SF30.pdf
PDF 306 KB Posted
- Attached to
- Gas Mask Washer Install Federal contract opportunity
- Solicitation number
- FA462019QA332
About this file
The purpose of this amendment is to update Appendix A in the PWS to show approximate utility locations that shall be used and to answer previously asked questions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_II_WD_15-5537.pdf | ||
| FA492019QA332_COMBO.pdf | ||
| Attachment_I_PWS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 3
0001 22 Aug 19
FA4620
92ND CONTRACTING SQUADRON
110 W. ENT ST,STE 200
FAIRCHILD AFB, WA 99011
FA462019QA332
13 Aug 19
Contractors are directed to complete blocks 8, 15A, 15B, and 15C and return the signed amendment with their proposal.
SEE CONTINUATION PAGE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this amendment is to: update Appendix A in the PWS to show approximate utility locations that shall be used and to answer previously asked questions.
1. Update Appendix A to reflect the version in this amendment.
2. The washer is split phase, 30A, 220.
3. The contractor shall use the 3 phase electrical cabinet on the south east wall to complete the 2 required circuits.
4. The contractor shall use the drain located between the HVAC and the closet.
5. The drain pipe shall be ran along the floor, next to the wall and under the HVAC electrical dropping into the floor drain.
6. The water heater shall be tank less electric, instantaneously providing consistent minimum of 4 GPM at a temperature of 110 F.
Appendix. E
1376521415C Sticky Note Contractor shall utilize the electrical cabinet in the caged area approximately here.
1376521415C Sticky Note The contractor shall utilize the floor drain next to the HVAC. The drain from the machine shall be ran along the wall and underneath electrical for the HVAC dropping into floor drain.
1376521415C Sticky Note The Contractor shall utilize the water pipe located along the wall in this approximate location.
1376521415C Sticky Note Gas mask washer Shall be installed in this location.
File details come from the government source that posted it.