Hazmat Survey for Bldg 1256

View the file

Other files for this federal contract opportunity

Other files attached to FA4620-18-Q-A025, newest first.
File Type Posted
SF30_Amendment_05.pdf PDF
SOW_Bldg_1712-1256_Electronic_Locks_12_Sep_18.pdf PDF
SF30_Amendment_04.pdf PDF
SF30_Amendment_03.pdf PDF
SF30_Amendment_02.pdf PDF
SF30_Amendment_01.pdf PDF
Attachment_5_-_J&A_Redacted.pdf PDF
FA462018QA025_-_Combo_RFQ_-SERE_Electronic_Locks.pdf PDF
Attachment_2_-_Section_8_Openings_BDS.pdf PDF
Attachment_3_-_Hazmat_Survey;_bldg_1712.pdf PDF
Attachment_1-_Statement_of_Work_(SOW).pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOUNTAIN CONSULTING SERVICES

9922 E Montgomery Drive; Suite 9

Spokane Valley, WA 99206

509-924-9236

509-924-2287

October 3, 2017

92nd CML Engineering Squadron

100 West Ent Street

Fairchild AFB, WA 99011-9688

MCS Project Number: 17-024.4

Dear Sir’s:

Mountain Consulting Services, (Mountain Consulting) is pleased to provide the enclosed report for the limited asbestos containing building materials survey conducted for the suspect interior wall materials and ceiling tiles present throughout the Bud Day Center in Building 1256 located on

Fairchild AFB, Washington.

Mr. Ryan Yocom, EPA-AHERA Building Inspector, certification: BIR-20170915-06, expiration:

9/15/18; conducted the field survey for this project on September 14th of 2017.

The following tested materials collected from within Building 1256 were proven to be Free of

Asbestos Minerals (ACM-Free):

Off White 2 x 4 Wormhole Acoustical Tiles throughout Building

Gypsum Wallboard Paneling (sheetrock throughout building)

Joint & Taping Compound Mud (of ceiling sheetrock)

The report must be kept on site during renovation activities for worker and regulatory review.

Thank you for choosing Mountain Consulting for these services. If you have any questions, or require any clarification concerning this report, please call me at (509) 924-9236. It was a pleasure working with you, and we look forward to working with you again in the future.

Sincerely, Mountain Consulting Services

Ryan Yocom

AHERA Building Inspector ryocum@mountainconsultingllc.com

FA4620-18-Q-A025

Attachment 04

Bldg 1256 Hazmat Survey mailto:ryocum@mountainconsultingllc.com

LIMITED ASBESTOS MATERIALS SURVEY

FOR THE

SUSPECT BUILDING MATERIALS PRESENT THROUGHOUT

THE BUD DAY CENTER IN BUILDING 1256

LOCATED ON

FAIRCHILD AFB, WASHINGTON

Project Number: 17-024.4

Prepared for:

92ND CML Engineering Squadron

100 W Ent Street

Fairchild AFB, WA 99011-9688

509-247-5020

Prepared by:

Mountain Consulting Services

9922 E Montgomery Drive, Suite 9

Spokane Valley, WA 99206

509-924-9236

October 3, 2017

MOUNTAIN CONSULTING SERVICES

FA4620-18-Q-A025

Attachment 04

October 3, 2017 Mountain Consulting Services

CONTENTS

1.0 INTRODUCTION

2.0 SCOPE OF WORK

3.0 ASSESSMENT SURVEY PARAMETERS

3.1 Homogeneous Areas

3.2 Bulk Sampling

3.3 Laboratory and Analytical Methods

4.0 RESULTS

4.1 Material Containing 1% or More Asbestos

4.2 Materials Assumed to Contain Asbestos

4.3 Materials with Asbestos Concentrations of Less than <1%

4.4 Non-ACM Materials

5.0 CONCLUSIONS AND RECOMMENDATIONS

5.1 Conclusions

5.2 Recommendations

6.0 LIMITING CONDITIONS AND CLOSURE

6.1 Limiting Conditions

6.2 Closure

APPENDICES

A Certification and Accreditation

B Bulk Asbestos Sample Analysis Report

C Bulk Sample Locations Drawing

& Site Photographs

PROJECT NO: 17-024.4

LIMITED ACM SURVEY

October 3, 2017 PAGE 1 Mountain Consulting Services, LLC

LIMITED ASBESTOS SURVEY; IN SUPPORT OF A CCTV SYSTEM PROJECT; BUD

DAY CENTER; BUILDING 1256; FAIRCHILD AFB, WA

1.0 INTRODUCTION

The 92nd CML Engineering Squadron of Fairchild AFB, contracted Mountain Consulting Services, (Mountain Consulting) to conduct a limited asbestos containing materials survey for the suspect interior building materials present throughout the Bud Day Center in Building 1256, located on

Fairchild AFB, Washington. The survey was conducted to facilitate a CCTV systems replacement project.

