Questions_and_Answers_for_FA4613.pdf

PDF 58 KB Posted

Attached to
Install COMM Room Power Panels Federal contract opportunity
Solicitation number
FA4613-17-R-0005
Issued by
Department of the Air Force Global Strike Command

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Install COMM Room Power Panels, newest first.
File Type Posted
SF30_Mod_Doc.pdf PDF
Atch_4,_Wage_Determinations_20_Jan.pdf PDF
SF_30_modified_doc.docx DOCX document
SOW_(17-6050)_-19DEC16.pdf PDF
AF_Form_66.pdf PDF
SF_30.pdf PDF
AF_Form_66.pdf PDF
1442_Solicitation.pdf PDF
Wage_Determinations_1_06_17.pdf PDF
SOW_(17-6050)_-19DEC16.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for FA4613-17-R-0005

Install Comm Room Power Panel at 15 Missile Alert Facilities

Q1: On the drawings, should the breaker that feeds the 100A panel be a 100A breaker or the 225A breaker as shown?

A1: The breaker should be changed to be a 100A breaker

Q2: The wire size shown #4 wire is only rated for 80A. The wire size needs to be #2 for 100, please confirm changing the wire size.

A2: Only copper wire is used on AF installations; 4 AWG is rated for 100 A.

However must be rated as per code.

Q3: There is only one ground wire shown. If the new panel is to have an Isolated Ground there needs to be another ground wire added, please confirm adding another ground.

A3: Yes, there should be two insulated grounds running to the new panel (one for Equipment and one for Isolated Ground).