Amend 04 - Answer Questions.pdf
PDF 710 KB Posted
- Attached to
- Substation Tap Changer Assessment
- Solicitation number
- FA462024QA961
About this file
This document is an amendment to a solicitation for a federal contract opportunity for the assessment of two substation tap changers on Fairchild Air Force Base in Washington. The amendment provides answers to questions from contractors regarding responsibilities, scheduling, and testing requirements for the work.
Key details include:
- The government will be responsible for power isolation/de-energization and re-energization of the substations, as well as installing the safety ground cables.
- Two weeks' notice is required for scheduled outages, and the substations can be taken offline for a few weeks as necessary for repairs.
- Work can be performed during normal business hours Monday-Friday, with the possibility of other hours with prior approval.
- The government will provide SEL relay settings and access to a site visit sign-in sheet after award.
- No site-specific training is required, and the oil does not need to be drained or the LTCs opened for inspection.
- The solicitation number is FA462024QA961 and the opportunity type is a solicitation for the assessment of the substation tap changers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXCEPTION OF SF 30, APPROVED BY NARS 5/79
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
FA462024QA961
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
08 August 2024
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY
CODE
FA4620 7. ADMINISTERED BY (If other than Item 6)
CODE
92nd Contracting Sq./PKA 110 W Ent St., Suite 200 SAME AS BLOCK 6 Fairchild AFB, WA 99011 Attn: robert.bennett.36@us.af.mil
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.
X
FA462024QA961
All Offerors 9B. DATED (SEE ITEM 11)
2 July 2024
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [] is extended, [ ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning _1_ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [] is not, [] is required to sign this document and return __ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SEE SUMMARY OF CHANGES
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10 A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
1Lt Robert Bennett, Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105-03 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FA462024QA961
Amendment 0001 Page 2
SUMMARY OF CHANGES
The purpose of this Amendment is to answer questions proposed by contractors:
1. Who is responsible for Power isolation/ de-energization and re-energization of the substations?
a. Base Electric Shop
2. Who installs the safety ground cables for LOTO?
a. Base Electric Shop
3. What are the challenges/limitations in scheduling the outages?
a. Two week notice for scheduled outages will be required
4. How much notice is required to take down the substations?
a. See answer to question 3
5. How long can the substations be off-line for test & inspection?
a. A few weeks, as necessary for repairs. Coordination shall be conducted with the 92d
Civil Engineering Squadron point of contact after award.
6. Can they be taken off-line for test & inspection on consecutive days?
a. Yes
7. What is the completion date?
a. Contractor will determine PoP in CLIN0001 on the combo document when the quotes are submitted
8. Will work be performed during the day/night, weekday or weekend?
a. Per 6.1 of the SOW, “Hours of operation are 0700-1630 Monday through Friday, excluding Federal Holidays and any other designated down day. Work can be done at other than the normal hours of operation with the approval of the Contracting Officer.
The contractor shall coordinate in advance all hours of work and any service interruptions with 92d Civil Engineering Squadron points of contact.”
9. Will you provide SEL relay setting before work commences?
a. Yes, it will be provided in (.rdb) file format after award
10. Is there any site-specific training required before work commences?
a. No
11. Do you want the oil drained and LTC’s opened up for inspection?
a. No
12. When was the last time they were tested?
a. Mar-April 24
13. Are the two substations parallel?
a. No, not authorized
14. Can the government provide the timeline of events when the issues started?
a. Started in 2017 with the north substation. Happens maybe once or twice each year during cold climate. South substation problem happened in summer of 2023. See official events that took place in March 2024 per our High Voltage Lead:
“On 5 March 2024 @ 0621 I received an EMCS text message for “Phase A, B, and C High Volts Alarm. Distribution voltage was close to 15kV and 128V on my office outlets.
SEL-2414 is always in “auto” mode.
I went to the north substation (base is currently 100% on the North for S. Substation maintenance). Analog tap changer was maxed on +16 and the SEL-2414 was on -15. I tried to calibrate the tap setting using the HMI to tap setting 0 or -1 but only the SEL-2414 digital display changed, not the physical analog tap changer, it was still on +16.
I went out to the cabinet where the SEL-2414 is located and manually pulled the “ZF” relay to tap it down to match what the SEL-2414 is displaying.
Once aligned, I then changed the SEL-2414 from auto to manual mode and pressed the tap up/down buttons and it worked perfectly. I then placed it back in auto mode and tried from the HMI. Again, only the digital display changed. I set it back in alignment with the analog display and left it alone in auto and on tap setting -1.
[As of] 11 March 2024 it has since changed itself and is currently on -2 tap.”
15. Can the government provide the sign-in sheet for the site visit?
a. Attachment 4 – Site Visit Sign-In as been added.
Fill out blocks 15a, 15b, and 15c and provide a copy with your proposal.
END SUMMARY OF CHANGES