Amendment 002.pdf
PDF 327 KB Posted
- Solicitation number
- FA462022QA145
About this file
This document is an amendment to a solicitation for a federal contract opportunity. The amendment provides answers to questions from offerors regarding the required products and services. The contractor must provide a certified VideoXpert video management system and Pelco brand security cameras for buildings 1250, 2257, 2259, and 2266 at Fairchild Air Force Base. The contractor is responsible for running fiber optic cable between the communication rooms and network switches in each building. CAT6 patch panels must be installed for camera cabling and lockable equipment racks are required for the switches and panels. No award date is specified. The Department of the Air Force Air Mobility Command is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 FA462022QA145 REV 2.pdf | ||
| Amendment 00001.pdf | ||
| JA_Redacted.pdf | ||
| FA462022QA145.pdf | ||
| Attachment 1 Statement of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXCEPTION OF SF 30, APPROVED BY NARS 5/79
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
24 AUGUST 2022
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY
CODE
FA4620 7. ADMINISTERED BY (If other than Item 6)
CODE
92nd Contracting Sq./PKA 110 W Ent St., Suite 200 SAME AS BLOCK 6 Fairchild AFB, WA 99011 Attn: zachery.ray.2@us.af.mil
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (√) 9A. AMENDMENT OF SOLICITATION NO.
X
FA462022QA145
All Offerors 9B. DATED (SEE ITEM 11)
29 JULY 2022
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [] is extended, [ X ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [] is not, [x] is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SEE SUMMARY OF CHANGES
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10 A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
CLIFFORD C DOCKTER, Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105-03 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FA462022QA145
Amendment 002 Page 2
SUMMARY OF CHANGES
The purpose of this Amendment is to provide answers to the following questions:
Q1. Will the government provide the expected locations/floors of the GFE switches for each building?
A1:
Bldg. 1250 Comm Room Numbers:
1st Floor - A126, B107, and C126; 2nd Floor - A226 and C226; 3rd Floor – A326 and C326
Bldg. 2257 Comm Room Numbers:
2nd Floor – 205; 6th Floor – 601 Behind Electrical Room
Bldg. 2259 Comm Room Numbers:
2nd Floor – 205; 6th Floor – 601 Behind Electrical Room
Bldg. 2266 Comm Room Number:
1st Floor – Mechanical (SOW Pg. 88)
Q2. No Com room was identified for building 2266. Is there a COM room (s), and where is it located?
A2: Bldg. 2266 Comm Room Number: 1st Floor – Mechanical (SOW Pg. 88)
Q3. Is it acceptable to add a CAT6 Patch panel to run all camera cabling to and patch the switch, or do the cables need to be terminated directly into the network switch?
A3:
A. All cameras terminating in each respective communication room will terminate to a CAT 6 Patch panel.
B. Each floor will have a 6 Strand tight tube horizontal multimode fiber cables to switches (Bldgs. 2257 and 2259 Floors 1-6) will be Lucent Connector (LC) to LC Ultra-Physical Contact (UPC) Splice connect/tray terminations, color orange, and 62.5 micron. Ensuring proper communication between switches, the contractor may coordinate with 92d CS Infrastructure. Main switch on the second floor will communicate with all floors for direct home runs with each switch. No daisy chaining switches allowed.
C. Fiber will connect to the fiber patch panel located on the 2nd floor Room 205 ST terminated and at the switch LC, color yellow, and single mode. This connection is on the main fiber point of presence.
Patch panel will connect to the GFE Switch(es). Currently, there is no existing fiber runs between floors. However, this building does have dedicated fiber to another building which connects to the base network.
D. After fiber is installed, fiber will be tested by the contractor using shall follow ANSI/TIA/EIA industry standards, using certified Power Meters and Optical Time Domain Reflectometer (OTDR). Test results shall be provided to 92d CS/SCXP in PDF format.
Q4. Is the government providing all network interconnection required between the switches?
A4: No, the contractor is responsible for running fiber between each building’s communication room network switches. Please review A3 for additional information.
FA462022QA145
Amendment 002 Page 3
Q5. Can the existing racks in 1250 be used for the NVR and expected camera patch panels?
A5: The NVR will be housed in Bldg. 2248 in a Government Furnished Equipment rack with an Uninterrupted Power Supply (UPS). This will be the 2nd NVR. The rack will also provide a GFE network switch. If GFE pre-existing racks have available space, the CAT 6 Ethernet Patch Panels can be used.
Q6. Are Lockable racks needed for buildings 2257, 2259, and 2266 for the camera patch panels or GFE switches?
A6: Bldgs. 2257, 2259, and 2266 lockable racks are required and GFE network switches and contractor provided CAT 6 Patch Panels and UPS will be co-located inside the locked racks. Bldg. 1250 GFE racks can be used provided there is available space.
Fill out blocks 15a, 15b, and 15c and provide a copy with your proposal.
END SUMMARY OF CHANGES
List of Attachments n/a
24 AUGUST 2022