Atch2_SOW_Resurface_Court_20171108.pdf
PDF 104 KB Posted
- Attached to
- Resurface Basketball Court
- Solicitation number
- FA4610-18-T-0002
About this file
Atch 2 - SOW Resurface Basketball Court
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contractor_Submitted_Questions.pdf | ||
| Atch3_WD_2015-5647_R3_20170811.pdf | ||
| Atch1_RFQ_Resurface_Court_20171108.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Resurface Basketball Court Floor
Fitness Center, Bldg. 10130 for the Force Support Squadron
8 Nov 2017
1.0 BACKGROUND
Basketball court resurfacing is required to maintain the safety and integrity of the floors.
Maintenance and resurfacing annually ensures our facility will be safe and effective for various intramural/varsity sports leagues, unit PT and numerous other indoor activities. Lastly, annual maintenance and resurfacing provided will further extend the manufacturer’s warranty for an additional year.
2.0 OBJECTIVES
Annual maintenance and resurfacing of the basketball court floor in building 10130, Duane G.
Wolfe Fitness & Sports Center.
3.0 DECRIPTION OF WORK
This project is for the gymnasium court floor in the Duane G. Wolfe Fitness & Sports Center, Building 10130. To prolong the life-span of the court surface it is recommended that maintenance coats are applied annually, especially for the first 5-10 years after installation. Cost should include thoroughly cleaning and abrading the surface, supplies, and applying two (2) coats of premium Bona Sport Poly 350 Low VOC High Solids floor finish (or equivalent).
1. Apply annual maintenance coats of finish to hardwood floor
2. Lightly sand floor using 120 grit abrasive screens.
3. Vacuum floor
4. Tack and clean floor using adhesion promoter.
5. Apply base coat
6. Apply top coat
The court measures 20,000 square feet.
4.0 DESIRED SKILLS AND KNOWLEDGE
Contractor must possess the required knowledge in order to provide professional hardwood floor maintenance and resurfacing.
• Hardware: must know how to operate required tools/machinery to conduct floor maintenance and resurfacing
5.0 DELIVERY TIME FRAME
December 2017 (project should take no longer than one week to complete).
5.1 Government Furnished Items
• N/A
5.2 Government Furnished Equipment
• N/A
5.3 Government Furnished Services
• Utilities. The Government will furnish electricity, water, sewage, heating.
• Refuse Collection. The Government will provide dumpsters for refuse. The Government will provide containers and collection of recycling materials.
• Protection Services. The Government will provide Security Forces and Fire Protection.
• Emergency Medical Services. The Government will provide emergency medical transportation and treatment. Contractor shall pay for all reasonable medical costs incurred.
6.0 POINTS OF CONTACT.
6.1 Customer Representative (CR)
The following person has been designated the CR by the Contracting Officer:
Pamela Coffey Director, Sports and Fitness Force Support Squadron Pamela.coffey.1@us.af.mil, 805-606-6962
6.2 Invoice Reviewer in Wide Area Work Flow
Jim Sorrells, Resource Advisor Force Support Squadron (FSS)/FSR Jim.sorrells@us.af.mil, 805-606-2948 mailto:Pamela.coffey.1@us.af.mil mailto:Jim.sorrells@us.af.mil