Attachment_2_REVISED_SPECS.pdf

PDF 226 KB Posted

Attached to
REPAIR WATER AND SEWER VALVES MMIII MAFs A01-O01
Solicitation number
FA4613-17-R-0006
Issued by

About this file

Attachment 2 REVISED SPECIFICATIONS

View the file

Other files

File Type Posted
Attachment_8_PPQ_Revised.pdf PDF
AMENDMENT_0001.pdf PDF
Questions.pdf PDF
Questions_Attachment.pdf PDF
Attachment_1_Bid_Schedule.pdf PDF
Attachment_7_CO_Wage_Logan_County.pdf PDF
Attachment_5_NE_Cheyenne_County.pdf PDF
Attachment_2_Specifications.pdf PDF
Attachment_8_PPQ.pdf PDF
Attachment_4_NE_Wage_Determination.pdf PDF
Attachment_6_CO_Wage_Weld_County.pdf PDF
Attachment_3_WY_Wage_Determination.pdf PDF
SF1442_MAR_2017.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Water/Sewer Valves GHLN146025

Submittal Procedures

Title:

Repair Water/Sewer Valves MMIII MAF’s A01-O01

Project #: GHLN 14-6025

Prepared By 90th Civil Engineering Squadron

Missile Engineering Flight FE Warren Air Force Base

Brad Kroetch Project Manager Date: 30 November 2016

REVISION 1

ATTACHMENT 2 - TECHNICAL SPECIFICATIONS - REVISED

SOLICITATION NUMBER FA4613-17-R-0006

General Requirements

PROJECT TABLE OF CONTENTS

DIVISION 01 – GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 33 00 SUBMITTAL PROCEDURES

01 57 19.05 32 ENVIONMENTAL PROTECTION

TECHNICAL PROVISIONS

WELDING

PLUMBING AND PIPING

ATTACHMENTS

Attachment 1 - Bid Schedule

SECTION 01 11 00

SUMMARY OF WORK

08/11

PART 1 GENERAL

1.1 SYNOPSIS

Contractor shall be responsible for furnishing all parts, materials, equipment, labor and transportation necessary to replace water emergency shut off valve (ESOV), sewer vent ESOV and associated components at MMIII Missile Alert Facilities (MAF) A01-O01 under the control of F. E. Warren Air Force Base, Wyoming. The round trip miles from base to each site are listed below.

SITE COUNTY STATE DISTANCE

(MILES)

A-01 Laramie WY 63 B-01 Banner NE 58 C-01 Banner NE 90 D-01 Kimball NE 70 E-01 Kimball NE 52 F-01 Kimball NE 84 G-01 Cheyenne NE 97 H-01 Cheyenne NE 123 I-01 Cheyenne NE 114 J-01 Logan CO 117 K-01 Kimball NE 80 L-01 Weld CO 86 M-01 Logan CO 122 N-01 Weld CO 94 O-01 Weld CO 66

This project consists of replacing ESOV 102, valve actuator, air pressure regulator, solenoid valves, compressed air plumbing and associated equipment.

Remove ESOV 103 and associated equipment. Modify sewer vent and install air admittance valve. The performance period for this project is 365 days.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work to be performed includes but is not limited to the following items:

a. Replace ESOV 102 with stainless steel Flowserve Series 44 ball valve, Part Number 1 4466 BTBW8 with 600 lb. stainless steel socket weld flanges.

b. Replace ESOV 102 valve actuator with Flowserve Series 39, Model 2039 actuator.

c. MAFs C-01, L-01 and N-01 ONLY: Replace water lines connecting ESV 102 and shock attenuator SA1 and hose H3 from shock attenuator to capsule. Water lines and fittings shall be schedule 80, type 316, stainless steel. Hose shall be 1” annular corrugated metal hose constructed of 316L stainless steel with 304 stainless steel braid reinforcement (Hosemaster Masterflex AF5550 or equivalent). Hose shall have an 80 psig working pressure or higher and be tested to 600 psig.

1. After welding, shock attenuator SA1 epoxy coating shall be removed by sand blasting. Sand shall be medium grade with maximum particles passing through on 18 mesh screen, U.S. Sieve Series. Blasting shall be in accordance with Steel Structures Painting Council Specification No. SSPS- SP-10 Near White Blast Cleaning and profile height shall be 2.5 mils maximum.

2. Reapply epoxy coating according to the manufactures instruction. The lining epoxy shall meet requirements set forth in the following specifications: ASTM D 4541, ASTM D 4060, ASTM B 117, and ASTM D 1308.

Compliance with these specifications shall be indicated on the Certification of Coating.

3. Replace shock attenuator gasket and reinstall existing burst disk.

Gaskets shall be made of non-asbestos material in accordance with ASME B16.21. Gaskets shall be flat, 1/16 inch thick, and contain Aramid fibers bonded with Styrene Butandien Rubber (SBR) or Nitro Butadiene Rubber (NBR). Gaskets shall be the full face or self-centering flat ring type.

d. Remove sewer vent ESOV 103 and cap line. Remove vent hose. Replace sewer vent line with 1-1/2” schedule 80 galvanized steel pipe. Install air admittance valve in vent line as specified in project drawings.

e. Replace pneumatic solenoid valve for ESOV 102 and ESOV 104 with Automatic Valve model number P0603GAWR-AA. Remove pneumatic solenoid valve for ESOV 103 and associated air lines.

f. Replace air pressure regulating valve PCV110 with Scott, Model Q1-202D-590 air pressure regulator. Install additional pressure gauges (one for bottle pressure and one for regulated pressure). Provide “tee” fitting, attach ¼” PTFE hose, route hose through existing inspection hole in floor and attach gauges to side of enclosure (approximately 4’ from floor) with “L” shaped stainless steel bracket.

g. Remove and replace air bottle. (Removed bottle will be returned to the government and the government will provide a replacement bottle.)

h. Replace pneumatic lines from LCC air cylinder to the air pressure regulator, solenoid valves and actuators for ESOV 102 and 104. Hose shall be ¼” PTFE with

304 stainless steel wire braid reinforcement and stainless steel fittings.

