This document is a Statement of Work detailing the requirements for providing tents at the Offutt Air Force Base "Defenders of Freedom" Air and Space Show on August 24-25, 2024. The contractor will be required to provide and install several tents, including a 40'x60' command tent, a 40'x75' STEM tent, a 40'x45' Thunderbird tent, and a 30'x45' ADA tent. The tents must be installed by specific dates in August 2024, and the contractor is responsible for all labor and materials, as well as coordinating vehicle access and conducting background checks on employees. The organizer will provide a site map and coordinate delivery and removal times. The related federal contract opportunity is a pre-solicitation for the tent rental services, with specific requirements outlined in the attached Statement of Work.

View the file

Other files

File Type Posted
APF Tents - Statement of Work (Revised).docx DOCX document
Airshow Tent Rental Sources Sought Q and A.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offutt Air Force Base “Defenders of Freedom” Air and Space Show (The Organizer)

1.) Purpose: The purpose of this agreement is to outline the responsibilities and major actions of the open house promoter to provide tents at the Offutt Air Force Base “Defenders of Freedom” Air and Space Show on or about August 24-25, 2024.

2.) General:

A. SCOPE: This agreement provides guidance and documents agreement on aspects for general support of the Offutt Air Force Base “Defenders of Freedom” Air and Space Show. Actions and agreements herein apply only to the participating parties and are not intended to supersede existing regulations or agreements.

B. Requirements:

I. The period of performance is Friday, August 23, 2024 through Sunday August 25, 2024. Labor and materials will be delivered on-site no later than 6:00 PM (CST) on Wednesday, August 21, 2024. Contractor will begin removal of tents no earlier than 6:00 PM Sunday, August 25, 2024.

II. Contractor will be required to submit a timeline that outlines expected delivery, setup, and removal of all tents corresponding with the requirements in Section III below.

III. Contractor will provide all labor and materials required to supply the following tents:

1. One (1) 40’ x 60’ Command Tent: Request clear-span tent with sidewalls. Tent will be installed NLT 6:00 PM (CST) Thursday, August 22, 2024.

2. One (1) 40’ x 75’ STEM Tent: Request clear-span tent with sidewalls. Tent will be installed NLT 6:00 PM (CST) Thursday, August 22, 2024.

3. One (1) 40’ x 45’ Thunderbird Tent: Request clear-span tent with sidewalls.

Tent will be installed NLT 6:00 PM (CST) Friday, August 23, 2024.

4. One (1) 30’ x 45’ ADA Tent: Request frame tent without sidewalls. Tent will be installed NLT 6:00 PM (CST) Friday, August 23, 2024.

5. Tent Ballasts: Contractor will provide weighted ballasts sufficient to maintain the integrity of each tent in an open-air setting per manufacturer specifications.

3.) Responsibilities:

A. The Contractor:

I. Contractor will supply all materials and labor to supply and install tents outlined above to include:

a. Contractor will conduct background checks on all employees designated to support install and removal of tents. Individuals with unfavorable background checks will be restricted from access to the military installation.

i. Foreign nationals must be pre-coordinated through the 55th Wing Installation Protection office.

b. Contractor will ensure tents are properly secured to the ground via weighted ballasts. Drilling into concrete apron is prohibited. Drilling into grass will require a dig permit at Contractors expense along with prior coordination to conduct site survey with 55th Civil Engineering squadron.

c. The following items are prohibited on military installations:

i. Ammunition and Explosives

ii. Fireworks, Firecrackers, Bottle Rockets

iii. Drugs and/or Drug Paraphernalia

iv. Any firearms

v. Any dagger, dirk, switchblade, butterfly knife, stiletto knife, Machete, or any other unusually dangerous instrument capable of inflicting cutting, stabbing, or tearing wounds is prohibited.

vi. Brass or iron knuckles. They are defined as any instrument that consists of finger rings or guards made of a hard substance that is designed, made, or adapted for the purpose of inflicting injury by striking a person.

vii. Items specifically designed or modified as an offensive weapon are prohibited. These include, but are not limited to, modified baseball bats, ax handles, clubs, blackjacks or chains.

viii. Conducted electrical weapons (CEWs) or stun guns, such as Tasers. These items are defined as any item intended to be used as either an offensive or defensive weapon that is capable of temporarily immobilizing a person by the infliction of an electrical charge.

ix. It is prohibited for any person to possess, display, or handle any weapon, to include replicas and realistic looking toy weapons, in a manner that causes public fear, public disorder, or concern for public safety.

x. Coordination of event introductions: WG/CC, anthem singer, team narrators, DV/VIPs, upcoming events sponsorship recognition, activities, entertainment, and concessions.

II. Shall coordinate vehicle access with airshow staff to ensure vehicles meet installation requirements and airfield driving restrictions.

III. The Contractor declares that they will maintain all required licenses and insurance as required to conduct business within the state of Nebraska and as required by federal law for operating on a military installation. Proof of Insurance shall be provided to the Contracting Officer upon award.

B. The Organizer:

I. The Organizer will provide a map of Airshow layout to include tent placement.

II. The Organizer will coordinate delivery and removal times with Contractor to ensure that airfield access is approved during the times requested by the Contractor.