DRAFT_AF 66.pdf
PDF 108 KB Posted
- Attached to
- Modular Office
- Solicitation number
- FA4613ModularOffice
About this file
This document appears to be an AF Form 66, which is a Schedule of Material Submittals for a federal construction contract. It outlines the various items and documents that the contractor must submit for approval, including a construction work schedule, prefabricated building design, utility relocation plan, locksets/door hardware, fire suppression certification, warranties, O&M manuals, and as-built drawings. The required submission dates range from 7 to 30 days after contract award. The document also indicates that this is related to a pre-solicitation for a "Modular Office" requirement, where the government is conducting market research and requesting information from potential offerors. The key details include the solicitation number, contracting agency (Global Strike Command), and questions for respondents regarding their capabilities, intent to bid, small business status, and CAGE code.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DRAFT_Purchase Description.pdf | ||
| DRAFT_Floor Plan.pdf | ||
| DRAFT_Design Example.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NUMBER OF COPIES REQUIRED
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C
M P
LI
A
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
LE
S
C O
LO
R
S E
LE
C
T
IO
N
M A
N U
F A
C T
U R
E R
'S
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
'S
W A
R R
A N
T Y
C A
T A
LO
G
D A
T A
O P
E R
A T
IN
G
IN
S
T R
U C
T
IO
N S
T E
S T
S
R E
P O
R T
S
R E
Q U
IR
D
U
B M
IS
S
IO
N
D A
T E
D A
T E
R E
C E
IV
E
D I
N
C
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
N
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
D
A T
E
F O
L L
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N T
R A
C T
S
U B
M
IT
T A
L
F
IN
A L
A P
P R
O V
A L
REMARKS
1 Construction Work Schedule 1 Prior to start of work
2 Prefabricated building design 1 1 1 1 1 30 days after award
3 Utility relocation plan 1 10 days after award
4 Locksets/Door Hardware 1 10 days after award
5 Emergency exit hardward 1 10 days after award
6 Fire Suppression Certification/ Test Results 1 7 days after final
7 Workmanship Warranty 1 7 days after final
8 Equipment Warranties 1 1 7 days after final
9 O&M Manuals 1 1 1 1 7 days after final
10 Accident prevention plan 1 Prior to start of work
Certification of communications equipment test results
1 1 7 days after final
12 Construction Activity Hazard Analysis (AHA) Prior to start of work
13 HazMat Authorization Request Form Prior to start of work
14 Electrical Components & Materials 1 1 1 1 1 1 1 1 7 days after final
15 Electrical Upgrade Plan 1 1 1 10 days after award
16 Communications Equipment & Materials 1 1 1 1 1 1 7 days after final
In-Plant Office Materials - Carpet, Ceiling Tiles, etc.
1 1 1 1 1 1 1 7 days after final
18 As-Built Drawings 1 7 days after final
19 Construction Site Protection Plan Prior to start of work
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR TO BE COMPLETED BY PROJECT ENGINEER
BASE BID
APPROVED DIS-
File details come from the government source that posted it. Updated .