Attach. 5 – Past Performance Questionnaire.pdf
PDF 760 KB Posted
- Solicitation number
- FA462027QA205
About this file
This is a Present/Past Performance Questionnaire for solicitation FA462027QA205 issued by Fairchild Air Force Base, Washington. The questionnaire is designed to collect performance feedback from references regarding prospective contractors' capabilities to provide maintenance, inspection, and repair services for aircraft paint/sanding booths, blasting cabinets, and industrial compressed air systems. The document is not a solicitation itself but rather an evaluation tool to be completed by previous customers or government representatives who have direct experience with contractor performance. Responses must be submitted by December 15, 2026, at 10:00 AM Pacific Time to 1Lt Chantal Henry (Contracting Specialist) at chantal.henry.1@us.af.mil or TSgt William Rife (Contracting Officer) at william.rife.1@us.af.mil.
The questionnaire evaluates contractor performance across ten detailed technical criteria using a five-point scale (Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory): airflow dynamics and filtration quality; ancillary equipment maintenance on blasting cabinets, compressors, and air dryers; proactive maintenance and troubleshooting capabilities; adherence to scheduled preventative maintenance; emergency repair response times; parts sourcing and downtime minimization; technician competency and OEM familiarity; environmental and hazardous material compliance; timeliness and quality of maintenance reporting; and price reasonableness on non-routine repairs. Additional Yes/No questions address Contract Discrepancy Reports, cure or show cause notices, and overall contractor recommendation for future contract awards. Respondents must provide comments and remarks to explain any ratings below satisfactory.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 27QA205 COMBO.pdf | ||
| Attach. 2 - Pricing Schedule.xlsx | XLSX spreadsheet | |
| Attach. 4 - Air Force Specific Terms and Conditions.pdf | ||
| Attach. 1 - Statement of Work.pdf | ||
| Attach. 3 - Wage Determination 2015-5537 Rev 30.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRESENT/PAST PERFORMANCE QUESTIONNAIRE
PAINT/SANDING BOOTH, AIR SHOWER & CABINET BLASTER MAINTENANCE
FAIRCHILD AFB, WA
SOLICITATION NO: FA462027QA205
1. Your assistance is respectfully requested in providing information on the below present/past performance questionnaire. The importance of your opinion cannot be overstated since this survey will measure the present/past performance of each prospective offeror for providing critical maintenance, inspection, and repair services for aircraft paint/sanding booths, blasting cabinets, and industrial compressed air systems at Fairchild AFB, WA.
2. INSTRUCTIONS FORM COMPLETION: Please complete this questionnaire either by hand or electronically and email the results to 1Lt Chantal Henry (Contracting Specialist) at chantal.henry.1@us.af.mil and TSgt William Rife (Contracting Officer) at william.rife.1@us.af.mil.
Email submissions are preferred but can also be returned by mail to the following address:
92 CONS/PKA
Attn: 1Lt Chantal Henry (Contracting Specialist) and TSgt William Rife (Contracting Officer) 110 W. Ent St Bldg. 2451, Suite 200 Fairchild AFB WA 99011
3. Please direct questions to 1Lt Chantal Henry (Contracting Specialist) at chantal.henry.1@us.af.mil or 509-247-4872 and TSgt William Rife (Contracting Officer) at william.rife.1@us.af.mil or 509-247-4868. Your Participation is greatly appreciated.
4. PLEASE RETURN NO LATER THAN: 15 December 2026, at 10:00 AM (Pacific Time)
SECTION A: CONTRACTOR INFORMATION
Contractor’s name and address:
a. Point of Contact:
b. Phone #:
c. Contract Number:
d. Project Title:
e. Period of Performance:
SECTION B: RESPONDENT INFORMATION
a. Respondent’s name and address:
Organization:
Address:
City: State: Zip:
FA462027QA205
Attach. 5 - Past Performance Questionnaire
b. Respondent’s Name and Title:
c. Signature:
d. Commercial Phone #: DSN Phone #:
Fax #: E-Mail:
e. Contract Type (i.e.: Firm Fixed Price):
f. Award Amount: $ Final Amount: $
g. What was the job title for this project?
