Attachment_1,_SOW_12Jan2017.pdf

PDF 274 KB Posted

Attached to
HVAC Duct Cleaning at 15 Missle Alert Facilities (MAFs)
Solicitation number
FA4613-17-T-0003
Issued by

About this file

Paragraph 3.7 was updated to include the period of performance in the Statement of Work.

View the file

Other files

File Type Posted
Questions_and_Answers_0001.pdf PDF
Attachment_1,_SOW.pdf PDF
FA4613-17-T-0003.pdf PDF
Attachment_3,_WD.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

AND TECHNICAL SPECIFICATONS

FOR

Clean HVAC Ducts at 15 Missile Alert Facilities

Project: GHLN 16-DUCTS

AT

F.E. Warren AFB

12 January 2017

1. Synopsis

The Contractor shall be responsible for furnishing all labor, materials, equipment and services necessary in cleaning the HVAC ducting at 15 Missile Alert Facilities (MAFs) located in Wyoming, Nebraska and

Colorado. The work includes cleaning HVAC ducts at fifteen MAFs along with incidental related work.

The MAFs are secure sites and are to remain operational during the commencement of the work.

2. Location

The work shall be at the MAF A-01 thru O-01 located near FE Warren AFB as indicated in the table below.

3. General Requirements

3.1. On a daily basis or more often as necessary, the Contractor shall clean all work areas of debris as well as the Contractor’s tools, equipment, and materials. This includes the exterior/interior of adjacent buildings and parking lot/access road.

3.2. The Contractor is responsible for verification of all quantities, dimensions, and site conditions.

3.3. Any change in conditions or modifications with this project must be presented to the CO prior to any change. After the change is agreed on, a FIELD CHANGE REPORT will be completed by the CO and processed through the Contracting Office. The FIELD CHANGE REPORT will reflect whether the change or modification will be a no cost modification or a cost modification.

The FIELD CHANGE REPORT will also have all agreeing parties' signatures.

3.4. The Contractor will keep a copy of the most current Statement of Work and Drawings on the jobsite. The working hours will be between the hours of 7:30 a.m. (start processing on site) and

4:00 p.m. (terminated work off site) excluding Saturdays, Sundays, and Federal Holidays. An

Air Force Inspector/Escort will be provided during these work hours.

3.5. The Contractor shall submit a Material Safety Data Sheet (MSDS) for each compound or chemical intended to be utilized on the site to the Base Bioenvironmental Office (90

MDOS/SGOAB, 307-773-3088) for review and approval prior to delivery and use on the site. A hazardous material is defined in Federal Standard FED/STD-313C (Tables I and II). The definition of materials presenting a health hazard or physical hazard is found in 29 CFR

1910.1200(c). The MSDS shall be maintained on the site and all workers shall familiarize themselves with their contents. The Contractor shall be responsible for establishing a system which tracks the procurement, delivery to site, installation, and disposal of all hazardous materials including proper disposal documents. The Contractor shall submit a report prior to the commencement of construction on each delivery order (if necessary) to the 90 CES/CEV representative (307-773-4441).

3.6. The buildings will be occupied during performance of work under the contract. Before work is started, the Contractor shall arrange with the CO a sequence of procedure, means of access, space for storage of materials and equipment, and use of parking and driveway areas. See

Appendix A for Entry Authorization access to the MAFs and security requirements.

3.7. Work Schedule: The Contractor shall submit a work schedule to Missile Engineering for approval within 15 days after award of the contract. See Appendix B- Contract Data

Requirements List. The period of performance is 90 days.

3.8. Existing Work: In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

3.8.1. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

3.8.2. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

3.9. National Air Duct Cleaners Association (NADA): NADCA agency or NADCA team personnel without a current registration or current certification are not to perform HVAC cleaning work on this contract.

3.9.1. Team Members: NADCA team approved to accomplish work on this contract are full-time employees of the NADCA firm. No other personnel is allowed to do HVAC cleaning work on this contract.

