AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
a. Incorporate changes to the requirement in response to Questions and Answ ers, see attachment "Q&A".
b. Incorporated concrete information (see attached)
c. Incorporated sealant information (see attached)
d. Updated draw ings in PDF format
e. The bid opening date/time of 18 Sept 2012, 2:00PM remains unchanged.
f. Updated Block 11 of the SF1442, the performance period is "mandatory".
g. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Sep-2012
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4600-12-B-0014
X 9B. DATED (SEE ITEM 11)
17-Aug-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Sep-2012
CODE
55 CONTRACTING SQUADRON
101 WASHINGTON SQ BLDG 40
OFFUTT AFB NE 68113-2107
FA4600 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4600-12-B-0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The performance period code Mandatory has been added.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
CONCRETE INFORMATION
SGBP 12-0092 (Delta 9)
SECTION 03300
Concrete
PART 1 - GENERAL
1.01 SUMMARY
A. This Section specifies concrete, including reinforcing, mix design, placement procedures, and finishes for installing new slab/patch.
1.02 SUBMITTALS
A. Product data for proprietary materials and items.
B. Laboratory test reports for concrete materials and mix design test.
1.03 QUALITY ASSURANCE
A. Codes and Standards: Comply with provisions of the current editions of the following codes, specifications, and standards, except where more stringent requirements are shown or specified:
ACI 318, "Building Code Requirements for Reinforced Concrete."
ACI 301, "Specifications for Structural Concrete for Buildings."
Concrete Reinforcing Steel Institute (CRSI), "Manual of Standard Practice."
B. Concrete Testing Service: Engage a testing laboratory acceptable to Contracting
Officer’s Representative to perform material evaluation tests and to design concrete mixes.
C. Materials and installed work may require testing and retesting at any time during progress of work. Tests shall be done at Contractor's expense.
PART 2 - PRODUCTS
2.01 Reinforcing Materials
A. #4 Reinforcing Bars: ASTM A 615, Grade 60, deformed.
2.02 Concrete Materials
A. Nebraska Dept of Roads PR-1
2.03 Joint Sealer:
A. See specification 7900
2.04 Concrete Mixing
A. Ready-Mix Concrete: Comply with requirements of ASTM C 94, and as specified.
PART 3 - EXECUTION
3.01 Concrete Removal
A. Saw-cut concrete patch area 1” back from patched section within original slab to a depth of 5”. Remove old concrete.
3.01 Placing Reinforcement
A. General: Comply with Concrete Reinforcing Steel Institute's recommended practice for
"Placing Reinforcing Bars," for details and methods of reinforcement placement and supports and as herein specified.
B. Clean reinforcement of loose rust and mill scale, earth, ice, and other materials that reduce or destroy bond with concrete.
C. Provide and install new #4 R-Bar at 6” in both directions at a depth of 2” below top surface. Dowel and epoxy in #4 R-Bar at 12” o.c. along entire perimeter.
3.02 Joints
A. Use bonding agent on existing concrete surfaces that will be joined with fresh concrete.
3.03 CONCRETE PLACEMENT
A. Inspection: Before placing concrete, inspect reinforcing steel in setting such work.
B. General: Comply with ACI 304, "Recommended Practice for Measuring, Mixing, Transporting, and Placing Concrete," and as herein specified.
C. Deposit Nebraska Dept of Roads PR-1 mixture continuously or in layers of such thickness that no concrete will be placed on concrete that has hardened sufficiently to cause the formation of seams or planes of weakness. Deposit concrete to avoid segregation at its final location.
3.04 SLAB FINISHES
A. Trowel to match existing finish. Edge trowel entire perimeter to provide definitive edge between existing concrete and patched area. Grout seal joint and epoxy paint finish to match.
