About this file
This document is an Amendment 02 to a Request for Quotation (RFQ) issued by the Department of the Air Force 2D Contracting Squadron at Barksdale Air Force Base for the Removal and Replacement of a Lighting System. The solicitation (FA460825QS052) seeks a contractor to replace the existing I-Lumin Model# SC277-24-UN-3P-ML-20 lighting control system, with no specific manufacturer requirement. Key updates include extending the performance period from 10 to 90 days after contract award, pushing the quote submission deadline to 12:00 PM CDT on Friday, 12 September 2025, and providing clarification on equipment specifications through a series of questions and answers. The amendment includes a picture of the current lighting system panel and updates the Statement of Work to reflect the revised timeline for equipment removal and installation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined Synopsis - FA460825QS052 - Amendment 02.pdf | ||
| Attachment 2 - Statement Of Work dated 8 Sept 2025.pdf | ||
| Combined Synopsis - FA460825QS052 - Amendment 01.pdf | ||
| Solicitation FA460825QS052 - Amendment 01.pdf | ||
| Attachment 1 - Provisions and Clauses.pdf | ||
| Attachment 3 - Wage Determination.pdf | ||
| Combined Synopsis - FA460825QS052.pdf | ||
| Attachment 2 - Statement Of Work dated 28 Aug 2025.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
2D CONTRACTING SQUADRON (AFGSC)
BARKSDALE AIR FORCE BASE LOUISIANA
8 September 2025
MEMORANDUM FOR OFFERORS/BIDDERS/VENDORS
FROM: 2d Contracting Squadron/PKA 801 Kenney Avenue, Building 4400 Barksdale Air Force Base, Louisiana 71110
SUBJECT: Amendment 02, Solicitation FA460825QS052, Removal and Replacement of Lighting System
1. The purpose of issuing Amendment 02 to Solicitation FA460825QS052, Removal and Replace of Lighting System; is to provide the government’s answers to the questions received, provide a picture of the image displayed on the current lighting system panel, update Attachment 2, Statement Of Work, 28 Aug 2025 and extend the Request For Quotation due date.
2. The questions and answers are listed below. Please be advised, the government’s answers are in bold text.
Question: Specified equipment / brand: Is there a required manufacturer or model for the replacement lighting control components (master control processor, rack-mounted dimming panel, touchscreen), or will “brand name or equal” be acceptable? If available, please share applicable spec sections or approved-equal guidance.
Answer: There is no specific manufacturer required. This is not a brand name requirement.
Question Performance period: The SOW notes completion within ten (10) days of contract award. Given typical procurement lead times for a 24-circuit, 277 V, 3-phase dimming panel and associated controls, could you confirm whether the 10-day period refers to on-site work after materials are on hand, or whether an alternate period (e.g., X days after NTP or after submittal approval) would be considered? Once brand/specs are confirmed, we will provide firm lead-time estimates.
Answer: As reflected in the updated Statement of Work, dated 8 September 2025: 5.1. Removal of old equipment and installation of new equipment shall be completed within 90 days of contract award.
Question: What is the make and model of the current system?
Answer: I-Lumin Model# SC277-24-UN-3P-ML-20
Question: The statement of work Performance Requirement, item 5.1 calls for the removal of old equipment and installation of new equipment to be completed within 10 days of contract award. We do not believe this is achievable by any contractor. This timeline does not allow any time for system design or for procuring equipment. Can the performance period be extended to at least 90 days?
Answer: As reflected in the updated Statement of Work, dated 8 September 2025: 5.1. Removal of old equipment and installation of new equipment shall be completed within 90 days of contract award.
3. Picture displayed below is on current lighting system and reflects the current number of lights.
Solicitation FA460825QS052, Amendment 02
DEPARTMENT OF THE AIR FORCE
2D CONTRACTING SQUADRON (AFGSC)
BARKSDALE AIR FORCE BASE LOUISIANA
4. Amendment 02 updates the amount of time for the removal of old equipment and installation of new equipment stated in section 5.1 of the Statement of Work. As of the date of this memorandum, removal of old equipment and installation of new equipment shall be completed within 90 days of contract award. Additionally, the Statement of Work, dated 8 September 2025, supersedes all previous versions until otherwise stated.
5. Amendment 02 extends the timeline of quotes due outlined in the “Important Dates and Times” section of the Solicitation FA460825QS052. Quotes are now due no later than 12:00 PM Central Daylight Time (CDT), Friday, 12 September 2025.
6. Any questions pertaining to Amendment 02 to Solicitation FA460825QS052 should be directed to Dana Woodard by telephone, (318) 456-6889, or email, dana.woodard.3@us.af.mil.
TIFFANY M. COLLAZO, GS-12, DAF
Contracting Officer
Solicitation FA460825QS052, Amendment 02 mailto:dana.woodard.3@us.af.mil
| Answer: There is no specific manufacturer required. This is not a brand name requirement. |
| Answer: As reflected in the updated Statement of Work, dated 8 September 2025: 5.1. Removal of old equipment and installation of new equipment shall be completed within 90 days of contract award. |
| Answer: I-Lumin Model# SC277-24-UN-3P-ML-20 |
| Answer: As reflected in the updated Statement of Work, dated 8 September 2025: 5.1. Removal of old equipment and installation of new equipment shall be completed within 90 days of contract award. |