Install Pneumadyne air manifold, part number M30-250-3. The air hose shall have a 100 psi working pressure or higher. Hose shall be secured with cushion clamps spaced no greater than 24” apart.

i. Extend the existing fold down platform on the right side of the LCC wall 10” to improve access to ESOV 102 as shown of project drawings. Replace support chain to accommodate larger platform.

All pipe welding shall be completed off site to the maximum extent possible.

Temporary water must be supplied to the capsule when work prevents water from being supplied for more than four (4) hours. The water supply connection will be in the tunnel junction.

1.2.2 General Requirements

The following are general requirements for this contract:

a. Accomplish all work in accordance with the Contract Specifications and Drawings, design drawings and written recommendations, and all applicable building codes, standards and practices in the industry.

b. On a daily basis or more often as necessary, clean all work areas of debris as well as Contractor tools, equipment, and materials. This includes the exterior/interior of adjacent buildings and parking lot/access road.

c. The Contractor is responsible for verification of all quantities, dimensions, and site conditions.

d. Any change in conditions or modifications with this project must be presented to the Contracting Officers Representative (COR) prior to any change. After the change is agreed on, a FIELD CHANGE REPORT will be completed by the COR and processed through the Contracting Office. The FIELD CHANGE REPORT will reflect whether the change or modification will be a no cost Mod or a cost Mod. The FIELD CHANGE REPORT will also have all agreeing parties' signatures.

e. Prior to starting any work, all items listed on the attached Submittal

Register (see section 01 33 00) shall be submitted on individual AF Form 3000. This includes Material Safety Data Sheets (MSDS) for all materials used on the project.

f. The Contractor will keep a copy of the most current Statement of Work and Drawings on jobsite.

g. Working hours will be between the hours of 7:30 a.m. (start processing on site) and 4:00 p.m. (terminated work off site) excluding Saturdays, Sundays, and Federal Holidays. An Air Force Inspector/Escort will be provided during these work hours.

1.3 OCCUPANCY OF PREMISES / ACCESS

Buildings will be occupied during performance of work under this Contract. Before work is started, the Contractor shall arrange with the COR a sequence of procedures, means of access, space for storage of materials and equipment, and use of parking and driveway areas.

1.3.1 Security Requirements

1.3.1.1Entry Authorization List (EAL)

Access to the Missile Alert Facilities (MAFs) is controlled by the U.S. Air Force. All contracted personnel entering the sites shall be on an Entry Authorization List (EAL) created by the Government. Contractor shall provide complete written, valid, and legible data that shall include legible photocopies or scanned electronic documents to be used to produce the initial EAL prior to their initial commencement of work at the site for this project. Twenty (20) working days are required to process, initially issue, add to, correct, and renew EALs. Any delays caused by submission of incorrect, outdated, and invalid information will be at no cost to the Government. Missile Engineering shall provide to the Contracting Officer and the Contractor the expiration date for each EAL, when the date is made effective. Contractor submitted data shall include the following for each employee (to include prime, subcontractor and delivery/testing services employees):

a. Project GHLN number, contract number, name of project, and Contracting Officer.

b. Employers name and address (city and state).

c. One form of ID as follows:

1) Legible photocopy or electronically scanned Valid Driver's license, State photo ID card, or official state/federal photo ID card with the individual's name. (Any form of ID presented shall comply with “REAL ID Act”.)

2) Able to produce, for verification, the exact form of ID given for the EAL process.

d. Identification cards that expire during the construction period must be updated and photocopies or scanned copies must be sent to the Contracting Officer or his/her authorized representative 20 days prior to expiration or the person shall be dropped from the EAL. The Contractor is responsible for maintaining an accurate valid list.

e. All of the following for each vehicle: make, model, year, color, license plate number and state.

1.3.1.2 Site Entry

In order to gain entry onto the project facility, the Contractor personnel must be:

a. Listed on an effective EAL.

b. Identified by escort personnel.

c. Able to produce, for verification, the exact form of ID given for the EAL process.

d. Submit to physical and electronic search of person and materials.

e. Physically escorted on-site by an authorized escort official and remain under escort full time while on site.

f. Upon arrival, the escort will identify all Contractor personnel and check identifications. Processing onto and off the sites may require approximately thirty (30) minutes each and shall not be considered delay time.

1.3.1.3 Vehicle Identification

a. Company Identification (logo) must be clearly, legibly, and identifiable at a minimum of 30-foot distance and displayed on each side of all vehicles and equipment brought onto or operated on site. Vehicles and equipment without such identification may be denied access to the site.

b. The access road leading from the main road adjacent to the site is under military control. The area off to the sides of the access road is either private property, federal, state, or county property. Parking vehicles on the access road is prohibited unless permission has been obtained from the government. Vehicles may be parked in the Air Force access area but any such parked vehicles must be clear of the boundary fence by a minimum of twenty-five feet (25') and a minimum of fifty feet (50') from the centerline of the access road. Permission to use additional offsite parking and storage areas must be obtained in writing from the landowner and a copy must be submitted to the Contracting Officer prior to the Notice to Proceed (NTP) for Site Work.

c. Authorized Contractor vehicles and equipment will be placed so as not to interfere with gates, emergency escape routes, antennas, any above ground structures, or the helicopter pad.