3.9.2. Replacement of NADCA Team Members: Replacement of members may occur if each new member complies with the applicable personnel qualifications and each is approved by the

Contracting Officer.

4. HVAC System Cleaning

4.1. Scope of Work

This section defines the minimum requirements necessary to render HVAC components clean, and to verify the cleanliness through inspection and/or testing in accordance with items specified herein and applicable NADCA Standards. The Contractor shall conform all inspection work to NADCA HVAC

Inspection Manual.

The Contractor shall remove visible surface contaminants and deposits from within the HVAC system in strict accordance with these specifications.

The HVAC system includes any interior surface of the facility's air distribution system for conditioned spaces and/or occupied zones. This includes the entire heating, air-conditioning and ventilation system from the points where the air enters the system to the points where the air is discharged from the system.

The return air grilles, return air ducts (except ceiling plenums and mechanical room) to the air handling unit (AHU), the interior surfaces of the AHU, mixing box, coil compartment, condensate drain pans, humidifiers and dehumidifiers, supply air ducts, fans, fan housing, fan blades, air wash systems, spray eliminators, turning vanes, filters, filter housings, reheat coils, and supply diffusers are all considered part of the HVAC system. The HVAC system may also include other components such as dedicated exhaust and ventilation components and make-up.

4.2. HVAC System Inspections and Site Preparations

4.2.1. HVAC System Evaluation

Prior to the commencement of any cleaning work, the Contractor shall perform a visual inspection of the

HVAC system in the presence of the 90 CES inspector to determine appropriate methods, tools, and equipment required to satisfactorily complete this project.

The Contractor shall document damaged system components found during the inspection and submit to the CO 10 days after the inspection, clearly labeled "Record of Existing Conditions”. See Appendix B-

Contract Data Requirements List.

4.2.2. Site Evaluation and Preparations

Conduct a site evaluation, and establish a specific, coordination plan which details how each area of the building will be protected during the various phases of the project and submit the coordination plan to the

CO 15 days after award. See Appendix A, Contract Data Requirements List.

4.2.3. General HVAC System Cleaning Requirements

4.2.3.1. Containment: Collect debris removed during cleaning and take precautions to ensure that debris is not otherwise dispersed outside the HVAC system during the cleaning process.

4.2.3.2. Particulate Collection: Where the Particulate Collection Equipment (PCE) is exhausting inside the building, use HEPA filtration with 99.97 percent collection efficiency for 0.3-micron size (or greater). When the PCE is exhausting outside the building, undertake Mechanical Cleaning operations only with PCE, including adequate filtration to contain debris removed from the HVAC system. When the PCE is exhausting outside the building, take precautions to locate the equipment down wind and away from all air intakes and other points of entry into the building.

4.2.3.3. Controlling Odors: Take all reasonable measures to control offensive odors and/or mist vapors during the cleaning process.

4.2.3.4. Component Cleaning: Employ cleaning methods such that all HVAC system components are Visibly Clean as defined in applicable standards. Upon completion, return all components to those settings recorded just prior to cleaning operations.

4.2.3.5. Air-Volume Control Devices: Mark the position of dampers and any air-directional mechanical devices inside the HVAC system prior to cleaning and, upon completion, restore to their marked position.

4.2.3.6. Service Openings: Utilize service openings, as required for proper cleaning, at various points of the HVAC system for physical and mechanical entry, and inspection.

Utilize the existing service openings already installed in the HVAC system where possible. Create other openings where needed, created and resealed in conformance with NADCA Standard 05. Place closures so they do not significantly hinder, restrict, alter the air-flow within the system, or compromise the structural integrity of the system. Properly insulate closures to prevent heat loss/gain or condensation on surfaces within the system. Conform construction techniques used in the creation of openings to requirements of applicable building and fire codes, and applicable NFPA, SMACNA and NADCA Standards. Cutting service openings into flexible duct is not permitted. Disconnect flexible duct at the ends as needed for proper cleaning and inspection. Reseal rigid fiber glass ductboard duct systems in accordance with

NAIMA recommended practices; NAIMA AH112, NAIMA AH122, and NAIMA

AH127. Only closure techniques which comply with UL 181, UL 181A, or UL 181B are suitable for fiber glass duct system closures. Clearly mark all service openings, capable of being re-opened for future inspection or remediation, and report their location in project report documents.

