questions and answers.doc
DOC document 28 KB Posted
- Solicitation number
- FA4600-09-B-0002
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001-Postpone bid opening.doc | DOC document | |
| Sheet 05.dwf | DWF file | |
| Sheet 20.dwf | DWF file | |
| Div 22.pdf | ||
| Sheet 19.dwf | DWF file | |
| Div 7-Thermal.pdf | ||
| Sheet 06.dwf | DWF file | |
| SF1442.doc | DOC document | |
| Sheet 02.dwf | DWF file | |
| Sheet 18.dwf | DWF file | |
| Sheet 10.dwf | DWF file | |
| Sheet 03.dwf | DWF file | |
| Div 26.pdf | ||
| Sheet 09.dwf | DWF file | |
| Copy of Atch 2 NCIC Memorandum.doc | DOC document | |
| Sheet 15.dwf | DWF file | |
| Div 23.pdf | ||
| Sheet 11.dwf | DWF file | |
| Div 1-Gen reqmts.pdf | ||
| Sheet 21.dwf | DWF file | |
| Sheet 12.dwf | DWF file | |
| Copy of Atch 1 offeror checklist.doc | DOC document | |
| Sheet 17.dwf | DWF file | |
| cover and TOC.pdf | ||
| Sheet 16.dwf | DWF file | |
| Sheet 07.dwf | DWF file | |
| Sheet 08.dwf | DWF file | |
| Sheet 04.dwf | DWF file | |
| SHEET 01.dwf | DWF file | |
| Sheet 14.dwf | DWF file | |
| Sheet 13.dwf | DWF file |
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
29 May 2009
SUBJECT: Site Visit Minutes
REFERENCE: Repair E-Wing AHU
SOLICITATION: FA4600-09-B-0002
A A site visit was accomplished in connection with this solicitation, FA4600-09-B-0002, Repair E-Wing AHU in STRATCOM, Bldg 500. The site visit was held on 11 May 2009 at 0900. Prior to the site visit conclusion, all prospective bidders were afforded one last and final opportunity to ask questions.
B Below are a list of questions and answers from the prospective bidders, or issues brought up by the Government.
1. Can we work at night in the areas?
-YES-
2. Will the base provide the appropriate amount of escorts and their pay?
-YES-
3. There are some of the areas that have 'metal pan' ceilings. Is it your intent to have someone tear it all down and replace when that area is completely remodeled? --
--Contractor can remove the metal pan ceiling and leave it down except where the fire and ADT sensors are
4. Can the ceiling pads be left out at the end of each shift?
- Yes, but must be stored neatly
5. Who is responsible for covering up work areas and clean up each shift?
-Contractor-
6. Sheets 3 of 21 & 4 of 21, Note 4, Patching walls required by removal of the FCU. Do we just paint behind the removed FCU or do we need to paint the entire wall?
-Paint the area where the fancoil was removed and blend into the existing wall.
7. On walls that have vinly wall covering; do we just piece in new vinly wall covering (color to match as close as possible) or do we need to reapply vinly wall covering on the entire wall?
-Select a vinyl wall covering that matches (or matches close enough, government reserves the right to approve/disapprove selection) and patch in. Paint over it to match color if necessary.
8. Is there asbestos on the duct and piping in the mechanical room?
-None that we are aware of at this time
9. Do we need to work nights in secured areas?
–For bidding purposes estimate ~20% night work will be required.
10. Do ceiling pads need to be reinstalled at the end of each day in secured areas.
-See question 4 for answer
11. 1-E8 is not listed in the event schedule (need to do demo) When does this need to be done?
-1E8 is not occupied with personnel, this area can be used as 'float' work.
12. Room 1E9 is to have the metal pan ceiling left out for future replacement. Are the other offices with metal ceilings being replaced also?
– The Goodwill room (1E11) has a metal pan ceiling that will need to be removed and replaced with a drop ceiling. Install the drop ceiling at the existing height of the metal pan ceiling.
13. Can concrete wall cutting be done at any time?
– Concrete cutting is to be done at night.
14. Will temporary heating or cooling be required?
-Cooling, yes.
15. Who provides this?
-Contractor
16. How much is needed? Tons?
-Minimum of 2 tons in smaller rooms up to 5 tons in larger rooms and adequate flex duct to distribute the airflow