Mr. Ryan Yocom; EPA-accredited AHERA building inspector, certification: BIR-20170915-06, expiration: 9/15/18, conducted a limited field survey of the identified building area/materials on

September 14thof 2017. [Refer to Appendix A for inspector certifications & laboratory accreditations].

SITE DESCRIPTION

Building 1256 is a newer single-story masonry & steel constructed offices/survival school educations structure, built on a concrete slab foundation. The building is located within the newer survival school buildings complex portion of Fairchild AFB on the southern half of the base accessed from Thorpe Road and Survival Loop.

For this survey only the suspect interior drywall, joint compound and ceiling tiles materials from the

Bud Day Center wing of the building interior were targeted to be tested for asbestos content to facilitate a scheduled CCTV System project. The suspect materials to be impacted for this project were identified by the 92nd CML Engineering Squadron representative.

Fairchild AFB is located west of the City of Airway Heights, Washington in Spokane County. The

Air Force Base is bordered by Highway 2 to the north, Rambo Road to the east, Medical Lake Road to the south, and Graham Road to the west.

2.0 SCOPE OF WORK

ASBESTOS MATERIALS SURVEY: The scope for limited asbestos survey work was designed to meet the requirements for asbestos inspection and due diligence notification in the Occupational Safety and Health Administration (OSHA) Asbestos Standard (29 CFR 1926.1101), the National Emission

Standards for Hazardous Air Pollutants (NESHAP; 40 CFR 61), and applicable portions of the

Asbestos Hazardous Emergency Response Act (AHERA) and regulations in 40 CFR 763.

FA4620-18-Q-A025

October 3, 2017 PAGE 2 Mountain Consulting Services, LLC

This survey was conducted through visual evaluation, classification and analysis of suspected

ACM’s used in the construction or remodeling of the surveyed area/select materials within the identified structure. The survey included the following tasks:

Visual survey and assessment of the location and condition of suspected materials.

Collection and analysis of bulk samples from suspected ACM materials.

Preparation of a report summarizing the identification and assessment of any ACM materials.

3.0 ASSESSMENT SURVEY PARAMETERS

3.1 HOMOGENEOUS MATERIALS

Homogeneous materials are those considered to be consistent throughout an area based on color, texture, and construction era. For the purpose of this survey, homogeneous areas were delineated using the construction era, material composition, and material location as the primary considerations.

Material appearance, texture, size, color, and analytical results may support assumptions about each material’s homogeneity.

3.2 BULK SAMPLING

Suspected ACMs were collected according to guidelines in 40 CFR 763.85 and were sampled to determine the type and percentage of asbestos by volume. At least Two (2) Samples were collected from each selected miscellaneous material type; at least Three (3) Samples from each thermal system insulation (TSI) materials; and suspect surfacing materials were sampled according to the AHERA

“3/5/7 rule” for spray or trowel applied materials.

For other types of suspect materials, or materials assumed to be non-ACM, regulations require the on-site AHERA building inspector to determine the appropriate number of samples. The quantity of material present, manufacturer’s labels, appearance, construction or renovation era, and inspector’s expertise were used to determine the number of samples.

A homogeneous material is considered to be a Regulated ACM if one or more sample results produce greater than 1% asbestos. The EPA recommends that at least three samples be analyzed by polarized-light microscopy (PLM) for the following types of materials in order to prevent false negative results (less then <1% asbestos):

Materials that contain low concentrations of asbestos fibers (less than 10%);

Materials with asbestos fibers tightly bound in a matrix;

Materials with milled asbestos fibers (fine fibers);

Materials with hand-mixed asbestos fibers; and

Materials with a combination of these characteristics.

FA4620-18-Q-A025

October 3, 2017 PAGE 3 Mountain Consulting Services, LLC

All bulk samples must have results below 1% asbestos before the material may be classified in accordance with AHERA rule as not being Regulated ACM. If asbestos is detected in the material at less than <1%, WISHA worker health and safety due diligence regulations still apply.