4.2.3.7. Ceiling Sections (Tile): Carefully remove and reinstall ceiling sections to gain access to HVAC systems during the cleaning process. Replace any damaged ceiling sections caused by the removal at no cost to the Government.

4.2.3.8. Air Distribution Devices (Registers, Grilles and Diffusers): Clean all air distribution devices.

4.2.3.9. Air Handling Units, Terminal Units, Blowers and Exhaust Fans: Insure that supply, return, and exhaust fans and blowers are thoroughly cleaned. Areas to be cleaned include blowers, fan housings, plenums (except ceiling supply and return plenums), scrolls, blades, or vanes, shafts, baffles, dampers and drive assemblies. Remove all visible surface contamination deposits in accordance with NADCA Standards.

Clean all air handling unit (AHU) internal surfaces, components and condensate collectors and drains.

Assure that a suitable operative drainage system is in place prior to beginning wash down procedures.

Clean all coils and related components, including evaporator fins.

4.2.3.10. Duct Systems: Create service openings in the system as necessary in order to accommodate cleaning of otherwise inaccessible areas. In addition, mechanically clean all duct systems to remove all visible contaminants, such that the systems are capable of passing Cleaning Verification Testings NADCA Standards.

4.2.4. Health And Safety

4.2.4.1. Safety Standards: Comply with all applicable federal, state, and local requirements for protecting the safety of the contractors' employees, building occupants, and the environment. In particular, follow all applicable standards of the Occupational Safety and Health Administration (OSHA) when working in accordance with this specification, and EM 385-1-1.

4.2.4.2. Occupant Safety: Employ no processes or materials in such a manner that they will introduce additional hazards into occupied spaces.

4.2.5. Disposal of Debris: Dispose of all debris removed from the HVAC System in accordance with applicable federal, state and local requirements.

4.3. Mechanical Cleaning Methodology

4.3.1. Source Removal Cleaning Methods: Clean the HVAC system using Source Removal mechanical cleaning methods designed to extract contaminants from within the HVAC system and safely remove contaminants from the facility. Select Source Removal methods which will render the HVAC System Visibly Clean and capable of passing cleaning verification methods NADCA Standards and other specified standards and tests, in accordance with all general requirements. Use no cleaning method, or combination of methods, which could potentially damage components of the HVAC system or negatively alter the integrity of the system. Incorporate the use of vacuum collection devices that are operated continuously during cleaning for all methods used. Connect a vacuum device to the downstream end of the section being cleaned through a predetermined opening. Use a vacuum collection device of sufficient power to render all areas being cleaned under negative pressure, such that containment of debris and the protection of the indoor environment is assured. Equip all vacuum devices exhausting air inside the building, including hand-held vacuums and wet-vacuums, with HEPA filters (minimum efficiency).

Equip all vacuum devices exhausting air outside the facility with Particulate Collection including adequate filtration to contain Debris removed from the HVAC system, in a manner that will not allow contaminants to re-enter the facility. Release of debris outdoors which violates any outdoor environmental standards, codes or regulations is not allowed.

All methods require mechanical agitation devices to dislodge debris adhered to interior

HVAC system surfaces, such that debris may be safely conveyed to vacuum collection devices. Acceptable methods will include those which will not potentially damage the integrity of the ductwork, nor damage porous surface materials such as liners inside the ductwork or system components.

