PAINT/SANDING BOOTH, AIR SHOWER, & CABINET BLASTER MAINTENANCE
Solicitation number
FA462027QA205
Issued by

About this file

This is a Statement of Work (SOW) for preventative maintenance, inspection, and repair services on paint/sanding booth, air shower, and cabinet blaster equipment at Fairchild Air Force Base, Washington. The contract number is FA462027QA205, effective November 2026.

The Contractor shall provide all personnel, equipment, tools, materials, and supervision to maintain equipment in Building 2050, specifically: a Rhoner paint and sanding booth (R20200404), Pauli Ram 35B Dry Stripping Machine, Rogers Model KI-30-125 air compressor, Atlas Copco Airpower 815300385 Compressor, and SPX Flow air dryer (Model #HPRN125). Monthly preventive maintenance and inspection (PMI) services must include inspection and repair of booth enclosure components, ventilation systems, paint booth air makeup and exhaust systems, air shower equipment, blasting cabinet systems, and air compressor systems. All work must comply with Spokane Regional Clean Air Agency (SRCAA) Notice of Construction Permit #1842. The Contractor shall provide replacement filters at no additional cost, with roll filters changed monthly and pre-filters changed annually. All filter changeouts and maintenance activities must be documented. Minor repairs (less than 30 minutes labor and parts under $50) are included with no additional charges. Billable repairs require separate price quotes for Contracting Officer approval. Intervening repairs require an 8-hour response time during normal operations (7:00 AM–4:30 PM, Monday–Friday, excluding federal holidays). The Contractor must supply fully qualified employees with minimum two years of experience, maintain spill control materials on-site, comply with hazardous materials handling requirements using AF Form 3952, and dispose of all hazardous waste within 48 hours of job completion. Work hours are 0700–1630 Monday through Friday, excluding federal holidays. The Contractor is responsible for providing bulk containers for refuse disposal and shall maintain security compliance for all base personnel.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

PAINT/SANDING BOOTH, AIR SHOWER, & CABINET BLASTER MAINTENANCE

Fairchild AFB

November 2026

FA462027QA205

Attach. 1 - Statement of Work

Statement of Work (SOW)

For

PAINT/SANDING BOOTH, AIR SHOWER, & CABINET BLASTER MAINTENANCE

Fairchild AFB, WA

1. BACKGROUND: Fairchild Air Force Base utilizes various cabinets for blasting and painting metal aircraft parts. This equipment requires regular maintenance and inspection to ensure safe operability and continued support of mission essential aircraft maintenance and repair activities.

2. SCOPE OF WORK: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other necessary items to complete preventative maintenance, inspection, and repairs as-needed on BLDG. 2050’s paint/sanding booth, air shower, and cabinet blaster, at FAFB, WA 99011. All equipment is identified by manufacturer and serial number in Appendix A: Equipment List. The

Contractor shall inspect all equipment systems and subsystems to ensure complete equipment operation and functionality. The Contractor shall replace worn parts as required during each visit and based on part availability. During the service check, equipment shall be inspected to ensure all components are serviceable, check for abnormal wear, and will adjust or repair items as necessary. Lubrication of all motors, shafts, and moving parts shall be accomplished as needed.

3. OBJECTIVES: Ensure safe and reliable operation of equipment through regular maintenance, inspection and repair contract.

4. REQUIREMENTS: The Contractor shall maintain paint booth inserts including attached equipment accessories in accordance with the manufacturer’s recommendations and standard commercial practices.

Any chemicals provided shall be environmentally safe and shall comply with all federal, state, and local environmental compliance laws and regulatory codes. The Contractor shall perform all work in accordance with the conditions set forth in Spokane Regional Clean Air Agency (SRCAA) Notice of

Construction (NOC) Permit #1842, a copy of which will be provided at the post-award conference.

Minimum inspection and repair items to be performed monthly:

1. Booth Enclosure – Inspect/repair the following items:

a. Inspect wall and ceiling panels for leaks and proper sealing – touch up if required

b. Inspect light lenses for scoring and damage

c. Inspect for burned or broken lights

d. Inspect Caulk Seams and touchup as needed

e. Check equipment doors and view windows for proper sealing and damage

f. Check personnel door and window for proper sealing and damage

g. Check closure latches for proper operation

h. Filter Maintenance and Monitoring (Per NOC #1842, Conditions 6 & 7): The Contractor shall inspect the paint booth's dry panel filters during each service visit. The Contractor will check the pressure drop across the filters and replace them if the pressure drop exceeds the manufacturer's recommendation. At a minimum, filters shall be replaced annually. All filter change-outs must be documented.

2. Ventilation System – Inspect/repair the following items:

a. VES’s Dust Collector

i. Filters will be inspected, and recommendations made on changing them based on filter condition and differential pressure status (Photohelic gauges). Filters to be changed by contractor as required.

ii. Ventilation pre-filter change must be performed once per year – Contractor provides filters

iii. Inspect Slide gates for proper sealing and wear

iv. Inspect Pulse manifolds for proper timing sequence, leaks, wear or cracks in tubes, proper actuation, and function.

FA462027QA205

b. Check Ventilation ducting, elbows, and flanges

c. Inspect Photohelic and Magnehilic gauges and zero after every filter change

d. Inspect all ducting, elbows and flanges for proper sealing and wear.

e. Inspect bird screen and exhaust drain hole

3. Paint Booth

a. Air Makeup Unit – Inspect/repair the following items:

i. Intake Hood and Bird Screen

ii. Fans/Motors, including bearings and belts – Lube at Visit - Includes Scope on

Bearings

iii. Control Panel

iv. VFDs

v. Overloads

vi. Pre-filters – annually – Contractor must provide filters

vii. Flame Rod/UV Sensor

viii. Gas pressure gauge readings

ix. Visually inspect flame on burner and record signal strength at pilot and high flame

x. Burner tray

xi. Damper Operation

xii. Ignitor

xiii. Verify that the gas train is free from leaks

xiv. Physical condition of sensors and valving

xv. Modulating Valve

xvi. Airflow Switch

b. Exhaust Systems – Inspect/repair the following items:

i. Ensure exhaust stacks remain vertical, unobstructed, and free of any flow-obstructing caps

ii. Exhaust Ducts and Flashing

iii. Fans/Motors, including bearings and belts

iv. Bearings

v. Overloads

vi. VFDs

vii. Examine air flow switches

viii. Pressure wash exhaust pits

ix. Pressure wash exhaust fan

x. Magnehelic gauges – inspect to ensure proper parameters set

c. Booth Enclosure – Inspect/repair the following items:

i. Wall and ceiling panels for leaks and proper sealing – touch up if required

ii. Inspect light lenses for scoring and damage

iii. Inspect lights for burned or broken tubes

iv. Vacuum Floors

v. Inspect Caulk Seams and touchup as needed

vi. Pressure Wash Paint Booth, Floors, Pits, and Exhaust fans

vii. Equipment doors and view windows for proper sealing and damage

viii. Personnel door and window for proper sealing and damage

ix. Closure latches for proper operation

d. General Conditions

i. Test E Stops

ii. Test Function of controls (run through each stage or observe as painter works)

iii. Examine and repair, if needed, Magnehelic or DP gauges for damage/loose hoses

iv. Examine airlines for leaks and adjust as needed

FA462027QA205

e. Annual cabin cleaning, inspection and repair includes the following:

i. Calibrate or replace instruments as required if available at time of cleaning

ii. Clean light lenses

iii. Examine control panel cooling fans and filters as needed

iv. Change intake and exhaust belts if needed

v. Service flame rod and igniters as applicable

vi. Replace Light Tubes as necessary if available at time of cleaning

vii. Rinse cabin walls

4. Air Shower

a. Inspect and repair equipment/systems described below:

i. Direct Drive Blower

ii. Test E Stops

iii. Test Function of controls (run through each stage)

iv. Electronic Controls enclosure

v. Touch screen control panel

vi. Electrical junction box

vii. High velocity adjustable air nozzles

viii. Return and supply air ducts

ix. Pressure transmitters for filters

x. Wall and ceiling panels for leaks and proper sealing – touch up if required

5. Blasting Cabinet

a. Inspect and repair equipment/systems described below:

i. All seals and hoses

ii. All filters

iii. Replace any damaged components

iv. Any scheduled maintenance

6. Air Compressor

a. Inspect and repair equipment/systems described below:

i. Scheduled servicing

ii. Scheduled inspections

iii. Repair and replacement of damaged or broken components.

4.1. SERVICES NOT INCLUDED: Repair and parts necessitated by other than fair wear and tear i.e., abuse, neglect, improper maintenance, either by Contractor, subcontractor, or government personnel as determined by the Contracting Officer (CO).

4.2. MAINTENANCE AND INSPECTION PROGRAM: A positive monthly Preventive Maintenance and Inspection (PMI) program shall be implemented in accordance with the manufacturer’s recommendations. Monthly service shall also include carbon filter sampling for remaining life (submitted as a report IAW para 4.2.4). Monthly inspections shall be coordinated with the corrosion control facility shop supervisor. Contractor will have as a minimum 2 business days to complete the monthly service. All filters requiring replacement shall be replaced during monthly inspections as needed. Roll filters shall be changed monthly during the scheduled PMI. The Contractor at no additional cost to the government shall supply all required replacement filters.

4.2.1. Minor Repairs: All troubleshooting and/or minor repairs that can be made at the time of the PMI shall be conducted at the time the problem was found. Minor repairs and/or adjustments are defined as something requiring less than 30 minutes of labor and consumable items/parts less than $50.00. If the

Contractor doesn’t have the consumable items/parts or manpower to make repairs (includes diagnosis), no additional charges (labor, parts, and material) shall be billed to the government for associated subsequent trips to repair that minor deficiency.

FA462027QA205

4.2.2. Consumable Items: The Contractor at no additional cost to the government shall supply consumable items such as grease, filters, minor parts and/or materials under $50.00, etc. as may be needed

4.2.3. Billable Repairs: Billable “Repairs” are not to be initiated during a PMI Service. Present the

Corrosion section lead and the CO with a separate price quote for other than minor repairs as listed in paragraph 4.2.1. This type of repair service shall be rescheduled later and not performed until the CO authorizes the repair. If the unit is nonfunctional during a PMI, the CO must be notified before the repairs are initiated.

4.2.4. Maintenance Reports: The Contractor shall develop and submit all reports to the CO, summarizing all maintenance performed. Reports shall be submitted within 5 business days after inspections and maintenance. The report shall identify maintenance tasks performed during inspections and identify maintenance and repair discrepancies noted during the inspection that have not yet been repaired.

4.2.5. INTERVENING REPAIRS: Will be on an as required basis, with response time not to exceed 8 hours during paint booth normal operations, (7:00 AM-4:30 PM), excluding weekends and federal holidays (e.g., since an 8-hour response time is required, and the operating hours are 7:00 a.m. to 4:30

PM, then a call to the maintenance Contractor at 2:00 PM would require a physical response from the maintenance Contractor no later than 1:00 PM the following workday). Field Service Technicians (FST) will be physically present, have proper test equipment, parts, and tools, and be ready to begin work within the time specified above. The Contractor shall provide effective maintenance and repair of all paint booth equipment identified by this SOW.

4.2.5.1. Contractor shall have a point of contact available to respond back to government personnel not later than 1 hour after notification of a repair call. Contractor shall submit work orders to the Corrosion section lead and the CO prior to leaving the work site and job completion.

4.2.5.2. When the service is completed, the FST shall document services rendered on a legible service report. All service reports shall be submitted to the equipment user for an “acceptance signature” and to the Corrosion section lead for an “authorization signature”. If the Corrosion section lead is unavailable, a signed authorized copy of the service report will be sent to the Contractor after the work can be reviewed

(if requested or noted on the service report).

4.2.6. REPLACEMENT PARTS:

Replacement parts for Billable or Intervening Repairs are required to be supplied by the Contractor.

Replacement parts are required to be new or refurbished with full warranties from the original equipment manufacturer (OEM). If OEM parts are not obtainable, the government will evaluate for approval suitable substitutes on a case-by-case basis. The government reserves the right to inspect parts and material prior to proper disposal.

4.2.7. Reimbursable Parts and Labor: The Contractor shall provide a written estimate for the required maintenance/repairs to the government within two (2) workdays after initial service call for Billable or

Intervening Repairs. This written estimate shall include the estimated cost of itemized labor, parts, and materials for the needed repair. The Contractor shall be responsible for replacement parts and labor costs up to but not exceeding $50.00 per occurrence. Upon CO approval, the Contractor shall commence repair work.

• Labor: The labor rate will be set at negotiated rate at time of award.

• Parts/Materials: Replacement parts/materials needed exceeding $50.00 in value will be reviewed by CO. Contractor will provide actual parts cost breakout to CO for review prior to repair. The parts mark up will be the negotiated rate at time of award.

4.2.8. SPECIAL QUALIFICATIONS: The Contractor shall provide the name and telephone number of the Contractor’s on-site contract manager and alternate responsible for all requirements in the SOW. The

FA462027QA205

contract manager and alternate(s) must be able to read, write, speak and understand English, or an interpreter must be provided to work alongside the contract manager or alternate(s) at no additional cost to the Government.

4.2.8.1. The Contractor shall be fully staffed on the first day of work under the contract. The staff includes fully qualified employees who have been professionally trained to perform the work. Individuals who are performing the work must be experienced, fully qualified, speak and understand English, and a regular employee of the Contractor; day laborers are not acceptable. "Fully Qualified" is based upon training and on experience in the field. For training, the employee has successfully completed a formalized training program on the type of equipment to be serviced. For field experience, employees must have as a minimum two years of experience (except for equipment newly on the market) with respect to scheduled and unscheduled preventive and intervening repair maintenance of equipment listed in this contract.

4.3. ENVIRONMENTAL AND HAZARDOUS MATERIALS HANDLING: In addition to all applicable Federal, State and local environmental codes and regulations, the following specific guidance is provided:

4.3.1. The Government POC shall approve all hazardous materials brought on-site by the Contractor prior to use. The Contractor shall obtain approval using the application requirements of the AF Form 3952.

Once the process is implemented and Contractor is trained, the Contractor may submit the AF Form 3952 electronically to the email address provided upon contract award.

4.3.2. The Government POC has the right to prohibit the use of hazardous materials it deems to be especially hazardous to human health and environment. In the event the Government POC does not approve a hazardous material for use, the Government POC may provide the Contractor a list of suitable substitutes; however, the Contractor shall retain responsibility for finding an acceptable substitute. The

Contractor shall take appropriate actions to comply with waste minimization and pollution prevention practices and policies.

4.3.3. The Contractor shall furnish an AF Form 3952 or equivalent electronic worksheet to the Base

HAZMAT office (HAZMO), through the Government POC, for anticipated quantities, application of use, and method of disposal for all materials to be used under this SOW. The listing shall include, but not be limited to, lubricants, spray cleaning solvents, and any known hazardous materials.

4.3.4. Contractor Data Reporting: To facilitate government compliance with NOC #1842, the

Contractor shall document all maintenance activities, inspections, and material usage. All maintenance, pressure-drop logs, and filter change-out records be retained on-site for a minimum of 24 months and made available to SRCAA personnel upon request, in accordance with Condition 17 of NOC #1842. The

92 CES Environmental Office will provide a "Paint Booth Activity Log" to the Corrosion section lead.

The Contractor shall be responsible for completing this log during each site visit. Information to be logged includes, at a minimum:

• Date of service visit

• Technician name

• Description of maintenance performed

• Pressure drop readings before and after any filter replacement

• Date of filter replacement

• Quantity and type of all solvents, cleaners, degreasers, or other chemical products used during the performance of maintenance activities

Categorical Exclusion (CATEX) Citations:

• DoW A53-1: Routine repair and maintenance of buildings, facilities, launch pads, structures, utility/communication systems, airfields, grounds, parking areas, targetry and other stationary equipment on existing ranges, and fencing; includes associated components and equipment.

• DoW A91-9: Repairing and replacing real property installed equipment.

Rationale:

FA462027QA205

• This project is a routine service contract for the preventative maintenance, inspection, and filter replacement of existing, operational paint booths and blast cabinets in Building 2050. The equipment is already installed and fully permitted under SRCAA NOC Permit #1842. No physical construction, footprint expansion, or change in the existing operating envelope is authorized. No extraordinary circumstances exist. The action is categorically excluded from further NEPA review.

4.3.5. The Contractor's attention is directed to Hazardous Chemical Reporting (40 C.F.R. Part 370), Toxic

Chemical Release Reporting: Community Right to Know (40 C.F.R. Part 372), which includes the following: Chemicals with special characteristics which in the opinion of the manufacturer can cause harm to people, plants, or animals when released by spilling, leaking, pouring, emitting, emptying, discharging, injecting, escaping, leaching, dumping or disposing into the environment (including the abandonment or discarding of barrels, containers, and other receptacles).

4.3.6. Safety Data Sheets: The Contractor shall submit a copy to the Government POC of all hazardous safety data sheets (SDS) describing the hazards of any chemical used in the performance of this contract.

