cover-TOC.pdf

PDF 75 KB Posted

Attached to
RECOVERY - SGBP080088 - Repair G-Wing Vav Strat
Solicitation number
FA4600-09-B-0005
Issued by

About this file

Attachment 4-Specifications

View the file

Other files

File Type Posted
EPS Posting-Additional reporting requirements.doc DOC document
Site Visit sign in sheet.pdf PDF
Site visit minutes.doc DOC document
Amendment 1-Stimulus clauses.doc DOC document
Atch 1 offeror checklist.doc DOC document
29 of 29-29.dwf DWF file
18 of 29-18.dwf DWF file
01 of 29-01.dwf DWF file
28 of 29-28.dwf DWF file
Division 1-General Req.pdf PDF
Divison 23.pdf PDF
03 of 29-03.dwf DWF file
11 of 29-11.dwf DWF file
08 of 29-08.dwf DWF file
12 of 29-12.dwf DWF file
17 of 29-17.dwf DWF file
20 of 29-20.dwf DWF file
25 of 29-25.dwf DWF file
Divison 26-Electrical.pdf PDF
26 of 29-26.dwf DWF file
21 of 29-21.dwf DWF file
10 of 29-10.dwf DWF file
SF 1442.doc DOC document
05 of 29-05.dwf DWF file
07 of 29-07.dwf DWF file
02 of 29-02.dwf DWF file
22 of 29-22.dwf DWF file
24 of 29-24.dwf DWF file
Division 7-Thermal and Moisture prot.l.pdf PDF
06 of 29-06.dwf DWF file
27 of 29-27.dwf DWF file
Atch 3-Wage Det.doc DOC document
13 of 29-13.dwf DWF file
23 of 29-23.dwf DWF file
09 of 29-09.dwf DWF file
Atch 2 NCIC Memorandum.doc DOC document
19 of 29-19.dwf DWF file
15 of 29-15.dwf DWF file
04 of 29-04.dwf DWF file
14 of 29-14.dwf DWF file
16 of 29-16.dwf DWF file
Division 22-Mechanical.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Farris Engineering/Consulting Engineers

Offutt Air Force Base

(082070)

FINAL DESIGN SPECIFICATIONS

FOR

Repair G-Wing AHUs, STRATCOM, BLDG 500

OFFUTT AIR FORCE BASE

NEBRASKA

SGBP 08-0088

February 24, 2009

TC-1

OFFUTT AIR FORCE BASE

REPAIR G-WING AHUS, STRATCOM, BLDG 500

SGBP 08-0088

TITLE SECTION PAGES

DIVISION 1 – GENERAL REQUIREMENTS

Special Conditions 1A 1-16 Shop Drawings/Submittals 1B 1-4 Environmental General Conditions 1C 1-12

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

Firestopping 07 84 13 1-16

DIVISION 22 – MECHANICAL

Basic Plumbing Materials and Methods 22 05 00 1-9 Plumbing Insulation 22 07 00 1-3 Plumbing Piping and Equipment 22 10 00 1-3

DIVISION 23 – MECHANICAL

Mechanical General Provisions 23 00 00 1-7 Shop Drawings 23 00 10 1-2 Basic HVAC Materials and Methods 23 05 00 1-23 Testing, Adjusting and Balancing 23 05 93 1-4 HVAC Insulation 23 07 00 1-6 Electric Control Systems & Facilities Management Systems 23 09 00 1-46 Sequence of Operation 23 09 93 1-1 HVAC Pumps 23 20 00 1-3 Steam/Hot Water Heat Transfer Package 23 20 11 1-5 Hydronic Piping and Specialties 23 21 13 1-8 Steam and Condensate Piping and Specialties 23 22 13 1-5 Air Distribution 23 30 00 1-11 HVAC Casings 23 31 19 1-5 Sound Attenuators 23 33 00 1-2 Fans 23 34 00 1-4 HVAC Equipment (Coils, Heat Exchangers) 23 82 00 1-5 Humidifiers 23 84 13 1-3

TC-2

DIVISION 26 – ELECTRICAL

General Electrical 26 05 00 1-6 Wires and Cables 26 05 19 1-4 Supporting Devices 26 05 29 1-4 Raceways 26 05 33 1-6 Electrical Boxes and Fittings 26 05 34 1-2 Electrical Identification 26 05 53 1-2 Variable Frequency Drives 26 09 15 1-6 Wiring Devices 26 27 26 1-3 Circuit and Motor Disconnects 26 28 16 1-2 Light Fixtures 26 51 13 1-2

Cover
TOC Final

File details come from the government source that posted it. Updated .