4.3.2. Methods of Cleaning Fibrous Glass Insulated Components: Thoroughly clean glass thermal or acoustical insulation elements present in any equipment or ductwork with HEPA vacuuming equipment, while the HVAC system is under constant negative pressure, and not permitted to get wet in accordance with applicable NADCA and NAIMA standards and recommendations. Do not use cleaning methods which cause damage to fibrous glass components or which will render the system capable of passing Cleaning Verification Tests

NADCA Standards).

4.3.3. Damaged Fibrous Glass Material: If there is any evidence of damage, deterioration, delamination, friable material, mold or fungus growth, or moisture such that fibrous glass materials cannot be restored by cleaning or resurfacing with an acceptable insulation repair coating, identify them for replacement. When requested or specified, be capable of remediating exposed damaged insulation in air handlers and/or ductwork requiring replacement.

4.3.4. Replacement Material: If replacement of fiber glass materials is required, conform all materials to applicable industry codes and standards, including those of UL and SMACNA

1966. Replacement of damaged insulation is not covered by this specification

4.3.5. Cleaning of Coils: Use any cleaning method which will render the Coil Visibly Clean and capable of passing Coil Cleaning Verification applicable NADCA Standards. Coil drain pans are subject to Non-Porous Surfaces Cleaning Verification. Maintain operability of the drain for the condensate at all times. Do not damage, displace, inhibit heat transfer, or cause erosion of the coil surface or fins, and conform to coil manufacturer recommendations when available. Thoroughly rinse coils with clean water to remove any latent residues.

4.3.6. Antimicrobial Agents and Coatings: Only apply antimicrobial agents if active fungal growth is reasonably suspected, or where unacceptable levels of fungal contamination have been verified through testing. Perform application of any antimicrobial agents used to control the growth of fungal or bacteriological contaminants after the removal of surface deposits and debris. Use only antimicrobial agents registered by the U.S. Environmental

Protection Agency (EPA 402-F-91-102) (EPA 402-C-01-001) specifically for use within

HVAC system. Apply antimicrobial agents in strict accordance with manufacturer's instructions. Use only antimicrobial coating products, for both porous and non-porous surfaces, which are EPA registered, water soluble solutions with supporting efficacy data and MSDS records. Apply antimicrobial coatings according to manufacturer's instructions.

Spray coatings directly onto interior ductwork surfaces, rather than "fog" downstream onto surfaces. Achieve a continuous film on the surface to be treated by the coating application, and apply in strict accordance with, manufacturer's minimum millage surface application rate standards for effectiveness.

4.4. Cleanliness Verification

4.4.1. General: Verification of HVAC System cleanliness will be determined after mechanical cleaning and before the application of any treatment or introduction of any treatment-related substance to the HVAC system, including antimicrobial agents and coatings.

4.4.2. Visual Inspection: Visually inspect the HVAC system to ensure that no visible contaminants are present. If no contaminants are evident through visual inspection, consider the HVAC system clean; however, further verification of the system cleanliness through gravimetric or wipe testing analysis testing may be requested at the discretion of the CO, as specified herein. If visible contaminants are evident through visual inspection, re-clean those portions of the system where contaminants are visible, and subject to re-inspection for cleanliness.

4.4.3. Gravimetric Analysis: At the expense of the Contractor, test sections of all four (4) zones of the HVAC system for cleanliness using the NADCA Vacuum Test (gravimetric analysis) as specified in applicable NADCA Standards. Levels of debris collected are to be equal to or less than acceptable levels defined in applicable NADCA Standards. If gravimetric analysis determines that levels of debris are equal to or lower than those levels specified, the system is considered clean and to have passed cleanliness verification. If gravimetric analysis determines that levels of debris exceed those specified in applicable NADCA standards, the system will not be considered clean, and re-cleaning of those sections of the system which failed cleanliness verification will be required at the expense of the HVAC system cleaning contractor. Perform cleanliness verification immediately after mechanical cleaning and before the HVAC system is restored to normal operation.