1.3.2 Access to facility

If existing access to the site is to be temporarily blocked, temporary access shall be properly provided by the Contractor. The Contractor shall notify the COR twenty-one (21) calendar days prior to any interruption of access to the sites.

Date, site(s) affected, length of time, and alternate entry method for Site Interruption Plan shall be submitted in writing for approval in accordance with Section 01 33 00.

1.4 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements" the contractor shall:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the COR. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

1.5 WARRANTY

Thirty (30) days prior to final acceptance of each task order, obtain and submit written warranties for all equipment, products, goods and services supplied under this contract. Furnish with each warranty the name, address, and telephone number of the guarantor's representative, who will honor the guarantee during the written guarantee period and will provide the service prescribed by the terms of the guarantee. The equipment installed under this contract shall be guaranteed against defective materials, installation and workmanship for a period of not less than 12 months from the date of acceptance, either for the beneficial use or final acceptance, whichever is the earliest, but not before the system has passed all specified tests and been deemed acceptable for operation.

1.6 CONSTRUCTION SCHEDULE

Contractor shall submit Construction Schedule (AF Form 3064) to Missile Engineering within 15 days after award of the Contract. The COR shall schedule the work at each of the sites. Wing operational requirements, both real world and exercise take precedence over the scheduling of this work. The Contractor shall not be allowed to perform work at more than one site at a time. Progress Reports (AF Form 3065) shall be submitted periodically as required.

1.7 AS-BUILT DRAWINGS

Contractor shall submit post-construction (redlined), As-built Drawings to Missile Engineering 30 days prior to project close out. As-built Drawings shall be submitted for information for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents. As-built Drawings indicating inappropriate or unacceptable work may be subject to action by Missile Engineering.

As-built Drawings shall be submitted to the Contracting Officer (CO) in hardcopy and digital format for verification of completed work and final project closeout.

As-built Drawings shall be drafted or redlined full-size drawings prepared by the Contractor utilizing Auto CAD, Autodesk Design Review or similar electronic drafting software. When electronic drafting software is not available or feasible, the Contractor shall hand prepare quality redline drawings and electronic scans.

1.8 SAFETY

The Contractor will comply with the most recent Occupational Safety and Health

Administration (OSHA) regulations and Air Force Occupational Safety and Health (AFOSH) directives, AFOSH 127-66 and 161-1. OSHA Subpart 1926 and 1910 will be enforced.

The Contractor shall submit, within ten (10) working days prior to commencement of work, to the Contracting Officer, in writing, the name of the designated on-site person responsible for ensuring that all safety and accident prevention provisions of this specification, including Attachment 1, are implemented and enforced. The Contractor shall ensure that all Contractor personnel receive safety training and briefings and that all safety inspections, practices, and procedures are complied with.

The Contractor shall instruct each employee to ensure clear understanding of the following subject areas including, but not limited to:

a. The purpose of the accident prevention program (i.e., to minimize hazards and prevent injuries).

b. A review of the hazards inherent in the work environment and the precautions to be taken.

c. Location of first aid and other emergency facilities. (The Contractor shall maintain a complete first aid kit on site at all times).

d. A detailed description of what to do in case of injury, fire, or identification of a safety hazard.

e. Required safety equipment and its location on site. Safety equipment includes but is not limited to ear plugs, goggles, face shields, safety harness/lanyards, protective clothing, and hard-hats. All personnel will wear safety equipment when required by the Contractor, Contracting Officer, or Government inspector/escort.

f. Review of daily cleanup procedures.

g. Location of company safety rules (posted or handout).

h. Identification of the Contractor employees responsible for safety/accident prevention.

In addition to normal safety practices, the Contractor will comply with the following requirements:

a. The safety of Contractor personnel on site is the responsibility of the Contractor.

b. The Contractor and on-site superintendent shall attend an Air Force safety briefing conducted by base personnel at the pre-construction meeting and comply with all safety procedures.

c. All personnel shall comply with Air Force on-site safety procedures and additional procedures as directed by the COR when the Contractor's safety person is not immediately available.

d. Equipment shall be placed so as not to impede normal traffic in and out of the work area, or to interfere with emergency exit from work area and off-site.

e. Emergency flashlights shall be provided by the Contractor and shall be available in the crew's work area at all times.

f. Elevator load limit. The elevator load limits are posted. DO NOT exceed the maximum posted limit. Close elevator doors when elevator is not in use.

g. All vehicles shall be in safe operating condition. Vehicles and equipment not complying shall not be allowed on site.

A number of hazards inherent to the work environment must be recognized, including:

a. Electrical circuits and devices pose serious and generally continuing hazards. The Contractor shall take every precaution to prevent personnel injury.

b. Mechanical devices (i.e., fans) can pose serious hazards when operated.

Appropriate precautions shall be taken.

First Aid and Medical Requirements:

a. The Contractor shall comply with Air Force accident response requirements.

