Contractors Qs an As.pdf
PDF 295 KB Posted
- Attached to
- 400 Ton Portable Chiller Federal contract opportunity
- Solicitation number
- FA460025Q0089
About this file
This document is a Contractor Questions and Answers (Q&A) file for a 400 Ton Chiller procurement. The document details specific technical requirements and clarifications for a portable chiller system, including key specifications such as electrical requirements (maximum MCA of 790A, MOP of 800A), compressor configuration (4 compressors), and control systems. Contractors received clarification on several critical points: the chiller capacity is based on nominal tons, a flow meter is required, and the pump may need to be upgraded from 40HP to 50HP to meet flow and pressure requirements. The Q&A also confirms that chillers with 4 compressors on 2 circuits are acceptable, provided they can be throttled down in 100-ton increments and allow individual compressor isolation. A supervisory controller for the whole portable system is desired, but does not need to integrate with building automation systems. Preference is given to a smaller trailer (48ft) that allows appropriate equipment clearance and maintenance access.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA460025Q00890002 SF 30.pdf | ||
| Solicitation Amendment FA460025Q00890001 SF 30.pdf | ||
| FA460025Q0089 400 Ton Chiller Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
400 Ton Chiller
Contractor Q’s and A’s
1. Can you send pictures of their existing system for reference? A picture has been attached
2. Is the 400T chiller capacity based on nominal sizing or does it need to provide 400 actual tons of cooling? If this is actual tonnage, what water conditions and ambient temperature is this performance based on? Nominal tons
3. The maximum MCA is listed as 790A. Is there any flexibility with this requirement?
No
4. Does the max MCA of 790A and MOP of 800A include the electrical for the pump or is that just for the chiller? Entire system – pump and chiller
5. Project requirements call for 4 compressors on 4 separate circuits. Would it be acceptable to provide a chiller with 4 compressors on 2 circuits? This would also be acceptable, as long as the circuits can still be throttled down 100 tons at a time, such that the portable chiller is capable of running at least in 100 ton increments, and as long as the configuration still allows for isolation of each compressor individually, so that 1 compressor being out of service could still be repaired while the other 3 run.
6. DDC Controls is listed under the accessory equipment section. Is the intent for the contractor to provide a supervisor controller that can communicate with the onboard chiller controller as well as control pumps/valves and read required sensors? Do these controls need specific capabilities to tie into building system building automation systems? Yes – a supervisory controller for the whole portable system is desired – chiller, pumps, any control valves, sensors. But it does not need to be able to tie into building systems.
7. What size trailer would be preferred? (48ft or 53ft) A smaller trailer would always be preferred if possible, as long as the equipment on it has appropriate clearance to work on and remove/replace as needed
8. Portable chillers are typically supplied with flow meters, though this was not specifically called out in the scope. Should we plan to add this to project requirements? A flow meter should be provided as part of the portable chiller system, yes.
9. A 40HP pump is called out, but it can’t achieve 1,200GPM @ 100TDH. Should we adjust to 50HP to meet the requirements? Yes, if an available 40 hp pump cannot meet the flow and pressure requirements, the flow and pressure requirements supercede and the system should increase to a 50 hp pump.
10. Will you accept alternate bids for chillers with 2 circuits (VFDs operated Screws)?
See answer to question 5.