4.4.4. Verification of Coil Cleaning: Cleaning is to restore the coil pressure drop to within 10 percent of the pressure drop measured when the coil was first installed. If the original pressure drop is not known, the coil will be considered clean only if the coil is free of foreign matter and chemical residue, based on a thorough visual inspection (see NADCA

HVAC Inspection Manual Standards).

4.5. Post Project Report

At the conclusion of the project, provide a Testing Procedures Summary and Post-Project Report indicating the following (See Appendix A, Contract Data Requirements List).

Success of the cleaning project, as verified through visual inspection and/or gravimetric analysis.

Areas of the system found to be damaged and/or in need of repair air systems.

SD-06 Test Reports

The Contractor shall complete the Test Reports:

Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)

Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.

Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

o Investigation reports.

o Daily logs and checklists o Final acceptance test and operational test procedure

4.6. NADCA Standards

Perform the services specified here in accordance with the current published standards of the National Air

Duct Cleaners Association (ACR and NADCA HVAC Inspection Manual).

All terms in this specification have their meaning defined as stated in the NADCA Standards (See

Appendix C and Appendix D)

Follow NADCA Standards with no modifications or deviations.

4.7. Documents

Obtain one copy of the project drawings and specifications and submit a NADCA Work Execution

Schedule to the CE within 10 working days of the contract award (See Appendix A, Contract Data

Requirements List)

4.8. Equipment, Materials and Labor

Possess and furnish all necessary equipment, materials and labor to adequately perform the specified services and comply with the applicable provisions of NADCA General Specifications for the Cleaning of

Commercial HVAC Systems and ASHRAE 62.1.

4.8.1. Assure that all employees have received safety equipment training, medical surveillance programs, individual health protection measures, and manufacturer's product and Material

Safety Data Sheets (MSDS) as required for the work by the U.S. Occupational Safety and

Health Administration, and as described by this specification. For work performed in countries outside of the U.S.A., comply with applicable national safety codes and standards.

4.8.2. Maintain a copy of all current MSDS documentation and safety certifications at the site at all times, as well as comply with all other site documentation requirements of applicable

OSHA programs and this specification.

4.8.3. Submit all Material Safety Data Sheets (MSDS) for all chemical products proposed to be used in the cleaning process, including all VOC ratings.

4.8.4. Licensing: Comply with all Federal, state and local rules, regulations, and licensing requirements.

5. Appendix A- Occupancy of Premises/ Access

5.1. Security Requirements

5.1.1. Entry Authorization List (EAL)

Access to the Missile Alert Facilities (MAFs) is controlled by the U.S. Air Force. All contracted personnel entering the sites shall be on an Entry Authorization List (EAL) created by the Government.

The Contractor shall provide complete written, valid, and legible data that shall include legible photocopies or scanned electronic documents to be used to produce the initial EAL prior to their initial commencement of work at the site for this project.

Twenty (20) working days are required to process, initially issue, add to, correct, and renew EALs. Any delays caused by submission of incorrect, outdated, and invalid information will be at no cost to the

Government. Missile Engineering shall provide to the Contracting Officer and the Contractor the expiration date for each EAL, when the date is made effective. The Contractor submitted data shall include the following for each employee (to include prime, subcontractor and delivery/testing services employees):

A. Project GHLN number, contract number, name of project, and Contracting Officer.

B. Employers name and address (city and state).

C. One Form of ID as follows:

i. Legible photocopy or electronically scanned valid driver's license, state photo ID card, or official state/federal photo ID card with the individual's name.

ii. Able to produce, for verification, the exact form of ID given for the EAL process

D. Identification cards that expire during the construction period must be updated and photocopies or scanned copies must be sent to the Contracting Officer or his/her authorized representative 20 days prior to expiration or the person shall be dropped from the EAL. The

Contractor is responsible for maintaining an accurate valid list.

