19RA042_RFI_Draft_Final_20190726.pdf
PDF 157 KB Posted
- Solicitation number
- FA461019RA042
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_8_Submittal_Procedures.pdf | ||
| Attachment_4_EP.pdf | ||
| Attachment_2_Specifications.pdf | ||
| Attachment_3_RMD.pdf | ||
| Attachment_10_Material_Submittal_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_9_Wage_Determination.pdf | ||
| Attachment_5_Con._Cost._Breakdown.xlsx | XLSX spreadsheet | |
| Attachment_7_Quality_Control.pdf | ||
| Attachment_6_LNF.pdf | ||
| SOL.pdf | ||
| Attachment_1_Statement_of_Work.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
30TH SPACE WING (AFSPC)
GUARDIANS OF THE HIGHER FRONTIER
28 Aug 2019
MEMORANDUM FOR ALL CONTRACTORS
FROM: 30 CONS/PKA
1515 Iceland Ave.
Bldg. 8500, Room 150 Vandenberg AFB, CA 93437-5212
SUBJECT: XUMU 17-1129BB, Repair Heater Units Building 10711, Request for Information (RFI) Questions and Answers (Q&A)
1. The following RFIs have been answered by the Project Manager:
Question 1: SOW 1.3 Subpart B as well as the project title references Heaters 4 & 5. However, as-built sheet M-2 and units viewed at the site visit indicated Heaters 2 & 3. Please confirm the heater unit numbers to be repaired.
Answer 1: The two units identified at the site visit will be the two units replaced under the project.
Question 2: Will it be acceptable for the site superintendent to be the Quality Control Manager and Site Safety and Health Officer (all three hats)? Please advise.
Answer 2: Yes.
2. All questions and concerns should be emailed to the Contract Specialist, SrA Skylar Baird, skylar.baird@us.af.mil.
DUAYNE G. MARTINEZ
Contracting Officer
Cc: Randall Pickard, 30 CES/CENMP
| SUBJECT: XUMU 17-1129BB, Repair Heater Units Building 10711, Request for Information (RFI) Questions and Answers (Q&A) |
| 1. The following RFIs have been answered by the Project Manager: |
| 2. All questions and concerns should be emailed to the Contract Specialist, SrA Skylar Baird, skylar.baird@us.af.mil. |