These requirements are provided in a safety briefing by base personnel at the pre-construction conference. The Contractor shall keep these requirements on file at the working site for inspection by Air Force personnel.

b. The COR shall coordinate emergency medical, ambulance, or airlift requirements.

c. All accidents (employee injuries and vehicle, building, equipment or property damage, etc.), regardless of severity, shall be reported immediately to the COR.

d. Emergency Operations. The Contractor shall provide, within ten (10) working days after award, a list of key Contractor personnel and telephone numbers to the COR to affect early notification of any emergency that arises (during non-working hours) due to an incident related to this contract. It is the responsibility of the Contractor to:

e. Notify the Government inspector/escort of any emergency situation. The

Government inspector/escort will follow local emergency procedures.

f. Ensure that all Contractor personnel are evacuated from the site and accounted for.

g. Assist in administering first aid, as required, and evacuate injured personnel.

h. Obtain emergency services as required.

i. Avoid movement of and alterations to, any possible evidence of the cause of an emergency, incident, or accident. Removal of injured personnel or the need to prevent further damage takes precedence over this requirement.

1.8.1 SPECIAL SAFETY CONCERNS

Work in confined spaces.

a. Respirators, eye protection, and hard hats shall be worn in crawl space locations.

b. Fire Regulations. Compliance with local and Air Force Fire Regulations is mandatory. Fire extinguishers rated and approved by the National Fire Protection Association, and Base Fire Department of sufficient size, type, and quantity to cope with all known hazards, will be available and provided by the Contractor.

1.8.2 WELDING SAFETY PRECAUTION:

Welding Safety Requirements: Before welding, the Contractor shall obtain a welding permit from Base Fire Department, within ten (10) working days after award, before any open flame or welding operation is conducted. The Contractor shall allow five (5) workdays for processing the permit. No welding actions shall occur without the welding permit in hand and on site. The welding permit shall be renewed every 30 days or when entering a new flight area. The Contractor shall conduct his work such that after any welding operation a one hour (minimum) fire watch in the area in which welding has occurred is conducted.

Welding will be accomplished in strict accordance with the following: GENERAL

REQUIREMENTS FOR WELDING AIR FORCE TECHNICAL ORDER (T.O.) 21M-LGM30A-12.

The prospective work area will be inspected by the Project Engineer to ensure that prescribed precautions have been taken.

The Contractor will perform atmospheric tests before, during, and after the operation to assure that no dangerous conditions of flammability or toxicity exist.

W A R N I N G

Oxygen gas should not be released for purpose of clearing the air before, during, or after welding operations. Release of oxygen gas shall be for welding or cutting purposes only.

Prior to initiation of welding/cutting or open flame soldering operations, combustible material will be removed from the area. Residue from spills and leaks will be cleaned up. Materials that cannot be removed will be protected against the possibility of ignition from operation.

The Contractor will post a fire watch person on any welding, cutting, open flame, heat or spark producing operation below grade and where flammable materials cannot be removed from within the welding area. One fire watch person may perform for more than one welder provided he can properly monitor all operations assigned to him. Carbon dioxide and water type fire extinguishers shall be accessible and the fire watch person shall be trained in their use.

Ventilation for General Welding and Thermal Cutting shall be in accordance with ANSI A 49.1. During ventilation procedures, the Contractor shall exhaust contaminated air through an adequate duct system. Ventilation will be installed via flexible ducts connected to a negative air machine with a HEPA filter. This system will then be hooked up to existing system that provides ventilation for the LCC. The ventilation system shall have a minimum capture velocity of 160 cubic feet per minute (cfm) at two feet from the intake.

The Contractor will provide personal protective equipment for welders and helpers.

A fire-resistant shield of non-asbestos material, sheet metal, or similar material will be constructed to contain the work area. Critical equipment, electrical cables, and lines in the welding area will be protected with non-asbestos blanket or other suitable material. All critical equipment will be inspected after welding is completed to insure that these parts have not been damaged.

Air duct openings will be covered with fire resistant covers to prevent entrance of sparks. Covers will be used which will allow ventilating and cooling air to circulate adequately.

If oxygen and acetylene tanks are used, they will be located above grade and placed in a vertical position. They will be accessible to personnel when welding/cutting or soldering is in progress. Valves will be closed at the tanks during any work stoppage. Hose lines will be inspected daily for hose leaks.

Hose lines will be anchored by ties so that the hose connections are not used to support the hose. Padding will be provided to protect hose lines at all corners or sharp projections.

All welding power source equipment will be located above grade. It will be accessible to personnel and will be shut off and disconnected during any work stoppage. Electrodes will be removed from holder when not in use.

Electrical welding cable will be entwined at least one turn per two linear feet from entrance to LCC to within six feet of electrode holder.

Welding leads will be isolated from frame of welder.

A minimum of two feet must be maintained between electrical welding leads and explosive devices and/or their circuitry.

Electrical welding grounding point will be located as close as practical to the weld point.

Inert gas shield arc, high voltage start, arc air gouging or transformer-type welder shall not be used except with specific approval from the System Support Manager at OOAMA.

1.9 OTHER CONTRACTOR REQUIREMENTS

In addition to those requirements outlined in this specification, the Contractor is responsible for the following:

a. Any power process, i.e., welding, core drilling, etc. in the elevator shaft, TJ and LCEB areas requiring more than 20 amps shall require shutdown of the LCC. Equipment requiring more than 40 amps shall not be used on site under any circumstance. Contractor must provide own power for any processes requiring more than 20 amps. Contractor must notify Missile Engineering one month in advance of any such work so that LCC shut down may be scheduled.

b. The Contractor shall maintain, at each location, all Material Safety Data Sheets (MSDSs) pertinent to hazardous material used in the project in compliance with OSHA's Hazardous Communications Standard 29 CFR 1910.1200.