E. All of the following for each vehicle: make, model, year, color, license plate number and state.

5.1.2. Site Entry

In order to gain entry onto the project facility, the Contractor personnel must be:

A. Listed on an effective EAL.

B. Identified by escort personnel.

C. Able to produce, for verification, the exact form of ID given for the EAL process.

D. Submit to physical and electronic search of person and materials.

E. Physically escorted on-site by an authorized escort official and remain under escort full time while on site.

F. Upon arrival, the escort will identify all Contractor personnel and check identification.

Processing onto and off the sites may require approximately thirty (30) minutes each and shall not be considered delay time.

5.1.3. Vehicle Identification

5.1.3.1. Company Identification (logo) must be clearly, legibly, and identifiable at a minimum of 30-foot distance and displayed on each side of all vehicles and equipment brought onto or operated on site. Vehicles and equipment without such identification may be denied access to the site.

5.1.3.2. The access road leading from the main road adjacent to the site is under military control. The area off to the sides of the access road is either private property, federal, state, or county property. Parking vehicles on the access road is prohibited unless permission has been obtained from the government. Vehicles may be parked in the

Air Force access area but any such parked vehicles must be clear of the boundary fence by a minimum of twenty-five feet (25') and a minimum of fifty feet (50') from the centerline of the access road. Permission to use additional offsite parking and storage areas must be obtained in writing from the landowner and a copy must be submitted to the Contracting Officer prior to the Notice to Proceed for Site Work.

5.1.3.3. Authorized Contractor vehicles and equipment will be placed so as not to interfere with gates, emergency escape routes, antennas, any above ground structures, or the helicopter pad.

5.1.4. Access to facility

If existing access to the site is to be temporarily blocked, temporary access shall be properly provided by the Contractor. The Contractor shall notify the Contracting Officer twenty-one (21) calendar days prior to any interruption of access to the sites. Date, site(s) affected, length of time, and alternate entry method for

Site Interruption Plan shall be submitted in writing for approval in accordance with Section 01 33 00.

6. Appendix B- Contract Data Requirements List

Data Requirement SOW Reference Deadline

Work Schedule Para 3.7 15 days after contract award

Record of Existing Conditions Para 4.2.1 10 days after HVAC System

Inspections and Site Preparations

Coordination Plan Para 4.2.2 15 days after contract award

Post Project Report Para 4.5 10 days after performance is complete

Test Reports Para 4.5 10 days after performance is complete

7. Appendix C- Sources of General Reference Publications

7.1. General References

Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g. ASTM

B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.

7.2. Ordering Information

The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided. Documents listed in the specifications with numbers which were not assigned by the standards producing organization should be ordered from the source by title rather than by number.

American Society Of Heating, Refrigerating And Air-Conditioning Engineers (ASHRAE)

1791 Tullie Circle, NE

Atlanta, GA 30329

Ph: 800-527-4723 or 404-636-8400

Fax: 404-321-5478

E-mail: ashrae@ashrae.org

Internet: http://www.ashrae.org

National Air Duct Cleaners Association (NADCA)

1518 K Street, NW

Suite 503

Washington, DC 20005

Ph: (202) 737-2926

Fax: (202) 347-8847

E-mail: info@nadca.com

Internet: http://www.nadca.com

North American Insulation Manufacturers Association (NAIMA)

44 Canal Center Plaza, Suite 310

Alexandria, VA 22314

Ph: 703-684-0084

Fax: 703-684-0427

E-mail: online form

Internet: http://www.naima.org

SECTION 01 42 00 Page 2

Clean HVAC Ducts at 15 MAFs 16DUCTS

Sheet Metal And Air Conditioning Contractors' National Association (SMACNA)

4201 Lafayette Center Drive

Chantilly, VA 20151-1219

Ph: 703-803-2980

Fax: 703-803-3732

E-mail: info@smacna.org

Internet: http://www.smacna.org

Underwriters Laboratories (UL)