3.3 LABORATORY AND ANALYTICAL METHODS

Mountain Consulting submitted for analysis Ten (10) bulk asbestos material samples collected from

Five (5) different homogeneous suspect building materials targeted for testing. During laboratory analysis, three (3) bulk samples were sub-divided, and one sample was not analyzed resulting in a total of thirteen (13) samples analyzed for this project.

The samples were submitted for analysis to Mountain Laboratories of Spokane Valley, Washington using proper chain of custody procedures. Mountain Laboratories participates in the national voluntary laboratory accreditation program (NAVLAP) and is a NAVLAP accredited asbestos testing laboratory, NAVLAP code: 101890-0. Laboratory accreditation certificates are provided in

Appendix A.

4.0 RESULTS

This section describes suspect materials that were found to be asbestos containing (Regulated ACM) or proven to be free of asbestos minerals (ACM-Free). [Refer to the bulk sample analysis report in

Appendix B for specific sample composition and the site drawing in Appendix C for sampling locations].

4.1 MATERIAL CONTAINING 1% OR MORE ASBESTOS

ACMs are materials proven to contain at least 1% asbestos or greater. AHERA and NESHAP regulations distinguish between friable and non-friable forms of ACM. A friable material is defined as one that can be “crumbled, pulverized, or reduced to powder by hand pressure when dry.”

Friability is an indication of a material’s ability to release asbestos fibers into the air. Regulated

ACMs are defined by NESHAP as all friable ACM and non-friable ACM that may be disturbed by renovation or demolition.

All samples suspect building materials included for asbestos content testing for this project were proven to be ACM-Free. Refer to Section 4.4 for a list of materials tested.

4.2 MATERIALS ASSUMED TO CONTAIN ASBESTOS

No suspect materials were assumed to contain asbestos during this survey activity.

FA4620-18-Q-A025

October 3, 2017 PAGE 4 Mountain Consulting Services, LLC

4.3 MATERIALS WITH ASBESTOS CONCENTRATIONS OF LESS THAN <1%

No analyzed materials were proven to contain less than 1 percent (<1%) asbestos during this survey activity.

4.4 NON-ACM MATERIALS

Microscopic examination of samples collected from the following suspect building materials in support of the CCTV System project for Building 1256, did not detect the presence of asbestos minerals (ACM-Free):

White / Light Gray Acoustic Ceiling Tiles Throughout Building (samples 1 & 2)

Gypsum Wallboard Paneling (sheetrock in Room 141 & 130B) (samples 3 & 4)

Joint & Taping Compound (associated with tested S/R) (sub-samples 4A)

Gypsum Wallboard Paneling (sheetrock in Room 136 & 137) (samples 5 & 6)

Joint & Taping Compound (associated with tested S/R) (sub-samples 5A & 6A)

Gypsum Wallboard Paneling (sheetrock in Room 142E) (samples 7 & 8)

Gypsum Wallboard Paneling (sheetrock in Rooms 138 & 139) (samples 9 & 10)

5.0 CONCLUSIONS AND RECOMMENDATIONS

Our findings are based strictly on information obtained from our site observations and from sample analysis during survey activities. Consistent with our knowledge and understanding of environmental regulations, particularly as they apply to the potential liabilities associated with asbestos-containing building materials, we present the following conclusions and recommendations.

5.1 CONCLUSIONS

The tested and analyzed building materials proven to be free of asbestos require no further action in regards to asbestos regulations. These materials may be impacted without any specialized personnel training and disposed of in a landfill that accepts standard construction debris.

5.2 RECOMMENDATIONS

If any materials not identified in this survey are uncovered during renovation or demolition, they must be assumed to contain asbestos until sampling and analysis prove otherwise. ACM must be handled in accordance with OSHA, NESHAP, and local regulations.

The Spokane Regional Clean Air Agency (SRCAA), the local building department and the local fire department should be contacted regarding possible permit requirements.

FA4620-18-Q-A025

October 3, 2017 PAGE 5 Mountain Consulting Services, LLC

6.0 LIMITING CONDITIONS AND CLOSURE

6.1 LIMITING CONDITIONS

We have exercised reasonable efforts to accomplish the tasks for this project using current professional standards of the industry. To the extent that the services require subjective judgment, there can be no assurance that definitive or desired results have been obtained or that they will be usable. Although based on scientific principles, to the extent that results depend on subjective judgment, they are subject to human error.

The suspect building materials to be impacted during the scheduled renovation project were identified by the 92nd CML Engineering Squadron representative. Only the specific materials / building areas identified in this report are covered by the conclusions presented.

