Statement of Work and Specifications Attch 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sign_in_Sheet.pdf | ||
| FA4608-16-R-0001-0001_-_Amendment_1_(1).pdf | ||
| Attachment_9_-_Bid_Schedule.xlsx | XLSX spreadsheet | |
| FA4608-16-R-0001_-_RFP.pdf | ||
| Attachment_3_-_AF66.pdf | ||
| Attachment_4_-_Insurance.pdf | ||
| Attachment_10_Special_Contract_Requirements.pdf | ||
| Attachment_2_-_Environmental_Req'ts_(Oct_14).pdf | ||
| Attachment_8_-_PPQ_Cover_Letter.pdf | ||
| Attachment_5_-_Storm_Water.pdf | ||
| Attachment_7_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_6-Wage_Determination.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4608-16-R-0001
Attachment 1
SECTION 01010
SUMMARY OF WORK AND SPECIFICATIONS
INDEX
1. SCOPE OF WORK
2. WORK COORDINATION
3. UTILITIES
4. GOVERNMENT FURNISHED MATERIALS AND TOOLS
5. PROTECTION OF EXISTING ROADWAYS
6. PORTABLE TOILETS
7. SAFETY REQUIREMENTS
8. STANDARD PRODUCT
9. PHYSICAL DATA
10. EXCAVATION PERMITS
11. BASE REGULATIONS
12. WORK HOURS
13. SECURITY CLEARANCE AND DRIVER TRAINING
14. EQUIPEMENT IDENTIFICATION
15. LAYOUT OF WORK
16. CONCEALED WORK
17. NOTICE OF FINAL INSPECTION
18. WORK DELAY BY GOVERNMENT
19. APPLICABLE PUBLICATIONS
20. SOLID, CONSTRUCTION, DEMOLITION, AND DECONSTRUCTION WASTE
REQUIREMENTS
SECTION 01010
SUMMARY OF WORK
1.1 SCOPE OF WORK: The varieties of work to be expected under this contract are asphalt milling and overlays, concrete crushing, full depth pavement reconstruction by removing and replacing concrete slabs with thicknesses up to 36”, pavement markings to include warning signs(government has the stencils), surface and sub-surface drainage structures, rubber buildup removal off of the runway and other pavement related items as outlined in the estimate sheet(s).
1.2 The Contractor shall maintain overall cleanliness of the site at the end of each work day. This daily cleanup will not relieve the Contractor from responsibility of the final cleanup before acceptance of all work. After completion of all activities, the Contractor shall be required to clean the area being worked on by removing all dirt, trash, and debris resulting from their work and shall restore the area to its original state of cleanliness.
1.3 All concrete removed from the airfield will be stockpiled for crushing purposes to be utilized for base course on future projects. The material shall be crushed to LA
DOTD standards, Section 1003.01, to be used as a class I or II base course.
1.4 Bidder shall not charge any related crushing expenses to BAFB. As a part of the bid submittal, bidder shall provide the percent of the total recycled concrete that will be provided to the Base and bidder shall take ownership of the remaining percentage of recycled concrete to be utilized as Bidder sees fit. The percent of recycled concrete that will be crushed and provided to the Base shall be delivered to a stockpile location on Base designated by the
Project Engineer. The bidder will be provided an area on Base designated by the Base Civil
Engineer to set up a crusher and bidder-owned stockpile for recycled concrete.
1.5 Adequate and proficient supervision shall be provided by the contractor throughout all phases of work.
1.6 The Contractor is responsible for verifying all measurements, quantities, and specific requirements at an on-site visit. If requested, the government and the contractor can measure and figure up quantities and discuss the scope of work together, provided a contracting representative is present.
2. WORK COORDINATION: The Contractor shall be specifically responsible for the coordination and proper relation of work to the site and to the work of all trades. It is recommended that the Offeror visit the site and thoroughly familiarize themselves with all the details of the work and working conditions prior to submitting a proposal. The Contractor shall verify all dimensions in the field and advise the Contracting Officer of any discrepancy before performing any work.