MSDSs will be available to all contractors and Government inspector/escort at all times during construction. MSDSs data will be available on all hazardous material used in the contract and all Contractor personnel will be made aware of the requirements.

c. The Contractor shall furnish and maintain, on site, the following:

1. Explosion proof flashlight and batteries (One (1) per person).

2. Safety harness/lanyard, equipment lowering nets, and hoist (as required).

3. Two (2) portable fire extinguishers rated at 2A 20 BC minimum.

4. One emergency first aid kit.

d. All items of work to be concealed shall be Government inspected prior to concealment.

1.10 AVAILABILITY OF UTILITY SERVICES

Except where restricted in these specifications, in other sections for certain tasks, all reasonable quantities of utilities including power up to 20 amps shall be made available to the Contractor. No temporary connections which may be of a semi-permanent nature will be permitted. All connections shall be made by plugging into existing receptacles while work is in progress for electrical service. All extension cords must be GFI protected. All electrical cords shall be unplugged at the end of each work period. The Contractor must make arrangements for furnishing additional external electrical power for welding, drilling or additional lighting. The power generator must be located topside at a minimum distance of 10 feet from the building. Water connections, where required, shall be made with standard garden hose and hose bib fittings. This refers only to service water for contractual work requirements. All hoses will be disconnected and valves closed to hose outlets at the end of each work shift.

All hoses and/or power cords will be removed at the close of work each day so that all doors, elevator doors, and blast doors may be operated in their normal manner during Contractor non-working hours. Electrical power plug-ins and water connections will be cleared by the Government inspector/escort before they are made.

1.11 COORDINATION AND VERIFICATION OF DIMENSIONS

The Contractor shall be responsible for coordinating his work so as to minimize interference to the operational equipment and personnel in the building, as the facility will remain operational during construction. Extreme caution shall be exercised to prevent damage to the equipment from dust, water, etc. It shall be the Contractor's responsibility to furnish drop cloths and whatever material may be required to keep equipment safe at all times from dust and debris. All salvage material and debris shall be properly disposed of offsite, by the Contractor, in a manner in accordance with Federal, state, and county rules and regulations.

The Contractor shall visit the premises and thoroughly familiarize himself with the details of the work and conditions prior to starting work. The dimensions given on the drawings are for general reference only and shall be field verified by the Contractor prior to commencement of work at each site.

1.12 QUALITY OF WORKMANSHIP

The various trades involved in performing the work in this project shall be competent and highly skilled in their particular trade and their qualifications shall meet all State and American Welding Society publications' requirements, such as set forth for welders, plumbers, etc. Only skilled craftsmen in the trades required for the job shall be performing the work. A journeyman level pipe fitter, with a minimum of four (4) years’ experience in the trade and currently licensed shall perform all pipe fitting. Contractor shall provide a copy of the pipe fitter’s certificate of licensing. All work shall result in the highest standards of workmanship, safety and quality. The COR may, in writing, require the Contractor to remove from the project any employee deemed incompetent, careless, or otherwise objectionable to personal safety, equipment, or the quality of workmanship.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section –

DIVISION 1 GENERAL REQUIREMENTS

SUBMITTALS

SECTION 01 33 00

1. GENERAL:

1.1 PROCEDURES:

1.1.1 The Contractor shall be required to submit items listed in the Submittal Schedule at the end of this section.

1.1.2 Transmittal

Prior to starting any work, all items listed on the attached Submittal Register shall be submitted on an individual AF IMT 3000.

1.1.3 Identifying Submittals

When submittals are provided by a Subcontractor, the Prime Contractor is to prepare, review and stamp with Contractor's approval all specified submittals prior to submitting for Government approval.

Identify submittals, with the following information permanently adhered to or noted on each separate component of each submittal and noted on transmittal form. Mark each copy of each submittal identically, with the following:

a. Project title and location.

b. Construction contract number.

c. Date of the drawings and revisions.

d. Name, address, and telephone number of subcontractor, supplier, manufacturer and any other subcontractor associated with the submittal.

e. Section number of the specification section by which submittal is required.

f. Submittal description (SD) number of each component of submittal.

g. When a resubmission, add alphabetic suffix on submittal description, for example, submittal 18 would become 18A, to indicate resubmission.

h. Product identification and location in project.

1.1.4 Unless specifically stated otherwise elsewhere in this specification, each submittal shall be approved by the COR prior to incorporation of the submitted materials into the work.

1.1.5 Approvals of submittals that do not conform to the Contract shall not be construed as a change to the contract.

1.2 SD-01 PRECONSTRUCTION SUBMITTALS

Submittals which are required prior to start of construction (work), issuance of contract notice to proceed, or commencing work on site, includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.

Certificates of insurance Surety bonds

List of proposed Subcontractors

List of proposed products

Construction progress schedule

Submittal register

Health and safety plan

Work plan

Quality Control(QC) plan

Environmental protection plan

1.3 MANUFACTURER'S DATA AND SAMPLES:

For the following types of submittals, when a specific product of a specific manufacturer is identified (by catalog or product number, pattern, or style) and the Contractor does not desire to propose an alternate product as an equal, where an equal is allowed, a detailed submittal will not be required, but must be approved by project engineer. The Contractor shall submit on an AF Form 3000 a list of submittals for which the specified products will be used. Submit in accordance with procedures identified in 1.1 above.

1.3.1 SD-03 Product Data:

Submit complete manufacturer's literature that describes all salient characteristics identified as requirements in the specification. Literature that is not specific to the proposed product shall be marked to “indicate clearly” which item is being proposed for use in this contract.

1.3.2 SD-07 Manufacturer's Certification:

Submit a statement from the product manufacturer that proposed products meet the specified standards and other salient characteristics identified as requirements in the specification.

