| File | Type | Posted |
|---|---|---|
| Attachment 2 - Performance Work Statement.pdf | ||
| Attachment 7 - Question and Answers Updated 19 Apr 23.pdf | ||
| Attachment 2 - Performance Work Statement.pdf | ||
| Attachment 4 - Site Visit Agenda.pdf | ||
| Attachment 3 - Wage Determination.pdf | ||
| Attachment 1 - Solicitation FA461323Q0009.pdf | ||
| Attachment 6 - Offeror Quote Supplement Form.pdf | ||
| Attachment 2 - Performance Work Statement.pdf | ||
| Attachment 4 - Site Visit Agenda.pdf | ||
| Attachment 5 - FEW DVES Virtual Pass Procedures.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
Solicitation Number
#FA461323Q0009
Question
Question/Comment/Clarification Government Response
1) Are there any restrictions that will prevent the contractor from working a full and productive day (8am-5pm, MST) during the installation?
No, PWS 4.6.2
2)
Will the Government provide all necessary escorts required daily to complete the installation in a timely manner?
Note: A minimum of (2-3) escorts will be needed for (5-7) business days (or longer) contingent on each building’s accessibility.
The 90 CS Project Manager will arrange for escorts as required to gain access to the facilities.
3)
Please confirm that all the information in Appendix B is accurate. The data in this table will be used to finalize the BOM and installation costs.
Note: Any discrepancies could impact the time on site and installation costs.
Yes
4)
The PWS (Sec 1.1.1) installation requirements specify that the new LRE system will be installed parallel to the existing LRE system. If this is the desired approach, please confirm the Government will provide 110VAC power and an open NEMA power outlet at each building identified in Appendix B.
Yes, 120VAC is available
5)
If the installation of the new LRE equipment shall be installed parallel to the existing LRE system, please confirm that there is a minimum of one (1) open and available working copper pair at each building identified in Appendix B and terminates back to Bldg 65. Otherwise, will the contractor need to use one of the working pairs connected to the existing LRE (Campus-REX) system?
If one pair not available at location the reuse of current pairs in use is authorized.
6)
Normal Hours of Operation (Sec 4.6.2) Are there any buildings that will require “after hours” access to install or cutover new LRE equipment?
None identified at this time.
Solicitation FA461323Q0009 Attachment 7 - Question and Answers Govt Responses
If Yes, please confirm that the Government will provide the necessary escorts needed to complete this work?
If Yes, please identify the buildings in Appendix B and the proposed time for “after hours” install or cutover.
7)
Will the Government allow the contractor to work on weekend(s) during the installation should it be necessary?
If Yes, what start-stop times are available?
No PWS 4.6.2.
8)
BLDG 65
Confirm the Government will provide 110VAC power and a minimum of (2) open NEMA power outlets at the equipment rack where the ML2300 chassis will be installed.
Yes, 120VAC is available
9)
BLDG 65
Confirm the Government will provide a minimum of 6 Rack Units (RU) in the equipment rack where the ML2300 chassis will be installed.
Yes
10)
BLDG 65
What is the make and model of the network switch/router that the ML2300 connect to.
C2960X
11)
BLDG 65
Confirm that the network switch/router supports either copper or fiber SFP ports and how many open ports are available.
Clarification: We recommend connecting the Actelis ML2300 chassis to the Government switch/router using a fiber connection (SFP).
Please confirm that the Government switch/router can support fiber connections and has open fiber SFP/Uplink ports available.
Copper & you will be replacing existing switch to device cables on a one for one basis
12)
BLDG 65
Confirm there is an existing UPS system and plugs available for the new ML2300 power terminations.
Yes, 120VAC is available
13) Remote BLDGs : CPE
Confirm that contractor is not required test or repair any copper pairs that are not connected
Cross Base cable pair are the responsibility of 90 CS/SCOI Base Cable Shop to the existing Campus Rex/Campus Star LRE equipment.
14) Remote BLDGs : CPE
Is it possible to see a photo of a “typical” Campus-REX2 RS or REX3 setup?
No
15)
Remote BLDGs : CPE
Confirm the following rack and/or wall mounts are needed based on the data in Appendix B:
Rack Mount Kits: 13
Wall Mount Kits: 12
Rack mount: 15
Wall (Wood) mount: 12
16)
Remote BLDGs : CPE
Confirm that the existing 110VAC power and a NEMA power outlet(s) are in close proximity to where the new LRE ML624i will be installed (either on the wall or in an equipment rack).
Yes, 120VAC is available
17)
Salient Characteristics (Sec 1.1.5.1) Is the Government requesting (41) ML624i CPE devices?
Note: Appendix B lists (28) remote building locations.
Yes
18)
Project Residue (Sec 1.1.3) Confirm that the contractor is only required to dispose of the existing LRE equipment and bears no responsibility whatsoever for any Government information contained in these devices.
Does the Government have any recommendations on where the residue can be disposed as we have no information on Federal, State, Local, and base environmental laws and regulations?
Contractor is responsible for disposal of new project equipment waste material… NOT existing LRE Equipment. The Government will dispose of existing LRE Equipment
19)
Schedule of Work (Sec 1.1.8) The commencement of work can only be started after confirmation from the manufacturer on the availability and shipping schedules of all individual components that comprise the entire system.
Yes
20)
Schedule of Work (Sec 1.1.8) Based on the requirements of (Parallel Install, Sec 1.1.1), it is anticipated that the new LRE system will require more than 5 business days to complete the installation and acceptance testing.
PWS Sec. 1.1.1. has been changed to remove Parallel Install requirement.
21)
Quality Assurance (Sec 4.2.1) How will a “change of scope” be administered by the Government should an issue arise either prior to or during the installation of the new LRE equipment?
Any changes to the contract deemed necessary by the customer and the contracting officer will be completed in accordance with FAR 52.212-5 as a modification.
22)
Normal Hours of Operation (Sec 4.6.2) During the planning phase of the project, the Government will identify any locations that require installation and cutover after normal business hours to avoid unnecessary operational mission impact.
Note: Please provide any location(s) listed in Appendix B that will require installation and/or cutover as this will impact the overall system installation and testing costs.
As required