3. UTILITIES: All reasonable required amounts of water and electricity will be made available to the Contractor by the Government from Government-owned and operated water and electrical systems without cost to the Contractor. All temporary lines will be furnished, installed, connected and maintained by the Contractor in a workmanlike manner satisfactory to the
Contracting Officer or his/her representative and shall be removed by the Contractor at his/her expense prior to final acceptance of the construction.
4. GOVERNMENT FURNISHED MATERIALS AND TOOLS: Backfill may be available from borrow locations on the base. No other materials or tools will be furnished by the government for this project.
5. PROTECTION OF EXISTING ROADWAYS: The Contractor shall protect adjacent pavement from damage.
6. PORTABLE TOILETS: The Contractor will be responsible for providing temporary toilet facilities.
7. SAFETY REQUIREMENTS: General Safety: The Contractor is responsible for the erection and maintenance of all safety barricades, and other devices necessary for safe conditions to protect the work, equipment, workmen, public and others IAW OSHA Law. The Contractor shall erect or construct such devices as conditions may require and shall maintain them to provide safe conditions through the construction period and conform to OSHA Regulations and the EM 385-
1-1 Safety and Health Requirements.
8. STANDARD PRODUCT: All products used for repair shall be submitted for approval prior to utilizing.
9. PHYSICAL DATA: Information and data furnished or referred to below are furnished for the
Contractors information. Physical conditions indicated on the drawings and in the specifications are the result of site investigation. However, it is expressly understood that the Government will not be responsible for any interpretation or conclusion drawn by the Contractor.
10. EXCAVATION PERMITS: Prior to any excavation, the Contractor shall be responsible for obtaining an approved Civil Engineer Construction Permit, AF Form 103, authorizing the excavation work and locating utilities lines and/or cables in the areas of excavation. Any damage to utility lines or cables shown on the permit, outside the area covered by the permit, or prior to receipt of the permit, resulting from excavation by the Contractor shall be paid for by the
Contractor. Air Force Form 103 Base Civil Engineering Work Clearance Request will be provided by C.E., The Contractor shall hand carry the form to all the agencies listed on the document for their signatures and direction.
11. BASE REGULATIONS: All activities of the Contractor and his/her employees, and of all subcontractors and their employees while on the base, shall be conducted in strict accordance with all base regulations, including those of the fire marshal.
12. WORK HOURS: Normal work hours at Barksdale AFB are 7:30 a.m. through 4:30 p.m., Monday through Friday. However, due to the nature of this kind of work, the government will allow the contractor to deviate at his discretion the hours in which he works.
13. SECURITY CLEARANCE AND DRIVER TRAINING: All primary contractor personnel shall apply and obtain identification badges. All personnel that will be driving on the airfield shall complete an approximately 2 hour flight line driver training class and subsequently carry a flight line driver’s permit while operating a vehicle on the airfield.
14. EQUIPMENT IDENTIFICATION: All Contractor's machinery, motor vehicles, and mechanized equipment shall have acceptable identification showing the owner's name. This identification shall be posted in a conspicuous location on each piece of equipment.
15. LAYOUT OF WORK: The contractor shall furnish, at his own expense, all survey equipment, stakes, templates, platforms, equipment, tools and materials and labor as may be required in laying out the work from the base lines and bench marks. The Contractor shall be held responsible for the execution of the work to such lines and grades as may be established. It shall be the responsibility of the Contractor at his/her cost to maintain and preserve all survey stakes and other marks established until authorized to remove them. Where established stakes or control points are destroyed through the Contractor's negligence or in the performance of the required work, the Contractor shall reestablish such marks, as applicable, in order to properly lay out the work and to permit checking of the work. Should any discrepancy be discovered between actual measurements which prevents following good practice or the intent of the drawing and specifications, the Contractor shall notify the Contracting Officer and the
Contractor shall not proceed with the work until instructions have been received from him.