6.2 CLOSURE

The results, conclusions, and recommendations in this report were prepared following our inspection of suspected ACM at the subject property. Methods used by Mountain Consulting for this study are consistent with the standard of care and professionalism normally exercised by consultants in environmental science and engineering. The Client acknowledges that Mountain Consulting has been retained for the sole purpose of assisting the Client to identify ACM, if any, associated with the subject structure.

It is agreed that Mountain Consulting has assumed responsibility only for performing this inspection, limited to the identified areas and presenting this report and conclusions to the Client.

The Client acknowledges that Mountain Consulting is not acting as an “agent” for the Client, or any other user or entity, for work associated with any asbestos-containing materials.

This report was prepared for the exclusive use of the 92nd CML Engineering Squadron of Fairchild

Air Force Base, Washington and/or representatives thereof. It may only be reproduced in full and with written approval of Mountain Consulting and is not warranted if any portion of it is separated from the original complete document.

FA4620-18-Q-A025

October 3, 2017 PAGE 6 Mountain Consulting Services, LLC

STATEMENT OF PROFESSIONALISM

Mountain Consulting Services, hereby certifies that the limited asbestos containing building materials survey conducted for the suspect interior building materials present throughout the Bud

Day Center in Building 1256 located on Fairchild AFB, Washington, was conducted under modified protocols of 40 CFR 763.85. All policies and procedures described in 40 CFR 763 have been followed. All work and statements contained herein are certified true and correct to the best of

Mountain Consulting’s ability.

Inspector: __________________________________ Date: October 3, 2017

Ryan Yocom

AHERA Building Inspector

Certification: BIR-20170915-06

Expiration: September 15, 2018

APPENDIX A

CERTIFICATION AND ACCREDITATION

FA4620-18-Q-A025

Certificate of Completion Ryan Yocom has successfully completed

4-Hr AHERA Certified Building Inspector Refresher Training

In compliance with TSCA Title II AHERA 40 CFR Part 763 as approved by the State of Missouri

Kyron Environmental Accreditation #MO-129 Date of Training: September 15, 2017 in Spokane, WA

Certificate # BIR20170915-06

Tim Brady, Instructor Expires: 09/15/2018

FA4620-18-Q-A025

APPENDIX B

BULK ASBESTOS MATERIALS

ANALYSIS REPORT

FA4620-18-Q-A025

9922 East Montgomery Suite 13 NVLAP LAB CODE 101890-0

(509) 922-1365 ● Fax (509) 922-1380

Polarized Light Microscopy, NVLAP Accreditation

September 26, 2017

Mountain Consulting Services, LLC Project: FAFB Bldg. 1256 (Bud Day Center)

Ryan Yocom Project #: 17-024.4

9922 E. Montgomery Drive, Suite 9

Dear Mr. Yocom, The enclosed report details results for the analysis of the bulk sample(s) submitted to Mountain

Laboratories on September 14, 2017. Sample analysis was performed to determine asbestos type and content using Polarized Light Microscopy, supplemented by Dispersion Staining (PLM/DS).

This report includes a summary of the analytical results and chain of custody. Analytical results are only reflective of the samples, which were tested and presented in this report. Mountain Laboratories limits warranty to proper analysis methods and takes no responsibility for sample procurement.

It has been our pleasure providing you with these analytical services. If you have any questions regarding this report, please do not hesitate to call us at (509) 922-1365.

Sincerely, Heidi L. McCarthy

Laboratory Manager

Mountain Laboratories

Mountain Laboratories NW, Inc.

Enclosure: 1023.37499.37508H

MOUNTAIN LABORATORIES

BULK SAMPLE ANALYSIS FOR ASBESTOS

Test Method: EPA-600/R-93/116: Interim Method for the Determination of Asbestos in Bulk Building Materials. Customer #: 1023

Laboratory No. B17-37499 B17-37500 B17-37501

Sample ID No. 17-024.4-01 17-024.4-02 17-024.4-03

Sample Description Acoustic Tile Acoustic Tile Drywall Composite

Sample Treatment Teased/Crushed

Heated

Teased/Crushed

Heated Teased/Crushed

Homogeneous No No No

Layered Yes Yes Yes

Fibrous Yes Yes Yes

Sample Color White/Light Gray White/Light Gray Brown/Off White

Asbestos Present No No No

Asbestos Type and

Percentage

1. Chrysotile

2. Amosite

3. Crocidolite

4. Other

N.D. N.D. Drywall: N.D.