1.3.3 SD-08 Installation Instructions:

Submit manufacturer's printed instructions for delivery, storage, assembly, installation, start-up (if applicable) and adjustments. Information shall include temperature restrictions and any other environmental limitations as well as substrate preparation requirements if any exist.

1.4 SD-11 Closeout Submittals

Submit documentation to record compliance with technical or administrative requirements or special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings.

1.5 SHOP DRAWINGS:

Drawings shall illustrate how the specified materials are integrated into the work as a whole. Adjacent materials that affect the complete installation of the specified products shall be shown and identified. Deviations from Contract drawings shall be clearly identified and reason for deviation clearly explained.

1.6 TEST DATA:

Test results shall be dated and signed by the agency performing the test.

1.7 WARRANTY:

Submit detailed warranty information that identifies specifically items covered as well as exclusions from the warranty and the warranty period. All copies shall be dated and signed by an authorized officer of the company. The officer's name and title shall be typed on the warranty adjacent to the signature.

1.8 OPERATION/MAINTENANCE INSTRUCTIONS:

The Project Engineer for this project will review and recommend approval/disapproval to the Contracting Officer to verify the submittals comply with the contract requirements; submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.

In the event the Contractor fails to deliver O&M Data within the time limits specified, the Contracting Officer may withhold from progress payments 50 percent of the price of the item with which such O&M Data are applicable.

1.9 MISCELLANEOUS SUBMITTALS:

Submittals that are none of the above types shall meet the specific requirements identified in the referenced paragraph of the Specification Section identified in the schedule.

1.10 SUBMITTAL SCHEDULE:

The required submittals for this Contract are listed on attached AF Form 66.

End of Section --

Welding

TECHNICAL PROVISIONS

SECTION TWO

WELDING

2.1 APPLICABLE PUBLICATIONS: The following publications of the issues listed below, but referred to thereafter by basic designation only, form a part of this specification to the extent indicated by the references thereto, and the most current issue of below listed publications shall be referenced.

ASME INTERNATIONAL (ASME)

ASME B31.1 (2012; INT 2-6, 8-10, 13, 15, 17-25, 27-31

and 42-46) Power Piping

ASME B31.3 (2012) Process Piping

ASME BPVC SEC IX (2010) BPVC Section IX-Welding and Brazing Qualifications

ASME BPVC SEC V (2010) BPVC Section V-Nondestructive

Examination

ASME BPVC SEC VIII D1 (2010) BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1

ASME BPVC SEC VIII D2 (2010) BPVC Section VIII-Rules for

Construction of Pressure Vessels Division 2- Alternative Rules

INTERNATIONAL CODE COUNCIL (ICC)

ICC IPC (2012) International Plumbing Code NATIONAL

BOARD OF BOILER AND PRESSURE VESSEL INSPECTORS(NBBI)

NBBI NB-23 (2011; AMD 2008; AMD 2009; AMD 2010)

National Board Inspection Code PIPE

FABRICATION INSTITUTE (PFI)

PFI ES 1 (2010) Internal Machining and Solid Machined Backing Rings for Circumferential Butt Welds

PFI ES 21 (2010) Internal Machining and Fit-up of GTAW

Root Pass Circumferential Butt Welds

PFI ES 3 (2004) Fabricating Tolerances

PFI ES 31 (1992; R 2004) Standard for Protection of Ends of Fabricated Piping Assemblies

PFI ES 35 (1998; R 2003) Nonsymmetrical Bevels and

Joint Configurations for Butt Welds

PFI ES 7 (2004) Minimum Length and Spacing for Welded Nozzles

PFI TB1 (2006) Pressure - Temperature Ratings of

Seamless Pipe Used in Power Plant Piping Systems

2.2 GENERAL: All welding shall be in accordance with the specified standards and as modified or supplemented by these specifications. The Contractor shall be responsible for the quality of the welding and shall set up procedures for welding all metals included in the work.

2.2.1 Welded construction shall be used only where indicated on the contract drawings and approved shop drawings. It shall conform to the AWS Specification D 1.1, Section 4.

2.3 PROCEDURE: Procedure specifications and procedure qualification tests shall be required for all welding. Procedure specifications and procedure qualification test results shall be kept by the Contractor and shall be available for examination by the COR. Welding shall not be performed on any contract item before approval of procedure and welder. An essential change in procedure shall require new procedure specification and new procedure qualification tests. Tests for qualification of procedure shall conform to the requirements of AWS Specification D1.1, Section 4.

Requirements for test results shall be as specified in ASW Specification D1.1.

There shall be no exemption from preparation and submittal of procedure specifications and qualification test results. Approved procedures for the weld being performed shall be in the possession of the welder, and shall be followed.

2.4 WELDING EQUIPMENT: Submit manufacturer’s catalog data for welding equipment, welding rods and accessories. Ensure equipment meets referenced standards contained in this section.

2.5 STRUCTURAL STEEL PROCEDURE:

2.5.1 ASTM Designation A 36 Steel: Procedure specifications and procedure qualification for welding ASTM Designation A 36 steel are required and shall conform to the requirements of AWS Specification D 1.1.

2.5.2 ASTM Designation A 312 Steel: Procedure specifications and procedure qualification for welding ASTM Designation A 312 Austenitic Stainless Steel are required and shall conform to the requirements of AWS Specification D 1.1.

2.5.3 Dissimilar Steels: Procedure specifications and procedure qualifications are required for each combination of dissimilar steels, including stainless steel and carbon steel combinations. Procedure for welding reinforcing steel shall be as hereinafter specified.

