Amendment 0004_VBMS Install Questions and Responses.pdf

PDF 126 KB Posted

Attached to
Amendment 0005 - Vindicator Badge Management System Install Federal contract opportunity
Solicitation number
FA461024QVBMS
Issued by
Department of the Air Force Space Command

About this file

This document is an amendment to a Combined Synopsis/Solicitation for the Vindicator Badge Management System Install (FA461024QVBMS) contract opportunity. It provides responses to questions from potential offerors regarding the required products and services.

The key details are:

  • The contract is for the installation of a Vindicator Badge Management System, including the integration of signature pads, cameras, and signal boosters/extenders. The work will be performed at 108 Colorado Ave, Bldg. 13675, Room 142, with potential access required to servers in Bldg 1978.
  • This is a Firm-Fixed Price contract, with the contractor required to provide three 1-year annual service plans. After the service plans expire, maintenance will be handled by the government.
  • The applicable NAICS code is 561621 and this is a 100% Small Business Set-Aside. Quotes are due by 1:00 PM (PDT) on Tuesday, April 2, 2024.
  • A technical point of contact, Chris LaGatta, has been identified for questions related to the planned installation.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0005 - Vindicator Badge Management System Install, newest first.
File Type Posted
Amendment 0005_Attach. 2 - Pricing Schedule.xlsx XLSX spreadsheet
Amendment 0004_SOW Attachment 1 - VBMS Equipment List.xlsx XLSX spreadsheet
Amendment 0004_Attach.1 - Statement of Work (SOW).pdf PDF
Amendment 0004_SOW Attachment 3 - VBM Install Office Layout.pptx PPTX presentation
Attach. 4 Contract Clauses and Provisions.pdf PDF
Combined Synopsis Solicitation.pdf PDF
Attach. 1 - Statement of Work (SOW).pdf PDF
SOW Attachment 1 - VBMS Equipemnt List.pdf PDF
SOW Attachment 2 - PROOFING AND VETTING FOR EMPLOYEES.pdf PDF
Attach. 2 - Pricing Schedule.xlsx XLSX spreadsheet
Attach. 3 - SCA WD 2015-5647 Rev 20.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vindicator Badge Management System Install (FA461024QVBMS) Questions and Responses

Question 1: Do the Signature Pad and camera need to be purchased? (Ref: SOW Section 3.1) Response 1: Per the Statement of Work (SOW) the signature pad and camera have already been purchased and just require to be installed.

Question 2: Please provide more info on “Signal Booster”. What kind of signal is to be boosted? (Ref:

SOW Section 3.2) Response 2: DVI signal boosters/extenders. The physical VBM workstations will be located in the server rack in the Comm Room next door to the Pass and ID Office they will be operated in, so they’ll need boosters to run on the DVI Easy Pull, 100 ft cables (Also noted in the SOW).

Question 3: Does this mean that Labor, Parts, Travel and Shipping should be included in the cost? (Ref:

SOW Section 3.5(c)) Response 3: Yes, this is a Firm-Fixed Price contract.

Question 4: Do the items on the equipment list which state “Already Installed in Pass and ID” still need to be installed? (Ref: SOW Attachment 1 - Equipment List) Response 4: The verbiage “Already installed in Pass and ID” has been removed. Please see updated equipment list.

Question 5: Will installation solely take place at 108 Colorado Ave, Bldg. 13675, Room 142? If not, how far away are the other installation locations, and is there open pathway/raceway to the installation locations?

Response 5: The physical equipment installation will be exclusively at 108 Colorado Ave, Bldg. 13675, Room 142. Please see the install office layout. If physical access to the VSS servers is needed, they are located at Bldg 1978, approximately a 20–25-minute drive from Pass and ID. Both locations should have no obstacles for access.

Question 6: Is there a technical POC available for questions related to the planned installation?

Response 6: Chris LaGatta - christopher.lagatta@mcdean.com is the on-site tech.

Question 7: Do you need the three (3) one (1) year annual service plans priced into the whole effort?

(Ref: SOW Section 3.5) Response 7: Yes.

Question 8: What documentation is required to be submitted for the quote to be considered responsive?

Response 8: Per the Combined Synopsis/Solicitation submit the Pricing Schedule completed and a technical narrative.

Question 9: Do you have an estimate of expected number of service calls the contractor should anticipate? (Ref: SOW Section 3.5) Response 9: As needed.

Question 10: Are you wanting a full-time body on-site to respond to service calls? (Ref: SOW Section 3.5) mailto:christopher.lagatta@mcdean.com

Response 10: Per the Statement of Work (SOW), if it’s determined by the Contractor that a component, software, or other required equipment needs additional attention that is beyond phone, email, or remote support; the Contractor shall be on site (if not already) to fix the issue within ten (10) calendar days.

Question 11: Would maintenance be better handled by the folks that are already doing maintenance on the rest of the system?

Response 11: The install contractor shall provide three (3), one (1) year annual service plans IAW the Statement of Work (SOW). After the service plans expire, MC Dean will assume maintenance responsibilities.