FA462021R0003-QandA.docx
DOCX document 100 KB Posted
- Attached to
- Esport Electrical Outlets Federal contract opportunity
- Solicitation number
- FA462021R0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch 4 ACM Results.pdf | ||
| Solicitation - FA462021R0003.pdf | ||
| Atch 3 eSports Power_Network Rqmts 12 desks.pdf | ||
| Atch 5 Lead Results.pdf | ||
| Atch 2 eSports Electrical Schematic_Rm 220 Panel L8.pdf | ||
| Atch 1 SOW-16Mar21.pdf | ||
| Atch 6 Wage Determination - WA20210017.txt | TXT text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 92D AIR REFUELING WING (AMC)
FAIRCHILD AIR FORCE BASE WASHINGTON
6 April 2021
FROM: 92 CONS/PKB
110 W. Ent Street Fairchild AFB, WA 99011-8568
SUBJECT: Project FSS Esports Electrical Outlets, Fairchild AFB, WA
1. The purpose of this is to answer questions proposed by MATOC contractors.
a) Question: Is it a correct assumption that the new 3 phase electrical panel will be located in room 219? If so, is there a designated location for the new panel?
Answer: Yes. The panel can be placed above or adjacent to L8 in room 222 (esports room is 219)
b) Question: What is the pipe made of?
Answer: We do not have this information in our database. The lines are of various ages and will likely vary in type.
c) Question: Has Panel L8 been tested and verified that there is 100amps of power still available from that existing panel, to feed the new 3 phase panel?
Answer: I believe this to be true; however, I do not know for certain
d) Question: What type of ceiling are in rooms 222,217, and 219 respectively. Drop Ceiling or solid Drywall/ plaster?
Answer: eSports room 219 is a drop ceiling; 217 (mech room) and 222 (panel room) are hard ceiling
e) Question: Only for Clarity there is no network piping or wiring that is a part of this solicitation correct?
Answer: Correct
f) Question: Wall in room 219 are Drywall or plaster and what kind of wall finish is there presently?
Answer: Standard construction orange peel and paint image1.png