Total % Asbestos None None None

Other Fibrous Material

In Sample

Cellulose 44%

Mineral Wool 25%

Cellulose 44%

Mineral Wool 25%

Cellulose 5%

Glass Fibers <1%

Non-Fibrous Material:

Perlite 10%

Binder/Filler 20%

Other <1%

Perlite 10%

Binder/Filler 20%

Other <1%

Binder/Filler 5%

Gypsum 88%

Paint <1%

Other 100% Date Analyzed: September 26, 2017 Analyzed By: Heidi L. McCarthy

Mountain Laboratories, Mountain Laboratories NW, Inc. limits warranty to proper analysis methods only and takes no responsibility for sample procurement. Mountain Laboratories, Mountain

Laboratories NW, Inc., 9922 E. Montgomery Suite #13, Spokane Washington 99206 (509) 922-1365 - Fax (509) 922-1380. PLM has been known to miss asbestos in a small percentage of samples. Thus negative or <1% PLM results should be tested with either SEM or TEM. Customer is responsible for sample separation. This report may only be reproduced in full with written approval by Mountain Laboratories. Soil/Dust samples are not covered under NVLAP Accreditation.

Sample results must not be used by the customer to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government.

Test Method: EPA-600/R-93/116: Interim Method for the Determination of Asbestos in Bulk Building Materials. Customer #: 1023

Laboratory No. B17-37502 B17-39057 B17-37503

Sample ID No. 17-024.4-04 17-024.4-04-A 17-024.4-05

Sample Description Drywall Composite

Sub-sample of

17-024.4-04

Top Layer

Drywall Composite

Sample Treatment Teased/Crushed Teased/Crushed

Heated Teased/Crushed

Homogeneous No No No

Layered Yes Yes Yes

Fibrous Yes No Yes

Sample Color Brown/Off White White/Off White Brown/Off White

Asbestos Present No No No

Asbestos Type and

Percentage

1. Chrysotile

2. Amosite

3. Crocidolite

4. Other

Drywall: N.D. Top Layer: N.D. Drywall: N.D.

Total % Asbestos None None None

Other Fibrous Material

In Sample

Cellulose 5%

Glass Fibers <1%

Cellulose 5%

Glass Fibers <1%

Non-Fibrous Material:

Binder/Filler 5%

Gypsum 88%

Paint <1%

Other 100%

Gypsum 99%

Paint <1%

Other 100%

Binder/Filler 5%

Gypsum 88%

Paint <1%

Mountain Laboratories, Mountain Laboratories NW, Inc. limits warranty to proper analysis methods only and takes no responsibility for sample procurement. Mountain Laboratories, Mountain

Laboratories NW, Inc., 9922 E. Montgomery Suite #13, Spokane Washington 99206 (509) 922-1365 - Fax (509) 922-1380. PLM has been known to miss asbestos in a small percentage of samples. Thus negative or <1% PLM results should be tested with either SEM or TEM. Customer is responsible for sample separation. This report may only be reproduced in full with written

Sample results must not be used by the customer to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government.

Test Method: EPA-600/R-93/116: Interim Method for the Determination of Asbestos in Bulk Building Materials. Customer #: 1023

Laboratory No. B17-39058 B17-37504 B17-39059

Sample ID No. 17-024.4-05-A 17-024.4-06 17-024.4-06-A

Sample Description

Sub-sample of

17-024.4-05

Top 2 Layers

Paper Layer

Drywall Composite

Sub-sample of

17-024.4-06

Paper Layer

Off White Layer

Sample Treatment Teased/Crushed

Heated Teased/Crushed

Teased/Crushed

Heated

Homogeneous No No No

Layered Yes Yes Yes

Fibrous Yes Yes Yes

Sample Color White/Off White Tan/Off White White/Off White

Asbestos Present No No No

Asbestos Type and

Percentage

1. Chrysotile

2. Amosite

3. Crocidolite

4. Other

Top 2 Layers: N.D.

Paper Layer: N.D.

N.D. Paper Layer: N.D.

Off White Layer: N.D.

