cover and TOC.pdf

PDF 84 KB Posted

Attached to
RECOVERY - SGBP070064 - -Repair Ahu 1096c E-Wing, Strat (500)
Solicitation number
FA4600-09-B-0002
Issued by

About this file

Specifications-Cover page and Table of Contents

View the file

Other files

File Type Posted
questions and answers.doc DOC document
Amendment 0001-Postpone bid opening.doc DOC document
Sheet 05.dwf DWF file
Sheet 20.dwf DWF file
Div 22.pdf PDF
Sheet 19.dwf DWF file
Div 7-Thermal.pdf PDF
Sheet 06.dwf DWF file
SF1442.doc DOC document
Sheet 02.dwf DWF file
Sheet 18.dwf DWF file
Sheet 10.dwf DWF file
Sheet 03.dwf DWF file
Div 26.pdf PDF
Sheet 09.dwf DWF file
Copy of Atch 2 NCIC Memorandum.doc DOC document
Sheet 15.dwf DWF file
Div 23.pdf PDF
Sheet 11.dwf DWF file
Div 1-Gen reqmts.pdf PDF
Sheet 21.dwf DWF file
Sheet 12.dwf DWF file
Copy of Atch 1 offeror checklist.doc DOC document
Sheet 17.dwf DWF file
Sheet 16.dwf DWF file
Sheet 07.dwf DWF file
Sheet 08.dwf DWF file
Sheet 04.dwf DWF file
SHEET 01.dwf DWF file
Sheet 14.dwf DWF file
Sheet 13.dwf DWF file
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE AHU 1096C E-WING BLDG 500

SGBP 07-0064

Final Specifications for

REPLACE AHU 1096C E-WING, BLDG 500

Offutt Air Force Base

Bellevue, Nebraska

Offutt Air Force Base Project No. SGBP 07-0064

MARCH 31, 2009

Prepared By:

Farris Engineering

11239 Chicago Circle

Omaha, Nebraska 68154

FE PROJECT #082069

TC-1 (Repair AHU 1096C E-Wing, B500) (082069)

OFFUTT AIR FORCE BASE

REPAIR AHU 1096C E-WING, B500

SGBP 07-0064

TITLE SECTION PAGES

DIVISION 1 – GENERAL REQUIREMENTS

Performance Period 0A 1-1 Special Conditions 1A 1-16 Shop Drawings/Submittals 1B 1-4 Environmental General Conditions 1C 1-12 Summary of Work 01 10 00 1-6

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

Firestopping 07 84 13 1-16

DIVISION 22 – MECHANICAL

Basic Plumbing Materials and Methods 22 05 00 1-9 Plumbing Insulation 22 07 00 1-3 Plumbing Piping and Equipment 22 10 00 1-3

DIVISION 23 – MECHANICAL

Mechanical General Provisions 23 00 00 1-7 Shop Drawings 23 00 10 1-2 HVAC Air-Distribution System Cleaning 23 01 30 1-4 Basic HVAC Materials and Methods 23 05 00 1-23 Testing, Adjusting and Balancing 23 05 93 1-5 HVAC Insulation 23 07 00 1-6 Electric Control Systems & Facilities Management Systems 23 09 00 1-34 Sequence of Operation 23 09 93 1-1 HVAC Pumps 23 20 00 1-3 Heat Transfer Package 23 20 11 1-6 Hydronic Piping and Specialties 23 21 13 1-8 Steam and Condensate Piping and Specialties 23 22 13 1-5 Air Distribution 23 30 00 1-10 HVAC Casings 23 31 19 1-4 Air Handlers (Factory Built) 23 73 13 1-15 HVAC Equipment (Chilled Beams, Heat Exchangers) 23 82 00 1-4 Humidifiers 23 84 13 1-3

TC-2 (Repair AHU 1096C E-Wing, B500) (082069)

TITLE SECTION PAGES

DIVISION 26 – ELECTRICAL

General Electrical 26 05 00 1-6 Wires and Cables 26 05 19 1-4 Supporting Devices 26 05 29 1-4 Raceways 26 05 33 1-6 Electrical Boxes and Fittings 26 05 34 1-3 Electrical Identification 26 05 53 1-3 Variable Frequency Drives 26 09 15 1-6

Cover
TOC Final

File details come from the government source that posted it. Updated .