Solicitation Questions_GOVT Responses.pdf
PDF 363 KB Posted
- Attached to
- Paint 49 TES Hangar, B6413 Federal contract opportunity
- Solicitation number
- FA460822B0007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Attendance Sheet 7.7.2022.pdf | ||
| Solicitation - FA460822B0007.pdf | ||
| Attachment 1 - SOW Paint B6413_49th TES.pdf | ||
| Attachment 2 - Drawings.pdf | ||
| Attachment 6 - LA 20220030 Wage Determination.pdf | ||
| Attachment 7- Financial_Information_Request.pdf | ||
| Attachment 3 - Insurance Form.pdf | ||
| Attachment 4 - Environmental Requirements.pdf | ||
| Attachment 8 -Site Map.pdf | ||
| Solicitation - FA460822B0007.pdf | ||
| Attachment 5 - schedule material submittals.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Maintain Paint for 20th Bomb Squadron Hangar (B6415) & 49 TES Hangar (B6413)
Solicitation Questions
1. Will you be providing specs for the paint?
A. No, a specification was not provided for painting. The SOW does refer to all work should be done in accordance to UFC 1-200-01, IBC, NFPA, and ABA.
2. If not, do you have a preference or a standard?
A. The KTR should follow the recommendation of the MPI Exterior Paint Tables for the substrates to be repainted. Also, the following manufacturers have be used on Barksdale AFB – Sherwin-Williams, Benjamin Moore, PPG, and etc. All paint selections should be submitted for approval prior to painting.
3. Can you please confirm how the areas in the picture are to be prepped?
A. Per the SOW, “All surfaces shall be prepped by thoroughly cleaning (high and/or low pressure washing with WATER ONLY depending on the surface being prepped) and removing all loose paint so that new paint will adequately adhere to the remaining substrate. Loose paint should be removed back to solid material. Edges of the remaining layers do not need to be sanded down to a smooth transition.”
4. On page 53, section 4 that the response shall consist of a paper copy and electronic copy on CD. Can a thumbdrive substitute as the electronic copy?
A. The GOVT cannot use thumb drives on GOVT computers, so an electronic copy on CD will need to be provided.
File details come from the government source that posted it. Updated .