16. CONCEALED WORK: All items of work to be concealed shall be Government inspected prior to concealment. The contractor shall notify the Contracting Officer or his/her representative of his/her intention to conceal approximately 24 hours in advance and no item shall be concealed until the Contractor has received approval to do so.
17. NOTICE OF FINAL INSPECTION: The Contractor shall give the Contracting Officer or his/her representative three working days advance notice of the date the work will be ready for final inspection.
18. WORK DELAY BY THE GOVERNMENT: The Contractor may be requested to stop work for up to 20 days with five (5) days to be consecutive due to mission, exercises, or the air show.
The anticipated time frame for this work delay is unknown at this point in time.
19. APPLICABLE PUBLICATIONS: Work shall conform to the most current edition Airfield
Standards for construction.
20. SOLID, CONSTRUCTION, DEMOLITION AND DECONSTRUCTION WASTE
REQUIREMENTS:
a. The Contractor shall comply with, but not limited to: (Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, dated 26 Jan
07; Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic
Performance, dated 7 Oct 09; Office of the Under Secretary of Defense Memo, DoD Integrated
(Non-Hazardous) Solid Waste Management Policy, dated 1 Feb 08, and AFI 32-7042, Waste
Management.
b. The Contractor shall generate the least amount of solid waste as possible, maximize pollution prevention processes, and maximize landfill diversion efforts through source reduction, reuse of materials, and recycling.
c. The Contractor shall only dispose of acceptable municipal solid waste at certified landfills.
d. The Contractor shall not dispose of any hazardous waste, designated waste, radioactive waste, serviceable items, salvageable items, green waste, concrete, or asphalt in municipal solid waste landfills. These shall be properly disposed, diverted, recycled, or reused.
SECTION 01015
ENVIRONMENTAL PROVISIONS
ENVIRONMENTAL REFERENCES
1. ENVIRONMENTAL REFERENCES: The Contractor is responsible for strict adherence to any local, state or Federal environmental regulations relating to this project. 2 CES is the base point of contact for environmental compliance, non-compliance issues and will provide the Contractor a briefing of environmental requirements at the pre-performance conference for this project.
SECTION 02233
AGGREGATE BASE COURSE
1. SCOPE
2. AGGREGATES
3. SAMPLING, QUALITY CONTROL TESTING AND APPROVAL OF MATERIAL
4. EQUIPMENT
5. COMPACTION
1. SCOPE: To provide aggregate base course material under rigid pavement.
2. AGGREGATES: Shall consist of either crushed stone or crushed concrete. The
LADOTD specifications for either crushed stone or crushed concrete shall be followed.
3. SAMPLING, QUALITY CONTROL TESTING, AND APPROVAL OF MATERIAL:
General: Tests, except as otherwise specified herein, shall be performed by the Contractor as a part of his/her quality control program. In addition, upon request by the government, samples shall be obtained for additional testing. Tests shall be performed in accordance with the
American Concrete Institute and ASTM guidelines.
4. EQUIPMENT: All plant equipment that provides either concrete or asphaltic hot mix shall be LADOTD certified.
5. COMPACTION:
A. Subgrade
Subgrade shall be compacted to 95% modified proctor or greater. The engineer has the right to modify the requirements depending on the area(s).
B. Base Course
The base course will be compacted to 95% standard proctor or greater.
The engineer has the right to modify the requirements depending on the area(s).
SECTION 02551
BITUMINOUS PAVING FOR AIRFIELDS
Barksdale does not have any bituminous paving on the runway. It does have it on the shoulders of the taxiways, alert area, and overruns. The type of bituminous paving to be utilized will be the SUPERPAVE hot mix asphaltic pavement that is outlined in the LADOTD Specifications for
Roads and Bridges. PG-76 asphalt will be utilized.
