FA462021R0003-QandA.docx

DOCX document 100 KB Posted

Attached to
Esport Electrical Outlets Federal contract opportunity
Solicitation number
FA462021R0003
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to Esport Electrical Outlets, newest first.
File Type Posted
Atch 4 ACM Results.pdf PDF
Solicitation - FA462021R0003.pdf PDF
Atch 3 eSports Power_Network Rqmts 12 desks.pdf PDF
Atch 5 Lead Results.pdf PDF
Atch 2 eSports Electrical Schematic_Rm 220 Panel L8.pdf PDF
Atch 1 SOW-16Mar21.pdf PDF
Atch 6 Wage Determination - WA20210017.txt TXT text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 92D AIR REFUELING WING (AMC)

FAIRCHILD AIR FORCE BASE WASHINGTON

6 April 2021

FROM: 92 CONS/PKB

110 W. Ent Street Fairchild AFB, WA 99011-8568

SUBJECT: Project FSS Esports Electrical Outlets, Fairchild AFB, WA

1. The purpose of this is to answer questions proposed by MATOC contractors.

a) Question: Is it a correct assumption that the new 3 phase electrical panel will be located in room 219? If so, is there a designated location for the new panel?

Answer: Yes. The panel can be placed above or adjacent to L8 in room 222 (esports room is 219)

b) Question: What is the pipe made of?

Answer: We do not have this information in our database. The lines are of various ages and will likely vary in type.

c) Question: Has Panel L8 been tested and verified that there is 100amps of power still available from that existing panel, to feed the new 3 phase panel?

Answer: I believe this to be true; however, I do not know for certain

d) Question: What type of ceiling are in rooms 222,217, and 219 respectively. Drop Ceiling or solid Drywall/ plaster?

Answer: eSports room 219 is a drop ceiling; 217 (mech room) and 222 (panel room) are hard ceiling

e) Question: Only for Clarity there is no network piping or wiring that is a part of this solicitation correct?

Answer: Correct

f) Question: Wall in room 219 are Drywall or plaster and what kind of wall finish is there presently?

Answer: Standard construction orange peel and paint image1.png