Total % Asbestos None None None

Other Fibrous Material

In Sample

Paper Layer:

Cellulose 98%

Cellulose 5% Paper Layer:

Cellulose 98%

Non-Fibrous Material:

Paper Layer:

Binder/Filler 2%

Top 2 Layers:

Gypsum 99%

Paint <1%

Other 100%

Binder/Filler 5%

Gypsum 90%

Paper Layer:

Binder/Filler 2%

Off White Layer:

Gypsum 99%

Paint <1%

Mountain Laboratories, Mountain Laboratories NW, Inc. limits warranty to proper analysis methods only and takes no responsibility for sample procurement. Mountain Laboratories, Mountain

Laboratories NW, Inc., 9922 E. Montgomery Suite #13, Spokane Washington 99206 (509) 922-1365 - Fax (509) 922-1380. PLM has been known to miss asbestos in a small percentage of samples. Thus negative or <1% PLM results should be tested with either SEM or TEM. Customer is responsible for sample separation. This report may only be reproduced in full with written

Sample results must not be used by the customer to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government.

Test Method: EPA-600/R-93/116: Interim Method for the Determination of Asbestos in Bulk Building Materials. Customer #: 1023

Laboratory No. B17-37505 B17-37506 B17-37507

Sample ID No. 17-024.4-07 17-024.4-08 17-024.4-09

Sample Description Drywall Drywall Drywall Composite

Sample Treatment Teased/Crushed Teased/Crushed Teased/Crushed

Heated

Homogeneous No No No

Layered Yes Yes Yes

Fibrous Yes Yes Yes

Sample Color Tan/Off White Tan/Off White Tan/Off White

Asbestos Present No No No

Asbestos Type and

Percentage

1. Chrysotile

2. Amosite

3. Crocidolite

4. Other

N.D. N.D. Drywall: N.D.

Total % Asbestos None None None

Other Fibrous Material

In Sample

Cellulose 5% Cellulose 5%

Glass Fibers <1%

Cellulose 5%

Glass Fibers <1%

Non-Fibrous Material:

Binder/Filler 5%

Gypsum 90%

Binder/Filler 5%

Gypsum 89%

Binder/Filler 5%

Gypsum 88%

Paint <1%

Other 100%

Drywall only in sample.

Mountain Laboratories, Mountain Laboratories NW, Inc. limits warranty to proper analysis methods only and takes no responsibility for sample procurement. Mountain Laboratories, Mountain

Laboratories NW, Inc., 9922 E. Montgomery Suite #13, Spokane Washington 99206 (509) 922-1365 - Fax (509) 922-1380. PLM has been known to miss asbestos in a small percentage of samples. Thus negative or <1% PLM results should be tested with either SEM or TEM. Customer is responsible for sample separation. This report may only be reproduced in full with written

Sample results must not be used by the customer to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government.

Test Method: EPA-600/R-93/116: Interim Method for the Determination of Asbestos in Bulk Building Materials. Customer #: 1023

Laboratory No. B17-37508

Sample ID No. 17-024.4-10

Sample Description Drywall Composite

Sample Treatment Teased/Crushed

Heated

Homogeneous No

Layered Yes

Fibrous Yes

Sample Color Tan/Off White

Asbestos Present No

Asbestos Type and

Percentage

1. Chrysotile

2. Amosite

3. Crocidolite

4. Other

Drywall: N.D.

Total % Asbestos None

Other Fibrous Material

In Sample

Cellulose 5%

Glass Fibers <1%

Non-Fibrous Material:

Binder/Filler 5%

Gypsum 88%

Paint <1%

Other 100%

Drywall only in sample.

Mountain Laboratories, Mountain Laboratories NW, Inc. limits warranty to proper analysis methods only and takes no responsibility for sample procurement. Mountain Laboratories, Mountain

Laboratories NW, Inc., 9922 E. Montgomery Suite #13, Spokane Washington 99206 (509) 922-1365 - Fax (509) 922-1380. PLM has been known to miss asbestos in a small percentage of samples. Thus negative or <1% PLM results should be tested with either SEM or TEM. Customer is responsible for sample separation. This report may only be reproduced in full with written

Sample results must not be used by the customer to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government.

APPENDIX C

SAMPLE LOCATIONS DRAWING

& SITE PHOTOGRAPHS

GYPSUM BOARD WALL SYSTEM, INCLUDING

JOINT COMPOUND, PROVEN ACM-FREE BY

LABORATORY ANALYSIS.

2' X 4' WORMHOLE-PATTERNED ACOUSTIC

CEILING TILES PROVEN ACM-FREE BY

LABORATORY ANALYSIS.

17-024.4 FAFB 1256 L-ACM Rpt
Ryan Yocom_AHERA BIR 2017 Cert
Mountain Lab NVLAP
17-024.4 FAFB 1256 L-ACM Rpt
37499 37508H
17-024.4 FAFB 1256 L-ACM Rpt
Survey Drawing Template.dwg 1-Model