Att 1 - Frequency Converter SOW 10 Aug 26.pdf
PDF 118 KB Posted
- Attached to
- Troubleshoot Frequency Converter
- Solicitation number
- FA452826QPKB7
About this file
This is a Statement of Work for troubleshooting and inspection services on a Piller Power Systems Solid State APOJET AJS static frequency converter (serial #9506019540) located at Dock 8, Building 864, Bay 2 at Minot Air Force Base, North Dakota.
The contractor must troubleshoot all faults and error codes on the AJS C8-1R-90-480/200-6/40-G-B frequency converter, which currently displays an Earthing Failure code R0704 and No Load Delay Start code E0957. The converter operates with 480V, 3-phase, 60 Hz input and produces 200/115V, 3-phase, 400 Hz output at 90 kVA. The contractor shall perform exterior housing inspection for deterioration and conduct manufacturer-approved operations testing using appropriate receptacles and cables provided by the Government. All troubleshooting, repairs, and testing must comply with manufacturer specifications. The contractor must document all identified repairs, upgrades, completed work, and applicable warranties. Any repairs outside the contract scope require Contracting Officer coordination and approval; no additional repairs may be performed without a contract modification. Contractor employees must be qualified and possess required experience with the 400 Hz AJS frequency converter model specified.
Work must be scheduled within 30 days of contract award and completed within seven working days from start. The site operates Monday through Friday, 8:00 a.m. to 4:00 p.m., excluding federal holidays. The contractor is responsible for daily worksite cleanup, off-base disposal of waste and unserviceable parts in compliance with Federal, State, local, and base environmental laws, and coordination with the Government point of contact regarding hazardous waste disposal. Personnel require REAL ID-compliant identification, a state-issued ID or U.S. passport, and current automobile insurance and vehicle registration for base access. Contract personnel must be escorted in restricted areas and limited to work-required locations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
DOCK 8 FREQUENCY CONVERTER TROUBLESHOOTING
MINOT AFB, ND
10 August 2026
1.0 DESCRIPTION OF SERVICES. The contractor will provide all management, tools, specialized equipment, supplies, technical data, and labor necessary to troubleshoot and inspect a Piller Power
Systems Solid State APOJET AJS static frequency converter, serial # 9506019540. All work must be in accordance with the manufacturer’s specifications.
2.0. REQUIREMENTS.
2.1. Troubleshoot. The Contractor will troubleshoot all faults and error codes on the AJS C8-1R-90-
480/200-6/40-G-B frequency converter with a 480V, 3 phase, 60 Hz input and a 200/115V 3 phase, 400Hz, and 90 kVA output. The frequency converter is currently showing an Earthing Failure code
R0704 and No Load Delay Start code E0957. Recommended repairs will be presented to the Government for approval before proceeding.
2.2. Inspection and Operations Test. The Contractor will perform an exterior inspection of the housing for any deterioration. Upon completion of inspection, the Contractor will follow the manufacturer’s approved procedures to perform an operations test. The operations test will consist of the testing of the frequency converter on an appropriate receptacle to ensure correct output. In the event further repairs are required, approval shall be coordinated with the Government and contracting officer prior to proceeding.
The Government will provide appropriate receptacle and cables for testing.
2.3. Parts and Repair Documentation. The contractor will provide documentation identifying all required repairs and upgrades as well as any repairs and upgrades completed and applicable warranties provided. Any required repairs that are outside the scope of this contract must be coordinated with the
Contracting Officer. No additional repairs may be completed without a modification to this contract.
3.0. MANAGEMENT.
3.1. Contractor Employees. The contractor employees must be qualified to work on and possess the required experience to work on the 400 Hz AJS C8-1R-90-480/200-6/40-G-B frequency converter listed in this SOW. The contractor shall ensure the work is completed to the manufacturer’s specifications.
3.2. Hours of Work. Normal operating hours of the site are Monday through Friday, 8:00 a.m. to 4:00 p.m., excluding federal holidays.
3.3. Schedule. Work will be scheduled within 30 days of contract award. Work must be completed within seven (7) working days from work start.
3.4. Site Cleanup and Waste Disposal. The contractor will ensure the worksite is cleared of all debris and surplus material at the end of each working day. Equipment and materials required to complete the work effort may remain on site if they are organized/ stored in a manner that does not cause a safety hazard. The contractor will dispose of waste to include unserviceable parts from this project off base and
IAW Federal, State, local, and base environmental laws, and regulations. Disposal of any hazardous waste must be coordinated with the Government POC.
3.5. Installation Access and Security. Work will be performed at Dock 8, Building 864, Bay 2 at Minot
AFB, ND. A current REAL ID-compliant driver’s license, state-issued identification card, or U.S.
passport, and a current automobile insurance document and vehicle registration will be required to a to gain access to Minot AFB. Contract personnel will not enter restricted areas without escort from authorized personnel. The contractor must restrict personnel to only those areas required to perform work.