Atch_6_Technical_Questionnaire_Substation_Mnx_20190207.doc
DOC document 118 KB Posted
- Attached to
- FA4610-19-Q-A001 Substation Maintenance Federal contract opportunity
- Solicitation number
- FA4610-19-Q-A001
About this file
Attachment 6, Technical Questionnaire.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_2_PWS-R1_Sub_Mnx_20190403.pdf | ||
| Atch_8_Substation_Mnx_RFQ-R1.xlsx | XLSX spreadsheet | |
| QA_Substation_Maintenance_20190404.pdf | ||
| Atch_10_Monthly_Substation_Report.xlsx | XLSX spreadsheet | |
| 19QA001_Sub_Mnx_SV_Minutes.pdf | ||
| Atch_3_SCA_WD_15-5647_R7_20181226.PDF | ||
| Atch_1_Clauses_20190227.pdf | ||
| Atch_5_Environmental_Compliance.pdf | ||
| Atch_7_Teaming_Arrangement.docx | DOCX document | |
| Atch_4_Substations_Layout.PDF | ||
| Atch_2_PWS_Substation_Maintenance_20181126.pdf | ||
| Atch_8_Substation_Mnx_RFQ.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Substation Maintenance
FA4610-19-Q-A001
Attachment 6
SUBSTATION MAINTENANCE
TECHNICAL RESPONSE QUESTIONNAIRE
Source Selection Sensitive (when filled-out) IAW FAR 2.101 and FAR 3.104 INSTRUCTIONS: For each factor below, in the first table provide a detailed description of specific tasks performed for that sub-factor. Use the reference table to provide up to five (5) references (a minimum of three (3) must be provided) per factor to support the experience claimed in the first table. [Reference Addendum to FAR 52.212-1].
STANDARD OF ACCEPTABILITY
To Be Considered Technically Acceptable for Factor 1: The contractor’s responses - which must include references and contact information to support the experience claimed by offeror - evidence that the contractor has five (5) years of experience - within the last five (5) years preceding the release of this request for proposal - performing each of the specific tasks described in factors 1 through 3.
Factor 1: At least five (5) years of experience performing Sub- Transmission Level Substation Maintenance and Inspection tasks identified in the table immediately below within the last five (5) years preceding the release of this request for proposal. Use the narrative block in the table immediately below to provide a detailed description of specific tasks performed evidencing Substation Maintenance and Inspection Capability.
| Substation Maintenance and Inspection Capability |
| Five (5) Years of Experience |
- Ability to provide preventative and predictive diagnostic maintenance to sub-transmission substations
- Have you performed Transformer Maintenance, Circuit Breaker Maintenance, Air Disconnecting Switch Maintenance, Insulator Inspection, Decontamination, Grounding and Lightning Protection Systems and Structures and Fencing Inspections? Please describe in detail.
Ref: PWS, paragraphs 2.2 – 2.9 Yes or No
Narrative:
Reference #1, Factor 1 At least 3 reference, but up to 5 maximum references for factor 1.
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub (S)? |
Check as appropriate
FORMCHECKBOX
P FORMCHECKBOX
S
POC Name:
Phone #:
Email:
Reference #2, factor 1
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub (S)? |
FORMCHECKBOX
S
POC Name:
Reference #3, Factor 1
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub (S)? |
FORMCHECKBOX
S
POC Name:
Reference #4, Factor 1
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub (S)? |
FORMCHECKBOX
S
POC Name:
Reference #5, Factor 1
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub (S)? |
FORMCHECKBOX
S
POC Name:
Factor 2: At least five (5) years of experience performing various transmission level repairs tasks identified in the table immediately below within the last five (5) years preceding the release of this request for proposal. Use the narrative block in the table immediately below to provide a detailed description of specific tasks performed evidencing Transmission Level Repairs.
| Transmission Level Repairs Capabilities |
| Five (5) Years of Experience |
Ability to perform (not limited to):
- LTC repairs and diagnostics
- Bushing Replacement
- Gauge Repair Please explain your process for each of these.
Ref: PWS, paragraph 4 Yes or No
Narrative:
Reference #1, Factor 2 At least 3 reference, but up to 5 maximum references for factor 2.
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub (S)? |
FORMCHECKBOX
S
POC Name:
Reference #2, Factor 2
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub (S)? |
FORMCHECKBOX
S
POC Name:
Reference #3, Factor 2
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub (S)? |
FORMCHECKBOX
S
POC Name:
Reference #4, Factor 2
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub (S)? |
FORMCHECKBOX
S
POC Name:
Reference #5, Factor 2
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub (S)? |
FORMCHECKBOX
S
POC Name:
Factor 3: At least five (5) years of experience performing accurate test results and maintenance reports within the last five (5) years preceding the release of this request for proposal. Use the narrative block in the table immediately below to provide a detailed description of specific tasks evidencing test results and maintenance reports.
| Test Results and Maintenance Reports |
| Five (5) Years of Experience |
Ability to perform:
- Oil Testing Please explain your process for oil sample testing and reporting
- Provide a copy of a maintenance report used in a past contract Ref: PWS, paragraphs 3.1 and 3.2, Appendix A Yes or No
Narrative:
Reference #1, Factor 3 At least 3 reference, but up to 5 maximum references for factor 3.
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub (S)? |
FORMCHECKBOX
S
POC Name:
Reference #2, Factor 3
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub (S)? |
FORMCHECKBOX
S
POC Name:
Reference #3, Factor 3
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub (S)? |
FORMCHECKBOX
S
POC Name:
Reference #4, Factor 3
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub (S)? |
FORMCHECKBOX
S
POC Name:
Reference #5, Factor 3
| Contract # |
| Period of Performance |
| Total Value |
| Contract Type |
(Firm Fixed Price [FFP] or Cost)
| Performed By (provide name of company) |
| Performed as Prime (P) or Sub (S)? |
FORMCHECKBOX
S
POC Name:
FOR OFFICIAL USE ONLY (FOUO)
Technical Questionnaire
File details come from the government source that posted it.