30 FSS Multi-Use Gym Floor Q and A.pdf

PDF 249 KB Posted

Attached to
30 FSS Vinyl Multi-Use Sports Flooring
Solicitation number
FA461024QGFLR
Issued by

About this file

This document is a set of questions and answers related to a federal Request for Quote (RFQ) for the installation of vinyl multi-use sports flooring in a gymnasium at Vandenberg Space Force Base. The RFQ includes the replacement of the existing floor, sports line painting, associated wall base, and other work as detailed in the Performance Work Statement (PWS). The procurement is a 100% Small Business Set-Aside under NAICS code 321918 with a size standard of 500 employees. Quotes are due by September 4, 2024 at 1:00 PM PDT and must be submitted via email. The contract will be Firm Fixed Price based on the provided pricing sheet. The document provides information on the existing gym space, including dimensions, the presence of bleachers, and the condition of the subfloor. It also indicates the desired installation timeline, with a preference to have the work completed by Thanksgiving.

View the file

Other files

File Type Posted
y8.jpg JPG image
y3.jpg JPG image
y5.jpg JPG image
y6.jpg JPG image
y2.jpg JPG image
y7.jpg JPG image
y1.jpg JPG image
y4.jpg JPG image
Attachment 3 - Clauses and Provisions.pdf PDF
Attachment 1 - B16170 Gym_Flooring PWS_Jul24.pdf PDF
Attachment 2 - Request for Quote Price List.xlsx XLSX spreadsheet
Combined Synopsis Solicitation.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

30 FSS Mul -Use Gym Floor Q&A Responses

Q1. Can an exis ng floor plan or dimensions of the gym be provided?

A1. About 95’ x 66’ with a few pop-outs at doors and bleachers (see photos)

Q2. Are there bleachers and will they stay in place or need to be removed?

A2. Yes, moved and replaced. See pics for a achment at wall and size.

Q3. Can any photos of exis ng space be provided? (What logos and gamelines are needed) Q3. Yes

Q4. Can a list of equipment that is in the exis ng gym and needs to be moved be provided?

Q4. Chairs and tables in photos will be moved by customer. Only bleachers will need to be moved by contractor.

Q5. What class sports floor is desired? (Class 1, 2, 3 or something higher) A5. 2

Q6. Is the exis ng sub floor concrete?

A6. Yes, see photos

Q7. When is the expected/desired installa on date or how long would contractor have to complete a er NTP?

A7. Nothing in par cular. They will want to use the space at Thanksgiving.

File details come from the government source that posted it. Updated .