Wage Determination.pdf

PDF 110 KB Posted

Attached to
Construction of RV Lot
Solicitation number
FA4600-11-B-0008
Issued by

About this file

This is the wage determination for the RV lot.

View the file

Other files

File Type Posted
Atch 7 Bidders Checklist.doc DOC document
solicitationrvlot16Jun.pdf PDF
drawings.pdf PDF
Atch 6 Financial Institution Reference Sheet.doc DOC document
RV Lot SOW Apr 11.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: NE100010 05/20/2011 NE10

Superseded General Decision Number: NE20080010

State: Nebraska

Construction Type: Building

County: Sarpy County in Nebraska.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 03/12/2010

1 06/25/2010

2 07/23/2010

3 08/13/2010

4 10/08/2010

5 10/29/2010

6 11/12/2010

7 11/19/2010

8 01/07/2011

9 01/21/2011

10 04/22/2011

11 05/20/2011

ASBE0039-002 06/27/2010

Rates Fringes

Insulator/asbestos worker

Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems..........$ 29.41 11.76

FOOTNOTE:

Work performed from a boatswain chair, staging, or scaffolding suspended from a permanent structure, more than thirty (30) feet above the floor or the ground: $1.00 per hour additional.

BRNE0001-001 06/01/2010

BRICKLAYER.......................$ 27.07 11.58

FOOTNOTE: Work on smoke stacks, chimneys and silos 50 ft.

and higher: $2.00 per hour additional, to be paid from the footing.

CARP0444-008 06/01/2009

CARPENTER (does not include concrete form work or overhead doors)..................$ 23.41 9.25

CARP1463-001 06/01/2010

MILLWRIGHT.......................$ 26.05 10.57

ELEC0022-011 06/01/2010

ELECTRICIAN (includes low voltage wiring for fire alarm systems; does not include

HVAC control wiring).............$ 30.80 12.65

* ELEC0022-012 11/28/2010

Electricians: (Sound and voice transmission, transference systems;

television and video systems;

security stystems;

communication systems that transmit or receive information and/or control systems; energy management systems; and fire alarm systems (does not include raceway systems) (excluding cable tray for the purpose of the above listed systems;

Also, chases and/or nipples

(not to exceed 10ft.) may be installed on open wiring systems); Note: Fire alarm systems when installed in raceways in any new or remodel project when other building trades are present shall be the work of the inside electrician) (does not include HVAC control wiring))....$ 21.50 9.14

ELEV0028-001 01/01/2010

ELEVATOR MECHANIC................$ 36.46 20.035+a+b

FOOTNOTE:

a. Vacation Pay: 8% with 5 or more years of service, 6% for 6 months to 5 years service.

b. Paid Holidays: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, Friday after

Thanksgiving, and Christmas Day.

ENGI0571-004 10/01/2010

Power equipment operators:

Group 1.....................$ 17.55 9.04

Group 2.....................$ 20.99 9.04

Group 3.....................$ 23.84 9.04

Group 4.....................$ 26.16 9.04

Group 4A....................$ 27.95 9.04

Group 1: Machine oiler, Rubber tired tractor

Group 2: Trenchers, Forklifts, Hydro-Hammer, Spread oiler, Trailer or skid mounted concrete pumps

Group 3: One & two drum hoist, Tuggers, all backhoes, Dozers

Group 4: Cranes, Concrete pump with swing boom, Mechanic

Group 4A: CCO Crane

IRON0021-010 06/01/2010

IRONWORKER (includes metal building erection)...............$ 26.50 10.37

PLUM0016-009 06/02/2010

PLUMBER (does not include

HVAC piping).....................$ 33.47 11.15

PLUM0464-007 05/19/2010

Pipefitter/steamfitter

(includes HVAC piping)...........$ 31.11 13.77

ROOF0085-001 04/10/2007

ROOFER, Including Built Up, Composition and Single Ply

Roofs............................$ 20.28 4.72

SFNE0669-001 04/01/2011

SPRINKLER FITTER (FIRE)..........$ 29.91 17.00

SHEE0003-005 07/01/2010

Sheet metal worker (includes

HVAC duct work, and setting the unit; does not include

HVAC piping, HVAC wiring, or metal building erection).........$ 30.25 13.30

SUNE2000-003 09/13/2000

CEMENT MASON/CONCRETE

FINISHER (includes concrete form work and rebar).............$ 13.34 3.98

LABORER: Mason Tender...........$ 11.50 4.10

LABORER..........................$ 10.50

PAINTER (does not include wallpaper hanging)...............$ 12.50

Power Equipment Operator

Loader......................$ 12.43 .04

Sheet metal worker/electrician (HVAC wiring only).....................$ 20.21 6.09

Truck Driver, Tandem Dump........$ 8.00 .03

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .