Statement of Work Summary
This Statement of Work outlines the disassembly and replacement of damaged shelving at Fairchild Air Force Base in Washington. The contractor must disassemble and dispose of two (2) existing Independent Adjustable Racking Systems (IARS) sections and supply, deliver, and install two (2) replacement IARS sections (BANAIR brand or equal, part number IARS 5248) into the existing Tactical Rack System. All materials must be new with no refurbished items accepted. Standard manufacturer warranties on parts and labor rates shall apply. The work must be completed within 60 days after receipt of order (ARO), with work limited to operating hours of 0700-1630 Monday through Friday, excluding federal holidays. The location is 92nd LRS Warehouse, Fairchild AFB, Washington.
The replacement shelving sections must meet specific salient characteristics including nominal dimensions of approximately 38 feet in length and 4 feet in depth, maximum vertical height of 25 feet, adjustable shelving with 6-inch vertical increments, and a weight capacity of 2,500 pounds per shelf. The system comprises 96 total storage positions (16 bay positions at 52"W x 48"D at 22'H, plus 80 adjustable pallet positions and 16 top shelf positions). All feet must be anchored to the ground, and shelves must have forklift tine slots. The contractor must detach the fire suppression support cable from the old IARS and attach it to the inside row of the new system. All contractor personnel must pass background checks and provide personal identification information (full name, date of birth, Social Security Number, driver's license state and number) for base access. Personnel will be escorted during installation and must comply with all Fairchild AFB security regulations. Contract number is FA462026QA258, Amend 0002.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26QA258 Amend 2 SF30.pdf | ||
| 26QA258 COMBO (REV1).pdf | ||
| 26QA258 Amend 1 SF30 .pdf | ||
| FYA26QA258 COMBO.pdf | ||
| Attach. 2 - Air Force Specific Terms and Conditions.pdf | ||
| Attach. 1 - Statement of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
2447A Replacement Shelves
April 2026 May 18 2026
FA462026QA258, Amend 0002 Attach. 1 - Statment of Work
1180287074C Cross-Out
Statement of Work (SOW) For
Shelving Replacement Fairchild AFB, WA
1. BACKGROUND: Disassemble and replace damaged shelving at a single location on Fairchild Air Force Base.
2. SCOPE OF WORK: The contractor shall disassemble and dispose of two (2) existing Independent Adjustable Racking Systems (IARS) sections. The contractor shall supply, deliver and install two (2) replacement IARS sections into the existing Tactical Rack System (IARS).
3. OBJECTIVES: Maintain safe and efficient operation of warehouse by obtaining and utilizing adjustable shelving.
4. REQUIREMENTS: The contractor shall provide BRAND NAME BAN AIR or equal adjustable shelving meeting the salient characteristics as specified in the appendices and by CLIN 0001. All parts provided shall be new. No refurbished materials will be accepted. Standard manufacturer warranties on parts and labor rates shall apply.
5. DELIVERY: All work shall be completed, inspected, and accepted within 60 days ARO.
6. SECURITY REQUIREMENTS: All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the government installation, shall abide by all Fairchild Air Force Base security regulations. Personnel performing the work requested will be escorted for the duration of the installation. Individuals must be able to pass a background check that will be conducted prior to entry of the installation. Individuals performing the work will be required to provide their full name, DOB, SSN, driver’s license issuing state and license number to gain access to the installation.
7. PLACE OF PERFORMANCE: All work will be performed on Fairchild Air Force Base in the buildings/locations specified in the appendices and by CLIN.
8. GENERAL INFORMATION:
8.1. HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding Federal Holidays and any other designated down day. Work can be done at other than normal hours of operation with the approval of the Contracting Officer. The contractor shall coordinate in advance all hours of work and any service interruptions with points of contact identified in the appendices and by
CLIN.
January 1 New Year’s Day 3rd Monday in January Martin Luther King, Jr. Day 3rd Monday in February President’s Day Last Monday in May Memorial Day June 19 Juneteenth July 4 Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day November 11 Veterans Day 4th Thursday in November Thanksgiving Day December 25 Christmas
FA462026QA258, Amend 0002 Attach. 1 - Statment of Work
92d Contracting Squadron
9. APPENDICES:
Appendix A: LRS CLIN 0001 Shelving 2447A Appendix B: Shelving Drawings
Appendix A: LRS CLIN 0001 Shelving 2447A
BRAND NAME OR
EQUAL
Part Number Item Description Qty
IARS 5248
New BANAIR Tactical Racking Shelving sections that will interconnect with the existing BANAIR Independent Adjustable Racking Systems
(IARS) 2
Salient Characteristics:
1. Nominal dimensions of approximately 38 feet in length and 4 feet in depth
2. Maximum vertical height of up to 25 feet
3. Adjustable shelving with vertical increments of 6 inches
4. Structural design to safely support a wide range of equipment, weights and types
5. Total bay positions 52"(W) x48"(D) @ 22' (H) = x16
6. Adjustable pallet positions = x80Type 52in x 48in (WxD) - Medium DutyRate: 2000 lbs -
(908 Kg) MAX UD
7. Top shelf position = x16 Rate: 2000 lbs - (908 Kg) MAX UD TOTAL STORAGE
POSITIONS = x96
8. Weight Capacity per shelf, 2,500 LBS
9. Anchor each foot to the ground for safety
10. Detach Fire suppression support cable from old IARS and attach to inside row
11. Shelves must have forklift tine slots.
FA462026QA258, Amend 0002
FA462026QA258, Amend 0002
Detach Cable from left shelf and connect to the right
Appendix B: Shelving Drawings FA462026QA258, Amend 0002
FRONT ELEVATION - 5 BAY EXAMPLE
(TYPICAL)
END ELEVATION
PLAN VIEW (TYPICAL)
4'-9" [1455]
24'-9" [7545]
22' [6706]
22' [6705]
7" [170]
9'-7" [2910]
14'-4" [4365]
19'-1" [5820]
4'-9" [1455]
4'-9" [1455]
4'-9" [1455]
4'-2" [1276]
4'-1" [1234]
See layout plan and elevations for full system details.
24'-6" [7459]
4' [1214]
4'-4" [1325]
4'-9" [1455]
IARS 5248 (R1-R2)
TOTAL BAY POSITIONS
52"(W) x48"(D) @ 22' (H) = x16
ADJUSTABLE PALLET POSITIONS = x80 Type 52in x 48in (WxD) - Medium Duty Rate: 2000 lbs - (908 Kg) MAX UD
TOP SHELF POSITIONS = x16 Rate: 2000 lbs - (908 Kg) MAX UD
TOTAL STORAGE POSITIONS = x96
PRODUCT COLOUR
RACK - BLACK (RAL 9005)
PALLETS, TOP SHELVES &
DRAWERS - GREEN (RAL 6007)
PROTECTORS - YELLOW
(RAL 1028)
OPTION 1
STORAGE LAYOUT
IARS 5248 22' HIGH c/w ADJUSTABLE PALLETS
NOTES
REV DESCRIPTION DATE BY
- PROPOSED DRAWING 09/03/2026 TB
LOCATION:
STATUS:
DESCRIPTION:
Storage Layout Elevations
92nd LRS Warehouse, Fairchild AFB, Washington
PRELIMINARY
FA462026QA258, Amend 0002