This is a Statement of Need for a generator replacement project at a Department of Defense facility, dated 13 February 2026, with NexGen Work Task #13221841. The project objective is to replace existing EAID generators at Buildings 321 and 324 with new 200kW generators that meet current DoD standards, are EPA compliant, and provide improved efficiency over the aging existing equipment.
The contractor must deliver two (2) Cummins C200D2RE T4F Mobile generators, each with 200 kW standby output and 180 kW prime output at 60Hz, powered by Cummins QSB 6.7L engines. Equipment must include electric brake trailers, fuel tanks, generator set controls, distribution panels, battery chargers, cam lock distribution panels, and auxiliary DEF connections. The contractor shall furnish all labor, tools, materials, and equipment necessary for delivery and functionality verification. All work must comply with International Building Code, Uniform Plumbing Code, National Electrical Code, AFI, UFC, UFGS, ASME, ASTM, ASHRAE, ETL, and NFPA 72 standards. Additional requirements include ISO 9001 quality assurance compliance, coordination with Government for system operations, start-up and operational testing of all units and components, and a minimum one-year warranty covering both equipment and labor. The contractor must maintain a clean and safe work site and complete all work in a neat, substantial, and competent manner.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Need
13 February 2026
Project Title: Replace EAID Generators at Building 321 and 324 NexGen Work Task #: 13221841
1. Objectives:
Replace existing EAID generators with new 200kW generators.
2. Existing Conditions:
Existing generators are at the end of DoD standards for life and need to be replaced with new more efficient and EPA complaint.
3. General Requirements:
Project includes, but is not limited to, the following work elements. The Contractor shall furnish all required services, labor, tools, material, and equipment necessary to deliver equipment and prove functionality as intended. No alterations, additions, or deletions shall be made unless by prior approval of the Contracting Officer (CO). All work will meet the International Building Code, Uniform Plumbing Code, National Electrical Code, AFI, UFC, UFGS, ASME, ASTM, ASHRAE, ETL, NFPA 72 and any other applicable code requirement. The contractor shall maintain the work site in a clean and orderly manner so that the safest possible site is provided for workers and AF members. Work shall be completed in a neat, substantial, and competent manner.
The contractor shall perform quality assurance activities that conform to the quality assurance processes outlined in International Organization of Standards (ISO) 9001, Quality Management Systems. The contractor shall use SOW requirements.
4. Project Requirements
- The contractor shall coordinate with the Government for operation of any system to allow the work.
- The contractor shall deliver equipment as follows:
o Two (2) each, Cummins C200D2RE: T4F Mobile 200 kW standby output/ 180 kW prime output; 60Hz: Cummins QSB 6.7L generators – including electric brake trailer, fuel tank, generator set control, distribution panel, battery charger, cam lock distribution panel, auxiliary DEF connections.
- The contractor shall provide for start-up and operational testing of the units and all new components.
- The contractor shall provide at least a 1-year warranty on equipment and labor.