This document is a set of Questions and Answers related to a federal contract opportunity for Innerduct Conduit Space Recovery Phase II, Solicitation Number FA461324Q1023. The key details are:
The contract requires the removal of flexible innerduct and installation of outside plant (OSP) fabric mesh solution/innerduct in the communications conduit duct systems at F.E. Warren AFB in Wyoming. The contract will be awarded as a Firm Fixed-Price Commercial Item with a 50-business day period of performance. The solicitation is a small business set-aside with a NAICS code of 237130. Contractors must provide pricing for the removal of up to 20,000 linear feet of innerduct and installation of up to 20,000 linear feet of OSP fabric mesh solution/innerduct and detectable OSP fabric mesh solution/innerduct. Relevant past experience must be provided with the quote, which is due by April 3, 2024. The government will evaluate quotes for technical acceptability and award to the lowest priced, technically acceptable offeror.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Innerduct Phase 2 Questions and Answers
1.Please confirm we are pulling out and demolishing all rigid innerduct for the path provided in attachment 1a, maps.
Answer: Yes, and or smooth innerduct.
2.If there are multiple conduits with rigid innerduct, are we installing the 2 each 3x fabric mesh innerduct in all conduits or just 1 of them?
Answer: PWS 1.1.3 The OSP fabric mesh solution/innerduct shall be three (3) inch three (3)-cell OSP fabric mesh solution/innerduct.
3. Please provide MH butterfly drawings for the vaults listed in attachment 1a.
Answer: Butterfly drawings are complete and will be attached.
4. Are we to provide pricing based off the prints or actual footage?
Answer: Pricing should be based off the dimensions known
5. Can the water be pumped out on the ground? If not, where can the water be disposed at?
Answer: On the ground is Ok.
6. Will MH tripods be required to have on-site?
Answer: Per your company safety policy.
7. Please confirm there are no permit entry confined spaces.
Answer: Safety checks per your company policy and no permit is required.
8. Will the contractor be responsible for sealing the conduit after the new maxcell innerduct is installed?
Answer: The PWS does not state sealing of conduits.
9. Attachment 1 - 1.1.1: Please provide the number and size of innerducts to be removed from each duct run. Required to determine amount of effort and time.
(This is an estimate only what’s on record and not to be used for pricing)
Sketch 1 4 one inch innerduct
Sketch 2 4 one inch innerduct
Sketch 3 8 one inch innerduct.
Sketch 4 8 one inch innerduct
Sketch 5 2 one inch innerduct
FA461324Q1023
Attachment 6 - Questions and Answers
Sketch 6 4 one inch innerduct (mixed)
Sketch 7 4 one inch innerduct entering MH 85d and 8 one inch leaving the innerduct.
Sketch 8 4 one inch innerduct
Sketch 9 7 one inch innerduct from MH 50 and 4 one inch innerduct other areas.
10. Attachment 1 - 1.1.7.1 and 1.4: This is a no dig project so is an AF Form 103 still required?
Answer: AF Form 103 is not required.
11. Attachment 1 – 1.2 Schedule of work – Material delivery for fabric mesh may take up to 4- Weeks to deliver. How would this impact the scheduled 50-day POP.
Answer: If there is a potential delay due to material delivery, an extension mod can be issued after award.
12. Attachment 1A - Sketch 3: Missing a portion of drawing. MH-53 at a minimum is missing. Will the government please provide a complete drawing?
Answer: A new sketch 3 will be attached.
13. Instructions to Offerors 5.1.1.10 - will the government please clarify if they are expecting a multiple volume response to include the 5 page response volume, contractual provisions volume (to include 52.211-6, Brand Name or Equal and 52.212-2, Offeror Representations and Commercial Services ), a pricing volume, and a past experience volume? And if it is separate volumes submission, will the government provide specifics of what content they are expecting and evaluating in the 5 page volume?
Answer: The intent of 5.1.1.10 is simply to limit the page number of the proposal to a maximum of 5 pages, and that any company identifying information must be limited to either the cover page or the first page if the proposal does not include a cover page.
14. If it is not a multiple volume response, will the government confirm they are expecting price and past performance included within the 5 page volume? And will the government consider excluding the cover page in the 5 page limitation?
Answer: The maximum number of pages for the proposal may not exceed 5 pages
15. Will the government provide instructions on where to include the completed copy of the provisions 52.211-6, Brand Name or Equal and 52.212-3, Offeror Representations and Commercial Services?
Answer: Include them at the end of the proposal, or as attachments.
FA461324Q1023
Atta2chment 6 - Questions and Answers