About this file
Attach 3, RMD
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19RA042_RFI_Draft_Final_20190726.pdf | ||
| Attachment_8_Submittal_Procedures.pdf | ||
| Attachment_4_EP.pdf | ||
| Attachment_2_Specifications.pdf | ||
| Attachment_10_Material_Submittal_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_9_Wage_Determination.pdf | ||
| Attachment_5_Con._Cost._Breakdown.xlsx | XLSX spreadsheet | |
| Attachment_7_Quality_Control.pdf | ||
| Attachment_6_LNF.pdf | ||
| SOL.pdf | ||
| Attachment_1_Statement_of_Work.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
30TH SPACE WING (AFSPC)
GUARDIANS OF THE HIGH FRONTIER
02 Apr 19
MEMORANDUM FOR 30 CONS/PKA
ATTENTION: ALBERT THOMPSON JR.
FROM: 30 CES/CENMP
SUBJECT: Recovered Materials Determination, Project XUMU 17-1129B Repair Heat Unit 4, 5 Heater Rm 3, Facility 10711.
1. In accordance with the sustainable procurement policies, also known as Green Procurement, the
Environmental Protection Agency (EPA) web site resources have been researched and products have been incorporated into the government’s Statement of Objectives where they meet the technical requirements of the project and are economically feasible to incorporate. Where possible, Green products listed in the Statement of Objectives are called out by specific manufacturer and model and must be complied with by the contractor unless an alternate product meeting the same standards is proposed by the contractor and approved by the contracting officer. The attached Recovered Materials Determination Form (RMDF) has also been included to identify those EPA “designated products” that will be used in the execution of the project.
2. The Statement of Objectives is a concept approach and is not the final plan. The contractor, in completing the concept approach and prior to submission of his final plan, shall research the applicable EPA web site resources to determine if the products specified in the statement of objectives still meet the technical and economic standards. Where changes are required, the contractor’s final plan shall reflect the changes with adequate justification to support the need to change. In addition to the changes, the contractor shall include any additional Green products that, as a result of his final plan, meet the technical and economic standards and can be incorporated into the project. The attached RMDF shall be utilized as a checklist in developing the final plan and submitting any waivers for use of green products. The checklist shall be completed and submitted to the contracting officer as part of the proposal package submission.
RANDALL D. PICKARD, GS-11, USAF
PROJECT MANAGER, SABER