This document contains questions and answers regarding requirements for a climate-controlled storage container solicitation from the Department of the Air Force Air Combat Command. The solicitation seeks an insulated cargo container with a flat roof that meets minimum R-values of R-10 for the floor, R-13 for walls and R-19 for the roof using closed cell spray foam insulation and gypsum wallboard. The container must have a metal door with lever lock and deadbolt, and cargo doors of at least 72 inches wide consisting of either two 36-inch hinged doors or a single 72-inch hinged door. Additional requirements include a 15,000 BTU heating unit installed on the back wall, 2-3 inches of spray foam insulation under the floor, and a minimum 60-amp electrical disconnect capable of 3-phase 208V/60Hz power. The place of performance is Offutt Air Force Base in Nebraska.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 52.212-1.docx | DOCX document | |
| Solicitation Amendment FA460023Q00570001 SF 30.pdf | ||
| Solicitation Amendment - FA460023Q00570001.pdf | ||
| 52.212-1.docx | DOCX document | |
| Solicitation - FA460023Q0057.pdf | ||
| Wage Determinations.pdf | ||
| 52.212-2.1689179177116.docx | DOCX document | |
| GASNT Storage SON.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Would a non-working reefer be an option?
With the insulation already installed it may present difficulty/fire hazards to route electrical though the existing insulation of the reefer.
2. Does an 8x20x8.5 ISO container with cargo doors on one end qualify as a starting base structure?
Yes
3. Is there an R-value required for the floor, walls, and ceiling insulation?
R-values are R-10 for floors, R-13 for walls and R-19 for roofs. Closed Cell Spray Foam insulation, covered with a minimum of ½ GWB.
4. Do the cargo doors need to be covered by the insulation?
Not necessary, as long as the minimum door U-Value is at least .35
5. Is the Place of Performance:
Offutt AFB , NE 68113 (as in Sam's listing) or AFGS DPCC
AF BPN NO MILSBILLS PROCESSES, 245 DAVIS AVE EAST
BARKSDALE AFB, LA 71110-2278?
The Place of Performance is Offutt AFB, NE 68113 The POC will be provided in the award for further details.
6. Roof pitch and type (V-peak, Flat pitch)?
Flat Pitch
7. Type of construction for personal door (wood/metal solid/lock style)?
Metal, Lever handle lock w/deadbolt.
8. Cargo door size (Dimensions)?
At least 72” wide.
9. Is a single cargo door roll-up an option?
No, 2, 36” hinge doors that come together or 1, 72” wide hinge door.
10. Personal door size (Dimensions)?
80”x36”
11. What is the R-factor for ceiling and wall insulation?
See question 3.
12. Where is the HVAC unit to be installed (on the back wall, which side wall)?
Back Wall
13. Does the HVAC unit require heating? If so how much (PTAC unit),(American made)?
Yes, 15K BTU.
14. How thick is the spray insulation to be under the floor?
2-3”
15. “Capable of 3-phase 208V/60Hz with 20A per phase”. Please confirm these specifications accurately align with the requirements.
it’s a minimum 60A disconnect, but a 100A disconnect is acceptable.