DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 92D AIR REFUELING WING (AMC)

FAIRCHILD AIR FORCE BASE WASHINGTON

6 April 2021

FROM: 92 CONS/PKB

110 W. Ent Street Fairchild AFB, WA 99011-8568

SUBJECT: Project FSS Esports Electrical Outlets, Fairchild AFB, WA

1. The purpose of this is to answer questions proposed by MATOC contractors.

a) Question: Is it a correct assumption that the new 3 phase electrical panel will be located in room 219? If so, is there a designated location for the new panel?

Answer: Yes. The panel can be placed above or adjacent to L8 in room 222 (esports room is 219)

b) Question: What is the pipe made of?

Answer: We do not have this information in our database. The lines are of various ages and will likely vary in type.

c) Question: Has Panel L8 been tested and verified that there is 100amps of power still available from that existing panel, to feed the new 3 phase panel?

Answer: I believe this to be true; however, I do not know for certain

d) Question: What type of ceiling are in rooms 222,217, and 219 respectively. Drop Ceiling or solid Drywall/ plaster?

Answer: eSports room 219 is a drop ceiling; 217 (mech room) and 222 (panel room) are hard ceiling

e) Question: Only for Clarity there is no network piping or wiring that is a part of this solicitation correct?

Answer: Correct

f) Question: Wall in room 219 are Drywall or plaster and what kind of wall finish is there presently?

Answer: Standard construction orange peel and paint image1.png