Attachment 4 - Question Answers.pdf
PDF 172 KB Posted
- Attached to
- Paxton Access Control/ Secure Comm Rooms Federal contract opportunity
- Solicitation number
- FA460823QC112
About this file
This document provides answers to vendor questions regarding solicitation number FA460823QC112 from the Department of the Air Force Global Strike Command for Paxton Access Control and secure communication rooms. The solicitation involves installing access control systems and conduit in 19 rooms across unspecified buildings. Approximately half of the existing doors are filled with mortar. Network switches are located in each room. The work requires using EMT conduit and installing 1006C and 7501 electric strikes on four and fifteen doors respectively. The government will escort the contractor and assist with network connections. Billing for delivered equipment separately from installation is allowed if requested in the vendor's quote.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA460823QC112 - Amendment 02.pdf | ||
| Attachment 1 - Statement of Work (Amended).pdf | ||
| FA460823QC112 - Amendment 01.pdf | ||
| Attachment 1 - Statement of Work.pdf | ||
| 23QC112 - SAM Combo Synopsis.pdf | ||
| Attachment 2 - Brand Name Justification.pdf | ||
| Attachment 3 - Site Survey.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
23 August 2023
SUBJECT: FA460823QC112 – Secure Comm Rooms, Amendment 03
1. The purpose of this amendment is to provide answers to the questions submitted by interested vendors. This document will be saved under "Attachment 4 – Question Answers".
Q1: Please identify those buildings within the flight line that will require escort and access? A1:
None of the buildings will require flight line access, however, the vendor will be escorted by 2 CS personnel.
Q2: Are any of the door frames filled with mortar?
A2: Approximately half of the doors are filled with mortar.
Q3: Do the various rooms have a building access node in each room?
A3: I am not sure what is meant by “building access node”. There is a network switch in each of the rooms if that is what is being referenced.
Q4: Must the conduit be EMT or is plastic acceptable?
A4: Must be EMT
Q5: What door strikes are required for each door i.e. type/model #?
A5: To the best of my knowledge, 4 doors require 1006C electric strikes and the other 15 require 7501 electric strikes.
Q6: Will the Government have IT to call out and show which node to plug into?
A6: Yes, they will be escorting the contractor.
Q7. Can we bill for parts when they arrive and are under Government control?
A7: It is possible to separate equipment and delivery/installation into two separate line items if that request is made aware on the submitted quote.
MARCUS A. OLEARNICK, SSgt, USAF Contracting Officer