3.05 QUALITY CONTROL TESTING DURING CONSTRUCTION
A. General: The Contractor will employ a testing laboratory to perform tests and to submit test reports. (Not Required)
B. Sampling and testing for quality control during placement of concrete may include the following, as directed by Contracting Officer’s Representative. (Not Required)
C. Sampling Fresh Concrete: ASTM C 172, except modified for slump to comply with
ASTM C 94. (Not Required)
1) Slump: ASTM C 143; one test at point of discharge for each day's pour of each type of concrete; additional tests when concrete consistency seems to have changed.
2) Air Content: ASTM C 173, volumetric method for normal weight concrete; ASTM C
231 pressure method for normal weight concrete; one for each day's pour of each type of air-entrained concrete.
3) Compression Test Specimen: ASTM C 39; one set of 4 standard cylinders for each day's pour, plus additional sets for each 50 cu. yds.; one specimen tested at 7 days, two specimens tested at 28 days, and one specimen retained in reserve for later testing if required.
D. Strength level of concrete will be considered satisfactory if averages of sets of three consecutive strength test results equal or exceed specified compressive strength, and no individual strength test result falls below specified compressive strength by more than
500 psi. (Not Required)
E. Report test results in writing to Contracting Officer’s Representative, Structural
Engineer, Ready-Mix Producer, and Contractor within 24 hours after tests. (Not
Required) F. Additional Tests: Make additional tests of in-place concrete when test results indicate specified strengths and other characteristics have not been attained. Conduct tests by cored cylinders complying with ASTM C 42, or other methods as directed by the
Contracting Officer’s Representative. (Not Required)
END OF SECTION 03300
SEALANT INFORMATION
SGBP 12-0087B (Delta 2)
SGBP 12-0087 (Delta 3)
SGBP 12-0092 (Delta 9)
SECTION 07915
Sealants
PART 1 - GENERAL
1.01 SUMMARY
A. A 100% solids, two-component, semi-rigid polyurea joint filler for concrete floors.
Complies with VOC/VOS Rules and Regulations.
B. Related Sections include the following:
1.02 SUBMITTALS
A. Product Data: Submit manufacturer's product data, including physical properties, chemical resistance, surface preparation and application instructions.
B. Submit manufacturer's standard warranty and applicator's warranty.
1.03 QUALITY ASSURANCE
A. Applicator Qualifications: Manufacturer authorized contractor with written verification.
B. Pre-Application Meeting: Convene a pre-application meeting 2 weeks before the start of application of floor coating system. Require attendance of parties directly affecting work of this section, including the Contractor, Applicator, Manufacturer's Representative, and
Contracting Officer’s Representative. Review the surface preparation, application, cleaning, protection and coordination with other work.
1.04 ENVIRONMENTAL CONDITIONS
A. Sealant shall be applied only within the minimum and maximum temperature recommended by the manufactures.
B. Application practices shall comply with applicable Federal, State and local laws enacted to insure compliance with Federal Clean Air Standards. At the time of application, paint shall show no signs of deterioration.
1.06 DELIVERY, STORAGE, AND HANDLING
A. Delivery: Deliver materials to site in manufacturer's original, unopened containers and packaging, with labels clearly identifying product name and manufacturer.
B. Store materials in accordance with manufacturer's instructions.
1. Store materials in dry, enclosed area with adequate protection from moisture.
2. Keep containers sealed until ready for use.
PART 2 – PRODUCTS
2.01 MATERIALS
A. Polyurea Joint Filler. A two-component polyurea.
Percent Solids; ASTM D2369
i. Part A – 100%
ii. Part B – 100%
B. Volatile Organic Compound (VOC), ASTM D3960
i. <0.0 lb/gal or 0 g/L
C. Tensile Strength
i. 1,183 psi or 8,157 K Pa
2.02 Suggested Manufacturer shall be: Tennant Company, 1-800-553-8033 or approved equal
PART 3 - EXECUTION
3.01 EXAMINATION
Examine area of work to receive joint filler to ensure area of work meets manufacturer’s specifications. Do not begin surface preparation or application until conditions meet manufacturer’s specifications. Application of joint filler will be construed as acceptance of surfaces and conditions.
