This is Amendment 2 to Request for Quote (RFQ) FA460825Q0002 for vehicle barrier maintenance at Barksdale Air Force Base, LA. The amendment provides Q&A responses clarifying that maintenance is required for three GRAB-300 (Ground Retractable Automobile Barrier K12/ASTM M50) barriers located at the Bodcau Gate, North Gate, and West Gate. The barriers were installed between 2007-2013 and include associated controls, traffic lights, and overspeed/wrong-way detection systems.

The Period of Performance for the base year is April 1, 2025 through September 30, 2025. Key requirements include maintenance of electric GRAB Net barriers and all associated controls, signs and signals. While contractor certification from the AVB manufacturer is not required, personnel must meet qualifications outlined in Section 3 of the Performance Work Statement. The amendment includes photos of the barriers at each gate and their control systems, showing yellow retractable barriers with traffic control equipment. The last preventive maintenance was performed on January 18, 2025. Questions regarding the amendment should be directed to Contracting Specialist Quaya Ervin.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA460825Q0002

Amendment 2 - Vehicle Barrier Maintenance

7 February 2025

MEMORANDUM FOR CONTRACTORS

FROM: 2CONS/PKA

801 Kenney Ave, Suite 2300 Barksdale AFB, LA 71110

SUBJECT: Amendment 02, FA460825Q0002, Vehicle Barrier Maintenance

1. The purpose of this Amendment is to:

a. Provide updated supplemental information in the form of a Question and Answers document (See Question 6 & 8).

2. The following questions were submitted to 2 CONS by the Request for Quote (RFQ) question deadline of 12:00 PM CST, 3 Feb 2025:

Question 1: How many barriers are located on Barksdale AFB, LA?

Answer 1: There are a total of three (3) barriers, located at the following gates:

• Bodcau Gate

• North Gate

• West Gate

Question 2: What is the brand name of the barriers?

Answer 2: GRAB – 300 (Ground Retractable Automobile Barrier K12/ASTM M50)

Question 3: Solicitation - FA460825R0001, Page 11, Line Items 001, 002, 003.

Please confirm the Base Year 01 Apr 2025 To 30 Sep 2025 quantities for CLIN 001, 002, and 003.

Answer 3: The Period of Performance (PoP) for the Base Year of FA460825R0001 is as stated: 01 April 2025 through 30 Sep 2025 for CLINS 001,002,003.

Question 4: Attachment 1 - Performance Work Statement, Page 7, Section 1.3.1.6 Paint/Corrosion Control.

Please confirm an equivalent brand preference due to Grip-Tite paint is no longer manufactured.

Answer 4: No specific preference, simply equivalent adhesive paint.

Question 5: Attachment 1 - Performance Work Statement, Page 21, TABLE 1:

CDRLS, Barrier System Controls Schematic-Services.

Please confirm if Schematic-Services CLIN X005 will be a part of this contract and pricing should be forwarded by contractors.

Answer 5: _N/A_

Question 6: Please confirm below is a complete barrier/equipment list that will be included in contract.

• North Gate: 1-quantity Electric GRAB Net installed in 2010 - (Yes)

• West Gate: 1-quantity Electric GRAB Net installed in 2007 - (Yes)

• Bodcau Gate: 1-quantity Electric GRAB Net installed in 2013 - (Yes)

• All associated controls, signs and signals – Yes, including traffic lights

• Refer to Section 1.2 of the Performance Work Statement for a complete Description of Services.

Question 7: What is the date of the last preventive maintenance (PM) service? What type of service was it (monthly, quarterly, semi-annual, annual)? If not an annual PM, when was the last annual PM conducted for scheduling purposes?

Answer 7: 18 January 2025.

Question 8: Is the contractor required to be certified by the AVB manufacturer?

Answer 8: No, contractor is not required to be certified by the AVB manufacturer, however personnel should hold the necessary qualifications as laid out in Section 3.

Contractor Personnel and Qualifications of the Performance Work Statement.

Question 9: Are the Overspeed Wrong-Way Detections to be included as well for each gate?

Answer 9: Yes, (Refer to manual pg 15)

Question 10: Please provide the names of the gates where maintenance is required, how many of the three barriers are at each gate, and which gates have installed the USACE ACP control system to include traffic light sequencing, overspeed and wrong way detection, etc.

Answer 10:

• North Gate: 1- quantity Electric GRAB Net

• West Gate: 1- quantity Electric GRAB Net

• Bodcau Gate: 1-quantity Electric GRAB Net

I am not quite sure about the USACE ACP control system, but all gates have the traffic light sequencing, overspeed and wrong way detection, etc.

Question 11: Will there be any changes in equipment (barriers, control systems, integrated security devices) from the current contract already installed or planned to be installed in the first year of the new contract?

Answer 11: No plans on any changes in equipment from current contract as of right now.

Photos of Vehicle Barriers

Figure 1 West Gate

Figure 2 West Gate

Figure 3 West Gate

Figure 4 West Gate

Figure 5 North Gate

Figure 6 North Gate

Figure 7 Bodcau Gate

Figure 8 Bodcau Gate

Figure 9 Bodcau Gate

Figure 10 Bodcau Gate

3. It is the responsibility of the Offeror to read the entire Performance Work Statement and all accompanying attachments of the RFQ and RFQ Amendment(s) for FA460825Q0002.

4. Please direct any questions regarding this amendment to Contracting Specialist, Quaya Ervin, at ruquayyah.ervin@us.af.mil or at (318) 456-2201.

THOMAS HUTCHINS

Contracting Officer mailto:ruquayyah.ervin@us.af.mil

REQUEST FOR QUOTE – ACKNOWLEDGEMENT

Amendment 02 - FA460825Q0002, Vehicle Barrier Maintenance

I acknowledge and agree to all terms and conditions of this RFQ, Amendment 02.

SIGNATURE COMPANY NAME

PRINTED NAME & TITLE OFFER DATE

All work shall be in strict accordance with the statement of work requirements.

Question 2: What is the brand name of the barriers?
Please confirm the Base Year 01 Apr 2025 To 30 Sep 2025 quantities for CLIN 001,
Please confirm an equivalent brand preference due to Grip-Tite paint is no longer manufactured.
Question 5: Attachment 1 - Performance Work Statement, Page 21, TABLE 1: CDRLS, Barrier System Controls Schematic-Services.
Question 6: Please confirm below is a complete barrier/equipment list that will be included in contract.
Question 7: What is the date of the last preventive maintenance (PM) service? What type of service was it (monthly, quarterly, semi-annual, annual)? If not an annual PM, when was the last annual PM conducted for scheduling purposes?
Question 8: Is the contractor required to be certified by the AVB manufacturer?
Answer 10:
REQUEST FOR QUOTE – ACKNOWLEDGEMENT