This file shall be made available for review immediately upon request. The Contractor shall request from his supplier a SDS for each new material ordered. These sheets will then be placed in the hazardous material data sheet file. This is in addition to the requirements of FAR clause 52.223-3, Hazardous

Material Identification and Material Safety Data.

4.3.7. The Contractor shall maintain spill control material on hand at all times sufficient to contain a worse case spill, both volume and hazard level.

4.3.7.1. For any spills caused by or resulting from the Contractor's action or inaction, the Contractor shall provide all necessary manpower, equipment and material to implement all spill response, containment, cleanup and reports required by Federal, State, and local laws, regulations and standards. The Contractor shall be responsible for any damage resulting from Contractor caused spills. The Contractor shall report any spills to the CO immediately.

4.3.8. Material Disposal: The Contractor shall dispose of all hazardous materials removed from the paint facility and associated equipment under this contract either at an off base location or to BLDG 2050, Fairchild AFB Hazardous Waste Accumulation Site, in accordance with (IAW) applicable federal, state, and local pollution laws and regulations. The contractor will store all coatings, wash solvents, and solvent-contaminated waste materials in closed containers at all times, in accordance with Conditions 14 and 15 of NOC #1842. The government will not provide containers or packaging material. Containerized hazardous materials shall be disposed of not later than 48 clock hours after job completion, and not be stored in a place that causes any disruptions. The point of contact and phone number of the Fairchild AFB

Hazardous Waste Accumulation Site will be provided upon contract award.

4.3.8.1. All filters (except carbon filters and pre-filter intake on the main doors) removed from within the paint booth inserts are considered hazardous material. Proper personnel protective equipment shall be worn during the removal process.

5. GOVERNMENT FURNISHED EQUIPMENT AND SERVICES:

5.1. Government Furnished Utilities: The government will furnish utilities to include telephone, electricity, and water. The Contractor shall not change or modify any utility system or component; or connect any Contractor property, equipment or system without prior CO review and approval. The

Contractor shall practice energy conservation in the Government provided facilities.

5.2. Refuse Collection: The Contractor shall provide bulk containers to dispose of trash or refuse generated from accomplishment of services detailed in this SOW.

5.3. Police and Fire Protection and Medical Care: The government will provide police and fire protection. In the event of an emergency (life or limb), Fairchild Fire Emergency Services will respond and

FA462027QA205

treat, if necessary, an outside ambulance agency will transport the contract employee to the nearest emergency medical facility. The Contractor shall have the responsibility to reimburse the outside ambulance agency for services rendered.

5.4. Damages: Damages to Government buildings, equipment, are addressed in clause 52.237-2

“Protection of Government Buildings, Equipment, and Vegetation.”

6. SECURITY REQUIREMENTS: All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the government installation, shall abide by all Fairchild Air Force Base security regulations. Individuals must be able to pass a background check that will be conducted prior base entry. Individuals performing the work will be required to provide their full name, DOB, SSN, and a REAL ID act compliant ID to get a pass and gain access to the installation. Once on base, if working in a controlled area, contractor personnel performing the work will either be on an EAL signed by the commander owning the controlled area allowing them unescorted access or be escorted by a person authorized into that controlled area.

7. PLACE OF PERFORMANCE: All work shall be performed on Fairchild Air Force Base, WA

99011.

8. GENERAL INFORMATION:

8.1. HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding

Federal Holidays and any other designated down day. Work can be done at other than the normal hours of operation with the approval of the Contracting Officer. The Contractor shall coordinate in advance all hours of work and any service interruptions with the Aircraft Structural Maintenance Shop points of contact.

January 1 New Year’s Day

3rd Monday in January Martin Luther King, Jr. Day

3rd Monday in February President’s Day

Last Monday in May Memorial Day

June 19 Juneteenth

July 4 Independence Day

1st Monday in September Labor Day

2nd Monday in October Columbus Day

November 11 Veterans Day

4th Thursday in November Thanksgiving Day

December 25 Christmas

9. APPENDICES:

Appendix A: Equipment List

FA462027QA205

Appendix A: Equipment List

The following equipment is the machinery that will be serviced during the period described:

1. Rhoner paint and sanding booth R20200404

2. Pauli Ram 35B Dry Stripping Machine

3. Rogers Model KI-30-125 air compressor

4. Atlas Copco Airpower 815300385 Compressor

5. SPX Flow air dryer Model #HPRN125

FA462027QA205