Unless otherwise directed, bituminous courses shall not be constructed when temperature of the surface of the existing pavement or base course is below 40 degrees F.
PROTECTION OF PAVEMENT: After final rolling, no vehicular traffic of any kind shall be permitted on the pavement until the pavement has cooled to 140 degrees F.
COLD MILLING OF BITUMINOUS PAVEMENTS: Standard construction practice of milling bituminous pavements will be utilized.
SECTION 03300
CONCRETE
1. APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
U. S. Army Corps of Engineers Handbook for Cement and Concrete (CRD):
American Concrete Institute (AC) Standards:
211.1-91 Selecting Proportions for Normal, Heavyweight, and Mass Concrete
211.2-91 Selecting Proportions for Structural Lightweight Concrete
301-96 Structural Concrete for Buildings
305R-91 Hot Weather Concreting
American Society for Testing and Materials (ASTM) Publications:
C 31-96a Making and Curing Concrete Test Specimens in the Field
C 33-97 Concrete Aggregates
C 1017-92 Chemical Admixture for Use in Producing Flowing Concrete Calcium
Chloride
E 96-95 Water Vapor Transmission of Materials
National Ready-Mixed Concrete Association (NRMCA) Publications:
Truck Mixer Manufacturers Bureau (TMMB) Publication: Truck Mixer and Agitator
Standards
GENERAL REQUIREMENTS:
Strength Requirements: Concrete slabs on-grade as indicated shall have a 28-day flexural strength of 650 pounds per square inch. Concrete made with high-early strength cement shall have a 7 day strength equal to the specified strength for concrete made with Type I or II portland cement.
Air Entrainment: Air entrainment shall be between 4 to 7 percent total air. Specified air content shall be attained at point of placement into the forms.
Special Properties: Concrete may contain other admixtures, such as water reducers, superplasticizers, or set retarding agents to provide special properties to the concrete, if approved.
Slump: Slump shall be within the limits of 3.5” to 5” for concrete as delivered to the point of placement.
NOTE: Where use of superplasticizers is approved to produce flowing concrete, the above slump requirements do not apply.
SAMPLING AND TESTING is the responsibility of the Contractor and shall be performed by an approved testing agency.
CERTIFICATES: Certified copies of laboratory test reports, including all test data, shall be submitted for concrete tests for review by the engineer.
CURING MATERIALS shall conform to the following:
MEMBRANE-FORMING COMPOUNDS: ASTM C 309, Type 1-D, Class A or B.
PREPARATION OF SURFACES: Surfaces to receive concrete shall be clean and free from frost, ice, mud, and water. Conduit and other similar items shall be in place and clean of any deleterious substance.
PLACING CONCRETE: Concrete shall be placed according to standard construction practices using any of the following methods:
Buckets: Bucket design shall be such that concrete of the required slump can be readily discharged. Bucket gates shall be “grout tight” when closed. The bucket shall provide means for positive regulation of the amount and rate of deposit of concrete in each dumping position.
Belt Conveyors: Belt conveyors may be used when approved. Belt conveyors shall be designed for conveying concrete and shall be operated to assure a uniform flow of concrete to the final place of deposit without segregation or loss of mortar. Conveyors shall be provided with positive means for preventing segregation of the concrete at transfer points and point of placement.
Pumps: Concrete may be conveyed by positive displacement pumps when approved.
Pump shall be the piston or squeeze pressure type. Pipeline shall be steel pipe or heavy duty flexible hose. Inside diameter of the pipe shall be at least three times the maximum size of the coarse aggregate. Distance to be pumped shall not exceed the limits recommended by the pump manufacturer. Concrete shall be supplied to the pump continuously. When pumping is completed, the concrete remaining in the pipeline shall be ejected without contaminating the concrete in place. After each use, the equipment shall be thoroughly cleaned. Flushing water shall be wasted outside the forms.
