Attachment_3_RMD.pdf

PDF 162 KB Posted

Attached to
XUMU 17-1129B, Repair Heater Units Building 10711
Solicitation number
FA461019RA042
Issued by

About this file

Attach 3, RMD

View the file

Other files

File Type Posted
19RA042_RFI_Draft_Final_20190726.pdf PDF
Attachment_8_Submittal_Procedures.pdf PDF
Attachment_4_EP.pdf PDF
Attachment_2_Specifications.pdf PDF
Attachment_10_Material_Submittal_Schedule.xlsx XLSX spreadsheet
Attachment_9_Wage_Determination.pdf PDF
Attachment_5_Con._Cost._Breakdown.xlsx XLSX spreadsheet
Attachment_7_Quality_Control.pdf PDF
Attachment_6_LNF.pdf PDF
SOL.pdf PDF
Attachment_1_Statement_of_Work.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

30TH SPACE WING (AFSPC)

GUARDIANS OF THE HIGH FRONTIER

02 Apr 19

MEMORANDUM FOR 30 CONS/PKA

ATTENTION: ALBERT THOMPSON JR.

FROM: 30 CES/CENMP

SUBJECT: Recovered Materials Determination, Project XUMU 17-1129B Repair Heat Unit 4, 5 Heater Rm 3, Facility 10711.

1. In accordance with the sustainable procurement policies, also known as Green Procurement, the

Environmental Protection Agency (EPA) web site resources have been researched and products have been incorporated into the government’s Statement of Objectives where they meet the technical requirements of the project and are economically feasible to incorporate. Where possible, Green products listed in the Statement of Objectives are called out by specific manufacturer and model and must be complied with by the contractor unless an alternate product meeting the same standards is proposed by the contractor and approved by the contracting officer. The attached Recovered Materials Determination Form (RMDF) has also been included to identify those EPA “designated products” that will be used in the execution of the project.

2. The Statement of Objectives is a concept approach and is not the final plan. The contractor, in completing the concept approach and prior to submission of his final plan, shall research the applicable EPA web site resources to determine if the products specified in the statement of objectives still meet the technical and economic standards. Where changes are required, the contractor’s final plan shall reflect the changes with adequate justification to support the need to change. In addition to the changes, the contractor shall include any additional Green products that, as a result of his final plan, meet the technical and economic standards and can be incorporated into the project. The attached RMDF shall be utilized as a checklist in developing the final plan and submitting any waivers for use of green products. The checklist shall be completed and submitted to the contracting officer as part of the proposal package submission.

RANDALL D. PICKARD, GS-11, USAF

PROJECT MANAGER, SABER

Attch:

1 RMDF

2019-04-02T08:36:08-0700
PICKARD.RANDALL.D.1211077928

File details come from the government source that posted it.