FA4608-15-R-0003-03.pdf

PDF 163 KB Posted

Attached to
Repair Airfield, South Apron
Solicitation number
FA4608-15-R-0003
Issued by

About this file

Amendment 3

View the file

Other files

File Type Posted
FA4608-15-R-0003-04.pdf PDF
Attachment_1_-_Revised_1_SOW.doc DOC document
Site_Visit_Sign_in_Sheet.pdf PDF
FA4608-15-R-0003-02.pdf PDF
FA4608-15-R-0003-01.pdf PDF
Attachment_7_-_Insurance.doc DOC document
FA4608-15-R-0003.pdf PDF
Attachment_3_-_Construction_Detail.pdf PDF
Attachment_9_-_Wage_Determination.doc DOC document
Attachment_2_-_Repair_Area.pdf PDF
Attachment_8_-__AFI_32-1001.doc DOC document
Attachment_4_-_Environmental_Reqt's_(Oct_14).pdf PDF
Attachment_5-_BAFBI_33-2.doc DOC document
Attachment_1_-_Revised_SOW.doc DOC document
Synopsis_v2.doc DOC document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AWUB 13-0009

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

A. Delete the second page (Page 2) from Attachment 2, Repair Area. Attachment 2 is now one (1) page.

B. Change the Questions due date in Section L (Instructions to Offerors), From: 20 March 2015 @ 0900 CST To: 26 March 2015 @ 1200

CST. Answ ers w ill be posted by close of business on 27 March.

C. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Mar-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4608-15-R-0003

X 9B. DATED (SEE ITEM 11)

02-Mar-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Mar-2015

CODE

2 CONS/LGC - FA4608

801 KENNEY AVE, STE 2301

BARKSDALE AFB LA 71110-2079

FA4608 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4608-15-R-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Statement of Work 5 03-FEB-2015

Attachment 2 Repair Area 2 07-NOV-2014

Attachment 3 Construction Detail 1 07-NOV-2014

Attachment 4 Enviromental

Requirements

12 01-OCT-2014

Attachment 5 BAFBI 33-2 3 29-JUN-1999

Attachment 6 AF66 2 10-OCT-1989

Attachment 7 Insurance 1 03-FEB-2015

Attachment 8 AFI 32-1001 3 07-MAR-2000

Attachment 9 WD LA150014 4 02-JAN-2015 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Statement of Work 5 03-FEB-2015

Attachment 2 Repair Area 1 07-NOV-2014

Attachment 3 Construction Detail 1 07-NOV-2014

Attachment 4 Enviromental

Requirements

12 01-OCT-2014

Attachment 5 BAFBI 33-2 3 29-JUN-1999

Attachment 6 AF66 2 10-OCT-1989

Attachment 7 Insurance 1 03-FEB-2015

Attachment 8 AFI 32-1001 3 07-MAR-2000

Attachment 9 WD LA150014 4 02-JAN-2015

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

INSTRUCTIONS TO OFFERORS:

Proposals shall be clear, concise, and include sufficient detail for effective evaluation. The proposal should not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume the Government has no prior knowledge of their facilities and experience and will base its evaluation on the information presented in the offeror’s proposal.

1. PRICE PROPOSAL (1 original copy only)

a) Complete the SF 1442, Blocks 14, 15, 17, 19, 20A, 20B, 20C. An official having the authority to bind your company contractually must sign and date the SF 1442 Block 20. One copy of the SF 1442 must bear an original, authorized signature. In doing so, the Offeror accedes to the contract terms and conditions as written in the RFP. All sections of the RFP, excluding Instructions to Offerors and Evaluation Procedures Sections, constitute the model contract.

b) Bid Schedule – Insert proposed lump sum pricing in Section B of the SF 1442. Provide a cost breakdown of this lump sum amount to include at a minimum materials, labor, equipment and any other significant cost items.

c) Acknowledge any and all amendments to the solicitation.

d) Complete the necessary fill-ins and certifications in Sections I and K. Section K shall be returned in its entirety.

NOTE: If offeror is already registered in the System for Award Management (SAM), and information is up to date, there is no need to submit Section K. For Section I, the Offeror shall submit only those pages that require fill-in.

2. TECHNICAL CAPABILITY: (1 copy only; This section is limited to a maximum of 25 pages)

The following information shall be provided and will be evaluated to assess technical acceptability (which includes technical risk) in accordance with Section M, Evaluation Basis for Award. One rating will be assigned to the technical acceptability factor: technically acceptable or unacceptable.

Sub-Factor 1 - Technical Approach: Proposals shall describe the offeror’s proposed approach to performing the requirements set forth in the SOW. Include any unique processes the offeror intends to utilize in the performance of this requirement or cost saving methods to be utilized, if any.

Sub-Factor 2 – Technical risks: Identify risks, if any, associated with the proposed approach and actions to be taken to mitigate those risks.

Sub-Factor 3 - Organizational Structure and Project Management: Offeror must provide an organizational chart identifying key personnel with a description of their work experience relating to projects of similar scope to those expected under this requirement. Additionally, the offeror shall provide a document describing the organization’s program management policies, procedures, and processes. At a minimum, the Offeror shall provide information for the following disciplines:

a. Site Superintendent (minimum of 5 years experience)

b. Quality Assurance Manager/Foreman (minimum of 2 years experience.)

Sub-Factor 4 – Service-Disabled Veteran Owned Small Business: Shall be a Service-Disabled Veteran-Owned

Small Business.

3. GENERAL INFORMATION:

Questions for this project are due on 26 March 2015 at 1200 (12:00 PM) CST. All questions after this time will not be permitted. Answers to the questions will be posted on FBO by close of business on 27 March 2015.

Proposals do not need to be bound or separated by volumes. Proposals can be emailed to michael.madison.2@us.af.mil. They may also be faxed to (318) 456-3294, Attn: Michael Madison. Any mailed proposals should be sent to the below address and be received no later than the date/time specified in the Request for

Proposal.

2d Contracting Squadron

Attn: Michael Madison

801 Kenney Drive

Bldg 4400, Suite 2301

Barksdale AFB, LA 71110

(End of Summary of Changes)

File details come from the government source that posted it. Updated .