3.02 PREPARATION
A. Apply joint sealant in accordance with manufacturer's specifications.
3.03 APPLICATION
A. Apply joint sealant in accordance with manufacturer's specifications.
3.04 CLEANING
A. At the end of each work day, remove empty cans, rags, rubbish, and other discarded paint materials from the site.
B. Upon completion of painting, clean paint-spattered surfaces. Remove spattered paint by washing and scraping, using care not to scratch or damage adjacent finished surfaces.
C. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.
3.05 PROTECTION
A. Provide “wet paint” signs to protect newly painted surfaces.
B. Close job site to traffic for a period of 24 hours after application.
END OF SECTION 07915
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been added by full text:
Q&A
Questions and Answers
1. The pinch point hash marks you want installed, do they extend outside beyond the hangar doors or only on the inside of the hangar.
The hash marks extend outside hangar but will not be included. Only the internal lines need to be done (inside of doors).
2. Do you want the joints to be coated over after they are replaced, or install them after the coating is installed and they will be un-coated?
Joints will be coated
3. Will we receive the entire hangar all at the same time?
The whole hangar that is being done will be scheduled for the contractor.
4. Our equipment requires 480 volt, 30 amp, 3 phase power, is that available in the hangars, or do we need to supply our own generator?
There is 480 volt 30 amp 3 phase power available. I am working on the exact location but it is available in the area.
5. Is sales tax to be included in the bid?
All State and Local taxes that you as the contractor will incur should be included in the bid price.
6. Will flight line training/badging be required or will escorts be provided for the construction crew?
The 55th OSS will coordinate escort requirements with the contractor prior to the scheduled start. No additional training required.
Construction crew will receive site specific safety brief on first day at each hangar.
7. In hangar nine: Area two call for a 35-mil system on the print and then under that refers to the first coat as a ¼ in trowel (250-mil). Do you really want a ¼ inch trowel in area two (bay area). In the other hangars there is only a ¼ inch system in the tug areas.
KTR IS CORRECT, ONLY THE TUG AREAS GET THE 1/4"TROWELED ON EPOXY,
ALL AREAS OUTSIDE THE TUG AREA ARE 35 mil.
8. In hangars 3 and 2: The description of the product for the areas surrounding the tug lanes is called out as 1/16 inch (which equals 62.5 mils) in the solicitation. On the prints that same system is 27-mils when the total of the three coats is added up. What is the true thickness you are looking for. The 27 mils would be typical for the system as described.
CORRECTION, ALL AREAS OUTSIDE THE TUG AREA ARE A TOTAL THICKNESS
OF35mil.(SIMILAR TO DELTA 9 )
9. Please verify that all the existing joints will need to be reconstructed to ensure proper placement for a warranty to be granted.
REMOVE AND REPLACE ALL SEALANT FROM EXISTING JOINTS.
PRE-FILL CRACKS, JOINTS AND OTHER IMPERFECTIONS IN AREA OF WORK WITH
JOINT FILL ECO-PJS OR APPROVED EQUIVALENT IN ACCORDANCE WITH
MANUFACTURER’S SPECIFICATIONS.
SEALANT OF JOINTS SHALL BE IN ACCORDANCE WITH SECTION 07915 AND
MANUFACTURER’S SPECIFICATIONS
ATTACHMENT: SPECIFICATION 07915 SEALANTS,(DELTA 2,3, AND 9)
10. Will the drawings be revised to show actual measurements and square footage for each hanger? NO, SGBP 12 0087B(DELTA 2), SGBP 12 0087 (DELTA 3) BOTH INDICATE ON THE
DRAWINGS THAT KTR TO FIELD VERIFY SQUARE FOOTAGE AND SIGNAGE
REQUIREMENT.
SGBP 12 0092 (DELTA 9) SOW INDICATES KTR TO VERIFY QUANTITIES AND
SQUARE FOOTAGE.
(End of Summary of Changes)