RECOVERY - SGBP080088 - Repair G-Wing Vav Strat
Solicitation number
FA4600-09-B-0005
Issued by

About this file

Site Visit Minues/Questions Answers

View the file

Other files

File Type Posted
EPS Posting-Additional reporting requirements.doc DOC document
Site Visit sign in sheet.pdf PDF
Amendment 1-Stimulus clauses.doc DOC document
Atch 1 offeror checklist.doc DOC document
29 of 29-29.dwf DWF file
18 of 29-18.dwf DWF file
01 of 29-01.dwf DWF file
28 of 29-28.dwf DWF file
Division 1-General Req.pdf PDF
Divison 23.pdf PDF
03 of 29-03.dwf DWF file
11 of 29-11.dwf DWF file
08 of 29-08.dwf DWF file
12 of 29-12.dwf DWF file
17 of 29-17.dwf DWF file
20 of 29-20.dwf DWF file
25 of 29-25.dwf DWF file
cover-TOC.pdf PDF
Divison 26-Electrical.pdf PDF
26 of 29-26.dwf DWF file
21 of 29-21.dwf DWF file
10 of 29-10.dwf DWF file
SF 1442.doc DOC document
05 of 29-05.dwf DWF file
07 of 29-07.dwf DWF file
02 of 29-02.dwf DWF file
22 of 29-22.dwf DWF file
24 of 29-24.dwf DWF file
Division 7-Thermal and Moisture prot.l.pdf PDF
06 of 29-06.dwf DWF file
27 of 29-27.dwf DWF file
Atch 3-Wage Det.doc DOC document
13 of 29-13.dwf DWF file
23 of 29-23.dwf DWF file
09 of 29-09.dwf DWF file
Atch 2 NCIC Memorandum.doc DOC document
19 of 29-19.dwf DWF file
15 of 29-15.dwf DWF file
04 of 29-04.dwf DWF file
14 of 29-14.dwf DWF file
16 of 29-16.dwf DWF file
Division 22-Mechanical.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

20 April 2009 SUBJECT: Site Visit Minutes

REFERENCE: Repair G-Wing AHU

SOLICITATION: FA4600-09-B-0005

A A site visit was accomplished in connection with this solicitation, FA4600-09-B-0005, Repair G-Wing AHU in STRATCOM, Bldg 500. The site visit was held on 7 April 2009 at 0930. Prior to the site visit conclusion, all prospective bidders were afforded one last and final opportunity to ask questions.

B Below are a list of questions and answers from the prospective bidders, or issues brought up by the Government.

1 The Government stated an entire floor would not be shut down to accomplish the required work. Instead the contractor would need to allow two weeks per mechanical room to accomplish all work within that room.

2 Will only two (2) weeks be allowed per mechanical room? Yes 3 Will temporary cooling or heating be required? Cooling, yes. Figure 5 ton portable units for larger office spaces with necessary flexible hose/ducting and electrical to support, 1 ton units for smaller office spaces 4 Will the office areas be done in phases? if so, how many? Yes. For bidding purposes treat each office as a phase.

5 Will the cubicles and other office equipment stay in place? For bidding purposes they will remain in place.

6 Will the hallways be done during regular working hours or at night? For bidding purposes, night time 7 More than one escort may be needed. will more than one be available? See answer to question 16 below 8 Can the double doors on the basement level at the south dock be used to remove and bring in equipment? Yes 9 Where can dumpsters be located? In the space between G & E-Wings, not blocking access to electrical equipment 10 Will a staging area be available for equipment and materials? See answer to question 19 below 11 Will the existing single wall mechanical room panels be reused or will they need to be double wall insulated panels? Drawings indicate double wall panels and doors 12 Can all work be completed during regular hours? For bidding purposes yes. World events may dictate something different once under construction, but that will have to be addressed at that time.

13 How long can each floor be without its AHU? For bidding purposes, 2 weeks

14 Who is providing temporary heating and cooling? Contractor

15 Will we have the entire floor to do our work? If not how many phases will be required? - Entire floor will NOT be available. Phasing will have to be coordinated with the users. For bidding purposes plan on building out each room entirely, only after the mechanical rooms are completed

16 How many escorts will be available? Unknown. Escorts will have to be coordinated with the users. Escorting is the users responsibility

17 How many different points of contacts will we have? 1 per floor? 1 POC per floor minimum. CE has no control over who the POCs are or if they change.

18 Can we use the exterior louvers to bring equipment in and out? Yes. Security measures will have to be taken so that uncontrolled access to the space is not possible.

19 Will we have any kind of staging area available? STRATCOM will determine staging area. Area will probably not be large enough to stage more than 2 weeks worth of supplies

20 Can we set a storage container outside near G wing? Possibly - STRATCOM will have the final answer on this

21 Can copper Press-fit fittings be used in lieu of copper sweat fittings? Yes 22 Will the users move their desks and furniture to allow for construction work? No, I doubt the users will move their desks.