FA462019QA204_-_Amendment_1.pdf
PDF 200 KB Posted
- Attached to
- Red Morgan Center Sport Court Federal contract opportunity
- Solicitation number
- FA462019QA204
About this file
FA462019QA204 Amendment 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA462019QA204_-_Amendment_2.pdf | ||
| Attch_1_Revised_SOW.pdf | ||
| Attch_2_Site_Vist_SignIn.pdf | ||
| Attachment_1_RMC-Sport_Court_SOW.pdf | ||
| Attachment_2_Drawings_FLOOR_PLAN.pdf | ||
| FA462019QA204,_Rm_Sport_Field.pdf | ||
| Attachment_4__FAFB_OPSEC_Level_0_Measures_(2018).pdf | ||
| Attachment_3_Safety_Data_Worksheet_MSDS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
92ND CONTRACTING SQUADRON
110 W. ENT ST, STE 200
FAIRCHILD AFB, WA 99011
SEE ITEM 6
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
FA462019QA204
9B. DATED (SEE ITEM 11)
19 May 2019
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
0001 5 June 2019
6. ISSUED BY CODE FA4620 7. ADMINISTERED BY (If other than Item 6) CODE FA4620
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
Provide site visit sign-in sheet, answer questions in response to the solicitation and site visit, revise the statement of work, and extend the date for receipt of quotations as stated herein.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. The follow questions were proposed in response to the solicitation and site visit held on 20 May 18 at 10am PST.
Q1: The west side doors open in, is it acceptable for the hinges for these doors to protrude from the dasher board?
A1: No, all hinges for the doors of the sport court system must be flush with the dasher board and may not extend at all beyond the surface of the walls.
Q2: Do the two exterior doors on the non-transparent side of the sport court have to align with the two building exterior doors on that side of the court?
A2: Yes, the doors of the sport court should be positioned so that they align with the building’s exterior doors.
2. As result of the responses to these questions Section 7.1 General Expectations, and Section 8 General Layout Standards have been updated in the attached Revised Statement of Work (5 JUN 18). This revised SOW supersedes all previous additions.
3. The date for receipt of quotations is hereby extended from 6 JUN 19 @ 2:00 pm PST to 18 JUN 19 @ 2:00 pm PST.
4. The following attachments are added:
List of Attachments:
Attachment 1. Revised Statement of Work
Attachment 2. Site Visit Sign-In Sheet
(END OF SUMMARY OF CHANGES)
| 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS |
| 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. |
File details come from the government source that posted it.