2.5.4 ASTM Designation A 240 Steel: Procedure qualification for welding ASTM Designation A 240 steel is required and shall conform to the requirements of AWS Specification D1.1.

2.6 PIPING AND WELDING PROCEDURE: All procedure specifications and qualifications of welding procedures shall be in accordance with AWS Specification B 2.1 and ASME Standard BPVC SEC IV.

2.7 PERFORMANCE QUALIFICATION OF WELDERS AND WELDING OPERATORS: Each welder and welding operator assigned to work on this contract shall be qualified by tests using the same base metals, equipment, electrodes, positions and procedures that will be encountered in his assignment. Only welders certified for the base metals, equipment, electrodes, positions and procedures being used shall be permitted to perform welding work for use in any part of this contract.

2.7.1 Welder’s Certificates: Upon completion of the applicable qualification tests, each welder and welding operator shall be provided with a certificate by the Contractor. The certificate shall state the type of welding and procedure for which he is qualified, the code and procedures under which he is qualified, and the firm or individual certifying the qualification test. The certificate shall be kept on file at the job site by the Contractor, and shall be made available for examination and approval by the Contracting Officer or the designated representative. The certificate will remain in effect for the duration of the contract, except when re-qualification of the welder or welding operator is required as specified herein.

2.7.2 Welder's Identification: Each welder shall be assigned by the Contractor an identifying number, letter, or symbol that shall be used by the welder to identify all welds made by him. For identification, the welder shall lightly stamp his symbol adjacent to the weld by means of a metal stamp. In case of seam welds, the stamp shall be adjacent to the weld at 3 foot intervals.

2.7.3 Welder’s Record: The Contractor shall maintain a record of all welders and welding operators employed on the contract showing the date and results of tests and the identification mark assigned to each welder. These records shall be certified by the Contractor and made accessible to authorized personnel.

Copies of the record shall be furnished to the Contracting Officer in accordance with the requirements for shop drawings.

2.7.4 Structural Steel: Welder qualification tests shall be as specified in AWS Specification D 1.1 for each type of steel.

2.7.5 Piping, Tanks, and Equipment: Qualification of welders shall be in accordance with the AWS Specification D 1.1 and ASME Standard B31.1, for all positions to 6g rating.

2.8 HEAT INPUT REQUIREMENTS:

2.8.1 Preheat: Do not weld at ambient temperature below 32 degrees F, or when the surfaces are wet or exposed to rain, snow, or high wind. Ensure the temperature of the metals in the area where the welding is performed is not less than 50 degrees F. When the ambient conditions are such that the normal temperature of the base metal is below 50 degrees F, preheat the area surrounding the joint to provide a base metal temperature of 100 degrees F for a distance of at least 3 inches in all directions from the joint to be welded. Preheat in accordance with ASME BPVC SEC VIII D1 and ASME BPVC SEC V.

2.8.2 Interpass: In a multi-pass weld, the interpass temperature is the temperature of the weld metal before the next pass is started. Ensure interpass requirements are in accordance with ASME BPVC SEC VIII D1.

2.8.3 Post-weld: Do not apply a post-weld heat treatment to weldments unless noted in the applicable code qualified/certified welding documentation, WPS, PQR and WPQ.

2.9 INSPECTION AND TEST DURING CONSTRUCTION: If welding operations or weld testing is to be performed at a location other than the job site, the Government reserves the right to be adequately notified and to have representatives present at the time such welding operations are performed or weld testing is accomplished.

2.9.1 The Contractor shall perform visual inspection of all welds at each site. Nondestructive liquid penetrant examinations will be conducted on all welds at the welders first site (NDE at each subsequent site the welder completes will not be required).

2.9.1.1 Visual Examination: Visually examine welds as follows:

a. Before welding -- for compliance with requirements for joint preparation, placement of backing rings or consumable inserts, alignment and fit-up, and cleanliness.

b. During welding -- for conformance to the qualified welding procedure.

c. After welding -- for cracks, contour and finish, bead reinforcement, undercutting, overlap, and size of fillet welds.

2.10 ACCEPTANCE REQUIREMENTS: Welds are acceptable if inspection indicates conformance within the following limitations:

2.10.1 Cracks: All welding exhibiting any cracks, either in the weld metal or the parent metal, will be rejected.

2.10.2 Undercut shall not be more than 1/32 inch deep.

2.10.3 Convexity or reinforcement of a weld face shall not exceed the values given in Figure 5.4 of AWS Specification D1.1 and there shall be no overlap.

2.10.4 Fusion: Incomplete fusion or lack of penetration will not be allowed.

2.10.5 Inclusions: Slag inclusions, porosity and other fusion defects less than 1/16 inch in greatest dimension will be allowed if well dispersed and the sum of the greatest dimension in any linear inch of welded joint does no exceed 3/8 inch.

2.11 CORRECTIONS:

2.11.1 In lieu of rejection of an entire piece or member containing welding that is unsatisfactory or which indicates inferior workmanship, the corrective measures listed hereunder may be permitted by the COR, whose specific approval shall be obtained for making each correction.

2.11.2 Defective or Unsound Welds or Base Metal: Shall be corrected either by removing and replacing the entire weld, or as follows:

2.11.2.1 Excessive Convexity, Overlap: Reduce by removal of excess weld metal.

2.11.2.2 Excessive concavity of weld or crater, undersize welds, undercutting: clean and deposit additional weld metal.

2.11.2.3 Excessive weld porosity, slag, inclusions, incomplete fusion:

remove defective portions and re-weld.

