advance. In the event that the Contractor schedule should be delayed because of weather or mechanical equipment breakdown, the Contracting Officer shall be notified by the Contractor.
The Contracting Officer will notify the Airfield Manager who shall be responsible for coordinating the runway schedule with the using agencies.
6.4 EQUIPMENT: All equipment used in the paint and/or rubber removal process shall be mounted on pneumatic tires and shall remove deposits of paint and/or rubber without damage to pavement surfaces or joint or crack seal material.. Removal equipment shall provide a minimum nozzle water pressure of 15,000 pounds per square inch, have a water injection rate of 15 gal/per minute or less, and be capable of removing paint and/or rubber
RUBBER REMOVAL MAINTENANCE 02900-8
buildup/deposits as specified herein at a minimum rate of 12,000 square feet per hour without damage to pavement surfaces or joint or crack seal material. Removal equipment shall also carry its own water supply. Contractor, at his costs, shall provide and operate a power vacuum sweeper at all times when removing paint and/or rubber and shall not damage the runway pavement in any form or manner. If it is determined by the contracting officer’s technical representative that the power vacuum sweeper damages the runway, all paint and/or rubber removal operations shall stop until such time that the sweeper is adjusted for proper operation or a new sweeper is provided. Time to adjust or replace the sweeper shall not be construed as downtime and contractor shall incur all costs. Removal pressures when removing rubber deposits on Runway 01R-19L asphalt pavement section shall not exceed 12,000 psi. The asphalt is over 20 years old and has weathered to the point where pavement aggregate removal can be a problem. Other measures can be taken to assure pavement surface is not damaged upon government approval.
6.4.1 Submittal: Contractor shall submit information on all equipment including capacity, nozzle pressure, water usage rate, description, and specifications for approval as specified in MACC General Conditions:
6.4.2 Night Operations: When night operations are to be performed by the Contractor, all necessary lighting shall be furnished by the Contractor at no cost to the Government. Lighting shall be shaded or directed so as to not interfere with aircraft or control operations. The Government reserves the right to accept or reject the night work the day following night activities by the Contractor.
6.5 WEATHER LIMITATIONS: No paint and/or rubber removal shall be permitted when the air temperature or pavement temperature is at 35 degrees F and falling without the prior approval of the contracting officer’s technical representative.
6.6 PAINT AND/OR RUBBER REMOVAL: The removal of paint and/or rubber build-up/deposits shall be accomplished by the use of high pressure water. The Contractor may use sand as an abrasive injected into the high pressure water. The use of chemical agents shall not be permitted. A power vacuum sweeper shall sweep immediately behind the removal equipment and shall sweep up as much of the removed paint and/or rubber residual from the pavement surface as is possible.
6.7 DEMONSTRATION OF PROFICIENCY (TEST STRIP): The Contractor shall test his equipment and shall demonstrate his proposed methods to be used to perform the removal of paint and/or rubber on actual areas to be cleaned. One test strip shall be made on areas which are of the full operating width of the equipment to be used for the work and a minimum length of 50 feet. The test strip shall be made on Portland cement concrete pavement. The actual length of the test strips shall be sufficient to determine the vehicle speed, water pressure, height of spray nozzle above the pavement, angle of spray and incidence with the pavement, and quantity of abrasive to be used (if any) to satisfactorily remove paint and/or rubber deposits from the pavement surfaces without damage to the pavement surface. The determination of satisfactory removal shall be in accordance with paragraph 15.8 COMPLIANCE TESTING. The Contractor shall not proceed with the work until the results of the test section are satisfactory to the Contracting Officer.
6.8 COMPLIANCE TESTING: The determination of compliance with 85 or 100 percent paint and/or rubber removal shall be determined by direct testing within the test strip areas.
6.8.1 Testing shall be performed by placing a one foot square transparent material with an inscribed 100 square (minimum) grid pattern on the pavement surface at random locations and counting the number of squares containing paint and/or rubber build-up/deposits. Compliance with 85% removal shall be considered obtained when the number of counted squares does not exceed 15 percent of the total number of squares on the grid.
6.8.2 Squares containing paint and/or rubber build-up/deposits are squares on the pavement surface where build-up/deposits of paint and/or rubber can be removed by scratching the deposit with a flat sharp object (i.e., pocket knife) without damage to the pavement surface. Paint and/or rubber stain is material in the pavement surface microtexture that cannot be removed without damage to the pavement surface. Stain is generally embedded in the surface of the pavement below the horizontal plane of the surface texture. The Contractor is not responsible for the removal of paint and/or rubber stain.
RUBBER REMOVAL MAINTENANCE 02900-9
6.9 PAVEMENT DAMAGE REPAIRS: Any damage to the pavement surface or the joint seal shall be repaired by the Contractor at his expense. Methods and materials to be used for repairs shall be approved by the Contracting Officer prior to performance of the repairs. Repairs shall be affected and completed within the performance period of the contract. A survey of the runway shall be made by the Contractor and the Contracting Officer’s technical representative before work commences to confirm the condition of the pavement and joint seal in general and to identify any substandard or damaged pavement and joint seal. Another survey shall be made at completion of work and before acceptance to identify any pavement and joint seal damage caused as a result of this work.
6.10 GOVERNMENT FURNISHED MATERIAL AND EQUIPMENT:
6.10.1 A radio or an escort with a radio for the purpose of maintaining verbal communications with the Control Tower shall be provided to the Contractor by the Government. The Contractor shall be responsible for the radio while it is in his possession and he shall reimburse the Government for the cost of repair or replacement of the radio if it is lost, damaged, or destroyed through fault or negligence of the Contractor or its employees or agents.
6.10.2 Water will be furnished to the Contractor at no cost to the Contractor. The water supply shall be a fire hydrant designated by the Contracting Officer within a reasonable proximity of the work. The Contractor shall install a gate valve on the fire hydrant tap and shall leave the fire hydrant valve open and use his gate valve for opening and closing. The Contractor shall furnish all equipment, material and labor necessary to obtain and deliver water from the designated fire hydrant to the area(s) of work.
Below are various General Painting Size Guidelines and Requirements for various Airfield Markings.
RUBBER REMOVAL MAINTENANCE 02900-10
RUNWAY DESIGNATORS – LARGER NUMBER IN FEET
RUNWAY DESIGNATORS – LARGER NUMBER IN FEET
RUBBER REMOVAL MAINTENANCE 02900-11
RUBBER REMOVAL MAINTENANCE 02900-12
RUBBER REMOVAL MAINTENANCE 02900-13
RUBBER REMOVAL MAINTENANCE 02900-14
Entry Point:
RUBBER REMOVAL MAINTENANCE 02900-15
RUBBER REMOVAL MAINTENANCE 02900-16
RUBBER REMOVAL MAINTENANCE 02900-17
END OF SECTION
| NON-REFLECTIVE YELLOW MARKINGS |
| REFLECTIVE YELLOW MARKINGS |
| REFLECTIVE WHITE MARKINGS |
| REFLECTIVE RED MARKINGS |
| NON-REFLECTIVE BLACK MARKINGS |
| RESTRICTED AREA WARNING SIGN MARKINGS |
| 85% PAINT REMOVAL |
| RUNWAY RUBBER REMOVAL |
| 100% PAINT REMOVAL |