What were the scope and major functions performed under this contract?
For any ratings less than satisfactory rating, please provide explanation in Remarks section below.
1 2 3 4 5 Unsatisfactory Marginal Satisfactory Very
Good Exceptional
Performance does not Performance does not meet Performance meets Performance meets The Contractor’s performance meets contractual requirements and exceeds many (requirements) to the Government’s benefit.
The contractual performance was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
meet most contractual some contractual contractual contractual requirements requirements and requirements. The requirements. The and exceeds some to the recovery is not likely in contractual performance of contractual performance Government’s benefit.
a timely manner. The the element or sub-element of the element or sub- The contractual contractual performance being evaluated reflects a element contains some performance of the of the element or sub- serious problem for which minor problems for element or sub-element element contains a the contractor has not yet which corrective actions being evaluated was serious problem(s) for identified corrective actions. taken by the contractor accomplished with some which the contractor’s The contractor’s proposed appear or were minor problems for corrective actions actions appear only satisfactory which corrective actions appear or were marginally effective or were taken by the contractor ineffective. not fully implemented. was effective.
CONTRACTOR PRESENT/PAST PERFORMANCE EVALUATION
1. Airflow Dynamics, Filtration & Finishing Quality: How effective was the contractor in inspecting, balancing, and maintaining paint booth airflow dynamics (differential pressure, Magnehelic/Photohelic gauge calibration, filter changes, and burner/makeup air operations) to support high-quality paint operations?
5. 4. 3. 2. 1.
COMMENTS/REMARKS:
FA462027QA205
2. Ancillary Equipment Maintenance (Blasting Cabinets, Compressors & Air Dryers): How well did the contractor perform preventative maintenance and servicing on supporting mechanical equipment, including media blast cabinets, industrial compressors, and desiccant/refrigerated air dryers?
5. 4. 3. 2. 1.
COMMENTS/REMARKS:
3. Proactive Maintenance & Troubleshooting: Did the contractor demonstrate proactive maintenance practices by identifying abnormal wear, diagnosing root causes, and providing actionable recommendations prior to catastrophic equipment failure?
4. Adherence to Scheduled Preventative Maintenance (PMI): How consistently did the contractor adhere to scheduled monthly/annual service visits and complete routine inspections within established timeframes?
FA462027QA205
5. Emergency / Intervening Repair Response: When unscheduled or emergency service was required during operational hours, how responsive was the contractor in meeting required on-site response times and quickly restoring equipment to fully mission-capable status?
6. Parts Sourcing & Downtime Minimization: How effective was the contractor in rapidly sourcing replacement OEM parts and minimizing equipment downtime when non-routine repairs were authorized?
7. Technician Competency & OEM Familiarity: Were field service technicians professionally trained, certified, and knowledgeable on the specific systems serviced? Did they arrive prepared with necessary test equipment, safety gear, and specialized tools?
8. Environmental & Hazardous Material Compliance: How well did the contractor comply with environmental and safety mandates, including hazardous waste handling (spent filters, solvents, chemical disposal), Clean Air permit requirements, and Safety Data Sheet (SDS) tracking?
9. Timeliness & Quality of Maintenance Reporting: Did the contractor submit thorough, legible, and accurate service reports and inspection logs within required contractual timeframes following each site visit?
10. Price Reasonableness & Transparency on Non-Routine Repairs: Did the contractor provide reasonable, competitive, and transparent pricing for parts and labor quotes on repairs outside the scheduled maintenance baseline?
Yes/No
11. Were Contract Discrepancy Reports (CDR) issued, Yes/No
Were they addressed appropriately? Yes/No If so, how?
12. Was the contractor ever issued a cure or show cause notice under the referenced contract?
Yes/No
13. Would you award another contract to this contractor? Yes/No Please explain in "remarks”.
REMARKS:
File details come from the government source that posted it. Updated .