2.11.2.4 Cracks in weld or base metal: remove crack throughout its length, including sound weld metal 2 inches beyond each end of the crack, followed by the required re-welding.

2.11.3 The removal of weld metal or portions of the base metal shall be done by chipping, grinding, oxygen cutting, oxygen gouging, or air carbonarc gouging and in such a manner that the remaining weld metal or base metal is not nicked or undercut. Defective portions of the weld shall be removed without substantial removal of the base metal.

2.11.4 Additional weld metal shall be deposited using an electrode preferably smaller than that used for making the original weld, and preferably not more than 5/32 inch diameter. The surfaces shall be cleaned thoroughly before welding.

2.11.5 Where work performed subsequent to the making of a deficient weld has rendered the weld inaccessible or has caused new conditions which would make the correction of the deficiency dangerous or ineffectual, the original conditions shall be restored by removing welds or members, or both, before making the corrections, or else the deficiency shall be compensated for by additional work done according to an approved revised design.

2.11.6 Caulking of Welds shall not be permitted.

2.11.7 Improperly fitted parts may be cut apart and re-welded. Members distorted by welding shall be straightened by mechanical means or by carefully supervised application of a limited amount of localized heat. The temperature of heated areas shall not exceed 1,200 degrees F (a dull red color). Parts to be heated for straightening shall be substantially free of stress and from external forces, except those stresses resulting from mechanical means used in conjunction with the application of heat.

2.12 PEENING: No peening shall be done on the root or surface layers of a weld.

Peening of intermediate weld layers may be used only if authorized by the COR and directed by him. Care shall be exercised to prevent overpeening which may cause overlapping, scaling, cracking, flaking or excessive cold working of weld and base metal.

Piping and Plumbing

TECHNICAL PROVISIONS

SECTION THREE

PLUMBING AND PIPING

3.1 APPLICABLE PUBLICATIONS: The following of the issues listed below, but referred to thereafter by basic designation only, form a part of this specification to the extent indicated by the references thereto, and the most current issue of below listed publications shall be referenced:

3.1.1 Federal Specifications

BB-C-120 Chlorine

HH-I-558 Insulation, Thermal (Flexible Unicellular

Sheet Pipe Covering)

WW-P-541/Gen Plumbing Fixtures, Land Use

3.1.2 Military Specifications:

MIL-E-15145C Paint, Zinc Dust Pigmented, Fresh Water Tank Protective Formula No. 102

MIL-P-15280J Plastic Form, Unicellular Sheet and Tubular Form Elastomeric

MIL-P-24691 Pipe and Tube, Carbon, Alloy and Stainless Steel, Seamless and Welded (including Amendments)

3.1.3 National Bureau of Standards Handbook

H28 Screw-Thread Standard for Federal Services

3.1.4 American Society for Testing and Materials Publications:

A 105 Forged or Rolled Steel Pipe Flanges, Forged Fittings and Valves and Parts for High-Temperature Service

A 182 Forged or Rolled Alloy-Steel Pipe Flanges, Forged Fittings and Valves and Parts for High-Temperature Service

A 193 Alloy-Steel and Stainless Steel Bolting Materials for High Temperature Services

A 194 Carbon and Alloy Steel Nuts for Bolts for High-Pressure and High-Temperature Service

A 312 Seamless and Welded Austenitic Stainless Steel Pipe

A 450 General Requirements for Carbon, Ferritic Alloy, and Austenitic Alloy Steel Tubes

A 530 General Requirements for Specialized Carbon and Alloy Steel Pipe

B16.3 Pipe Fitting, Flange Fitting and Flanges, Ferrous and Steel, (Screwed and Butt- Welded 150 Pound)

D 235 Stoddard Solvent

E 1229 Calcium Hypochlorite

3.1.5 American Society of Mechanical Engineers Publications:

B16.5 Steel Pipe Flanges and Flanged fittings

B16.9 Wrought Steel Butt-welding Fittings

B16.20 Gaskets for Standard Flanges

B16.21 Nonmetallic Gaskets for Pipe Flanges

B16.39 Unions, Pipe, Steel or Malleable-Iron Threaded Connection

B31.1 Code for Pressure Piping

3.1.6 Steel Structure Painting Council Specifications:

5 SPC-Sp10-3T Near White Blast Cleaning

3.2 GENERAL:

The general arrangement of the plumbing modifications shall be as indicated on the contract drawings. As-built drawings will be made available. The Contractor shall examine the drawings and verify the installation at the site. Routing of piping shall be essentially as shown. The Contractor shall provide all offsets and fittings required to make the installation complete.

3.2.1 Dismantling of Piping: Existing piping shall be dismantled and scrapped as specified.

3.2.2 Cutting and Repairing: The work shall be carefully laid out in advance, and no excessive cutting of construction will be permitted. Damage to structure, piping, wiring or equipment as a result of cutting for installation shall be replaced by craftsman skilled in the trade involved, at no additional expense to the Government.

3.2.3 Protection to Fixtures, Materials and Equipment: Pipe openings shall be closed with caps or plugs during installation. Equipment shall be tightly covered and protected against dirt, water and chemical or mechanical injury.

Upon completion of all work, the materials and equipment shall be thoroughly cleaned.

3.3 MATERIALS: Shall be new and conform to the respective specifications and other requirements specified below. Other materials shall be as specified elsewhere herein, and as shown on the drawings.

3.3.1 Pipe:

3.3.1.1 Stainless Steel Pipe: ASTM A312, Military Specification MIL-P-24691, Type 316, Schedule 80.

3.3…

This is the start of the file's text. The full file is on GovTribe.