CONCRETE PLACEMENT: Mixed concrete which is transported in truck mixers or agitators, or concrete which is truck mixed, shall be discharged within 1 ½ hours or before the drum has revolved 300 revolutions, whichever comes first after the introduction of the cement to the aggregates. These limitations may be waived by the Government if the concrete is of such slump after the 1 ½ hour time or 300 revolution limit has been reached that it can be placed, without the addition of water to the batch. When the concrete temperature exceeds 85 degrees F. the time shall be reduced to 45 minutes. Concrete shall be placed within 15 minutes after it has been discharged from the truck.
Consolidation: Immediately after placing, each layer of concrete shall be consolidated by internal vibrators, except for slabs 4 inches or less. The vibrators shall at all times be adequate in effectiveness and number to properly consolidate the concrete. A spare vibrator shall be kept at the job site during all concrete placing operations. The vibrators shall have a frequency of not less than 8000 vibrations per minute, and the head diameter and amplitude shall be appropriate for this concrete mixture being placed. Vibrators shall be inserted vertically at uniform spacing over the area of placement. The distance between insertions shall be approximately 1 1/2 times the radius of action of the vibrator so that the area being vibrated will overlap the adjacent just-vibrated area by a few inches. The vibrator shall penetrate rapidly to the bottom of the layer and at least 6 inches into the preceding layer if there is such. Vibrator shall be held stationary until the concrete is consolidated and then withdrawn slowly. The use of form vibrators must be specifically approved. Vibrators shall not be used to transport concrete within the forms.
Consolidation equipment and procedures shall meet the requirements of ACI 309.
COLD WEATHER REQUIREMENTS: Special protection measures, approved by the
Contracting Officer or his or her representative, shall be used if freezing temperatures are anticipated before the expiration of the specified curing period. The ambient temperature of the air where concrete is to be placed shall be not less than 40 degrees F. The temperature of the concrete when placed shall be not less than 50 degrees F, nor more than 75 degrees F. Heating of the mixing water or aggregates will be required to regulate the concrete placing temperature.
Materials entering the mixer shall be free from ice, snow, or frozen lumps. Salt, chemicals or other materials shall not be incorporated in the concrete to prevent freezing.
CONSTRUCTION JOINTS shall be located as indicated or approved. Where concrete work is interrupted by weather, end of work shift or other similar type of delay, location and type of construction joint shall be directed by the project engineer subject to approval of the Contracting
Officer or his or her representative. Unless otherwise indicated, reinforcing steel shall extend through construction joints.
FINISHING CONCRETE: Finished concrete shall have a medium broomed finish.
CURING AND PROTECTION:
General: All concrete shall be cured by an approved method for the period of time given below:
Concrete with Type I or Type II cement 7 days.
AIRFIELD PAVEMENT MARKINGS
All pavement markings on the airfield will follow ETL 04-2, Airfield Pavement Marking
Schemes.
RUBBER REMOVAL
All rubber removal procedures will be performed according to the Unified Facilities Guide
Specifications, Division 32
Section 32 01 11.51
Rubber and Paint Removal from Airfield pavements
SILICON JOINT SEALANT SPECIFICATIONS WILL FOLLOW ETL 02-8, Silicone Joint
Sealant Specification for Airfield Pavements
Specifications
There will be no specifications provided with this Solicitation/Contract file. Each Delivery Order issued off of the main contract will contain it’s own Statement of Work and Specifications. The Specifications that will be utilized are as follows:
UFC 3-260-02, Unified Facilities Criteria Design Guide for Airfield and Heliport Planning and Design.
ETL 04-2, Standard Airfield Pavement Marking Schemes (UFC 3-260-04)
AFI 32-1042, Standards for Marking Airfields (UFC 3-260-04)
ETL 97-17 Guide Specification , Paint and Rubber Removal from Roadway and Airfield Pavements
2006 Edition of the Louisiana Standard Specifications for Roads and Bridges
*All of the above specifications can be found and/or downloaded from the Internet