2600 N.W. Lake Road

Camas, WA 98607-8542

Ph: 877-854-3577

Fax: 360-817-6278

E-mail: CEC.us@us.ul.com

Internet: http://www.ul.com/

UL Directories available through IHS at http://www.ihs.com

U.S. Army Corps Of Engineers (USACE)

Order CRD-C DOCUMENTS from:

U.S. Army Engineer Waterways Experiment Station

ATTN: Technical Report Distribution Section, Services Branch, TIC

3909 Halls Ferry Road

Vicksburg, MS 39180-6199

E-mail: MTC-INFO@erdc.usace.army.mil

Internet: http://gsl.erdc.usace.army.mil/SL/MTC/handbook/handbook.htm

Order Other Documents from:

USACE Publications Depot

Attn: CEHEC-IM-PD

2803 52nd Avenue Hyattsville, MD 20781-1102

Ph: 301-394-0081

Fax: 301-394-0084

E-mail: pubs-army@usace.army.mil

Internet: http://www.usace.army.mil/publications or http://www.hnc.usace.army.mil/Missions/Engineering/TECHINFO.aspx

U.S. Environmental Protection Agency (EPA)

Ariel Rios Building

1200 Pennsylvania Avenue, N.W. Washington, DC 20004

Ph: 202-272-0167 for Fax and E-mail see below

Internet: http://www.epa.gov

--- Some EPA documents are available only from:

National Technical Information Service (NTIS)

5301 Shawnee Road

Alexandria, VA 22312

Ph: 703-605-6050 or 1-688-584-8332

Fax: 703-605-6900

E-mail: info@ntis.gov

Internet: http://www.ntis.gov

8. Appendix D- Sources of HVAC System Cleaning References and Definitions

8.1. HVAC Cleaning System References

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by them basic designation only.

American Society Of Heating, Refrigerating And Air-Conditioning Engineers (ASHRAE)

ASHRAE 62.1 (2010; Errata 2011; INT 3 2012; INT 4 2012; INT 5 2013) Ventilation for Acceptable

Indoor Air Quality

National Air Duct Cleaners Association (NADCA)

ACR (2013) Standard for Assessment, Cleaning, and Restoration of HVAC Systems

NADCA HVAC Inspection Manual (2005) Procedures for Assessing the Cleanliness of Commercial

HVAC Systems

North American Insulation Manufacturers Association (NAIMA)

NAIMA AH112 (1993) Cleaning Fibrous Glass or Lined Sheet Metal Ducts

NAIMA AH122 (2006) Cleaning Fibrous Insulated Duct Systems - Recommended Practices

NAIMA AH127 (1999) Impact of Duct Cleaning on Internal Duct Insulation

Sheet Metal And Air Conditioning Contractors' National Association (SMACNA)

SMACNA 1966 (2005) HVAC Duct Construction Standards Metal and Flexible, 3rd Edition

U.S. Army Corps Of Engineers (USACE)

EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010; Changes 4-6 2011; Change 7 2012) Safety and

Health Requirements Manual

U.S. Environmental Protection Agency (EPA)

EPA 402-C-01-001 (2001) IAQ Building Education and Assessment Tool (I-BEAM)

EPA 402-F-91-102 (1991) Building Air Quality: A Guide for Building Owners and Facility Managers

Underwriters Laboratories (UL)

UL 181 (2013) Factory-Made Air Ducts and Air Connectors

UL 181A (2013) Standard for Closure Systems for Use with Rigid Air Ducts and Air Connectors

UL 181B (2013) Standard for Closure Systems for Use with Flexible Air Ducts and Air Connectors

8.2. Definitions

8.2.1. NADCA Standards: Perform the services specified here in accordance with the current published standards of the National Air Duct Cleaners Association (ACR and NADCA

HVAC Inspection Manual).

8.2.1.1. All terms in this specification are defined as stated in the NADCA Standards

8.2.1.2. Follow NADCA Standards without modification or deviation.

File details come from the government source that posted it. Updated .