This is a Standard Form 30 Amendment to Solicitation FA462025QA974 issued by the 92nd Contracting Squadron at Fairchild Air Force Base for a shoot house addition project. The amendment updates the Statement of Work and provides responses to eight contractor questions regarding specific construction details, including interior flooring (treated plywood), doors/windows, gravel pad, exterior painting, removable walls, pass-through sealing, and gap sealing between existing and new structures. Key clarifications include that only the shoot house addition will be painted, removable walls should be wood matching the existing structure, and the space between structures must be 100% sealed against wildlife entry.
The amendment indicates that a government point of contact will periodically check project progress, and contractors will receive badges for the project duration. Offerors are instructed to fill out specific blocks on the form and provide a copy with their proposal. The effective date of the amendment is 8 August 2025, and the original solicitation was dated 28 July 2025. No pricing details or specific contract award information is provided in this amendment document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0004.pdf | ||
| Attachment 1 - Statement of Work (Rev 01).pdf | ||
| Amendment 0002.pdf | ||
| 25QA974 Combo (Rev. 01).pdf | ||
| Amendment 0001.pdf | ||
| 25QA974 Combo.pdf | ||
| Attachment 1 - Statement of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXCEPTION OF SF 30, APPROVED BY NARS 5/79
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
FA462025QA974
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
8 August 2025
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY
CODE
FA4620 7. ADMINISTERED BY (If other than Item 6)
CODE
92nd Contracting Sq./PKA 110 W Ent St., Suite 200 SAME AS BLOCK 6 Fairchild AFB, WA 99011 Attn: sarah.oneil.1@us.af.mil@us.af.mil
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.
X
FA462025QA974
All Offerors 9B. DATED (SEE ITEM 11)
28 July 2025
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [] is extended, [x] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning _1_ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [] is not, [] is required to sign this document and return __ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SEE SUMMARY OF CHANGES
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10 A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
SARAH J. O’NEIL, Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105-03 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FA462025QA974
Amendment 0003 Page 2
SUMMARY OF CHANGES
The purpose of this Amendment is to revise the Statement of Work and answer questions submitted by offerors.
See “Attachment 1 – Statement of Work (Rev 01)”
Q1: Does the interior flooring need any covering like the existing structure?
A1: Yes, the flooring should match the treated plywood like the existing structure.
Q2: Should the doors/windows be the same as existing?
A2: Yes, see photos in Amendment 002.
Q3: Do you want the gravel pad/space extended? If so, by how much? Do you need smaller rocks? Do you want the contractor to compact it?
A3: No additional gravel will be needed for this project. The existing gravel pad/space is adequate for the shoot house addition. The current condition of gravel will remain as is, and it is up to the contractor’s means and methods if they would like to level/compact it for installation.
Q4: Do you want the exterior paint done on the other existing structures?
A4: No, painting will only be done on the exterior of the shoot house addition under the scope of work for this project. The SOW has been revised to remove any interior painting.
Q5: What material should the removable walls be?
A5: They should be wood, identical to the existing structure.
Q6: Should the pass through be 100% sealed/covered?
A6: Yes, please see SOW.
Q7: Should the space between the existing structure and addition be 100% sealed, if the gap is large due to existing bolts?
A7: Yes, the space between the existing structure and addition should be 100% sealed if the gap is large enough for birds, bees, wildlife, etc., to enter/inhabit. Seals within the scope of this project should be metal, trip resistant, and weather resistant.
Q8: Will there be a Government POC on site for the entire duration of the installation?
A8: No, a Government POC will periodically check-in to see progress of the installation. Additionally, contractors will receive badges for the duration of the project. The SOW has been revised to reflect this change.
Fill out blocks 15a, 15b, and 15c and provide a copy with your proposal.