This document is the Statement of Work (SOW) and associated drawings for the B445 Seed contract under the Simplified Acquisition of Base Engineer Requirement (SABER) Indefinite Delivery, Indefinite Quantity (IDIQ) contract at Minot Air Force Base (MAFB), North Dakota.
The SOW outlines the scope of work for the B445 Seed project, which includes maintenance, repair, alteration, renovation, and new construction work on real property at MAFB. The work may be issued as individual task orders under the SABER IDIQ contract, which has a $9.9 Million ceiling and intends to expedite contract award and execution. The contract is set aside for 100% Small Business participation, with individual task orders ranging from $2,000 to $750,000. The primary goal is to reduce design work and acquisition lead time for the 5th Civil Engineer Squadron. Prompt response and execution of all task orders is required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment - FA452824R00110004.pdf | ||
| Amendment - FA452824R00110003.pdf | ||
| Amendment - FA452824R00110001.pdf | ||
| 24R0011 QnAs.docx | DOCX document | |
| Amendment - FA452824R00110002.pdf | ||
| Attachment 1 SABER SOW Updated.pdf | ||
| 24R0011 QnAs.docx | DOCX document | |
| 24R0011 QnAs.docx | DOCX document | |
| 24R0011 QnAs.docx | DOCX document | |
| Amendment FA452824R00110001 SF 30.pdf | ||
| 24R0011 QnAs.docx | DOCX document | |
| 24R0011 QnAs.docx | DOCX document | |
| 24R0011 QnAs.docx | DOCX document | |
| 24R0011 QnAs.docx | DOCX document | |
| Attachment 7 Price Schedule Coefficients.xlsx | XLSX spreadsheet | |
| Attachment 5 Financial Resp.pdf | ||
| Attachment 1 SABER SoW.pdf | ||
| Attachment 8 Seed Offeror Schedule.xlsx | XLSX spreadsheet | |
| Attachment 2 SABER Master Specs.pdf | ||
| Solicitation - FA452824R0011.pdf | ||
| Attachment 9 B445 Seed SoW and Drawings.pdf | ||
| Attachment 3 WD DBAs.pdf | ||
| Attachment 4 PPIF.pdf | ||
| Attachment 6 Section L and M.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SABER SEED PROJECT, B445 OFFICE RENOVATION
B445
PROJECT: #1140393
MINOT AIR FORCE BASE, NORTH DAKOTA
PREPARED BY:
5 CES; MINOT, NORTH DAKOTA
15 SEP 2023
(15 SEPTEMBER 2023) SABER SEED P A G E 2 | 5
STATEMENT OF WORK
PROJECT GENERAL REQUIREMENT: The Government will provide the Contractor with a 35% design package that includes the following components:
Drawings in AutoCAD 2018 format, drawn to Minot AFB standards.
Statement of Work in Microsoft Word format List of submittals on “AF Form 66.”
CONTRACTOR REQUIREMENTS: The Contractor shall provide the Government with the following items deliverables.
Complete AF Work Permit prior to start of Construction.
Complete AF Form 1354 prior to start of Construction. Update after significant MOD, and at Close-Out.
Edited Version of Statement of Work in Microsoft Word format List project submittals on “AF Form 66.” Update and review at construction meetings, or every two weeks.
Cost Estimate on CostWorks software and Microsoft Adobe.
Construction schedule from Notice to Proceed to Completion, in Microsoft Word, Excel format, or on AF Form.
PROJECT DESCRIPTION: The design shall outline the work to open the office space in room 137 in building B445 ready for use by the government. The design package shall include all work stated below pertaining to building B445, located on Minot Air Force Base, ND:
Period of Performance to be 90 days. (Schedule and sequence work to minimize work area shutdowns.)
Perform the outlined demolition, and the repairs work, as required to facilitate the new work.
Install new lighting fixtures and electrical upgrades.
Install new flooring and wall finishes as outlined in this SOW.
Furniture plan is NOT part of this Contract. It shall be used as a reference for the full extent of this project.
AS-BUILT DRAWINGS: The Government will furnish a 35% design package with record drawings to the Contractor from which the Contractor shall produce As-Builts. Contractor shall verify all dimensions in the AS-BUILT drawings and coordinate the full extent of work required to finalize the design and construction.
DESIGN POLICY AND CRITERIA: The project design will follow the codes and regulations listed below:
International Building Code (IBC) UFC 3-501-01 Electrical Engineering UFC 3-520-01 Interior Electrical Systems UFC 3-530-01, Int./Ext. Lighting & Controls International Plumbing Code (IPC)
International Mechanical Code (IMC) UFC 3-401-01, Mechanical Engineering UFC 3-410-01, HVAC Systems National Electrical Code (NEC)
PROJECT REQUIREMENTS
1. DIVISION 01 – GENERAL REQUIREMENTS
1.1. Contractor shall submit a schedule of work on the form “AF 3064.”
1.1.1. Liquidated damages shall be assessed for work that is not finished within the scheduled performance period.
1.2. Contractor shall perform a pre-work inspection of the work area.
1.2.1. Contractor is responsible for knowing the presence of any Asbestos, Polychlorinated Biphenyls
(PCB), and Lead that will interfere with the work on site.
1.2.1.1. Any effort to abate asbestos, PCB’s, or lead on site must comply with all federal, state and local laws.
1.3. Contractor shall not install any products containing PCB’s.
1.4. Working hours for the Contractor: Monday to Friday, between the hours of 7:30 a.m. and 4:00 p.m
1.5. Work shall be performed to the satisfaction of the CO.
1.6. Contractor shall provide government with a warranty certificate for any products with a warranty of two or more years and a 1-year general warranty.
1.7. Contractor shall provide written notification to the Contracting Officer (CO) two weeks prior to the commencement of work.
(15 SEPTEMBER 2023) SABER SEED P A G E 3 | 5
1.8. Contractor shall maintain a safe work area and shall remove all construction rubble from the work site to a Contract Authorized onsite construction dumpster or remove from Minot AFB on a daily basis.
1.9. SDSs, proposed container sizes and rates of use must be submitted to the 5 CES Environmental Management Office (via the CO) for review and approval at least 15 duty days prior to any materials being brought onto any portion of the installation. The Contractor is required to have and maintain Material Safety Data Sheets (SDSs) on all materials that are used. The Contractor is responsible for training his employees to properly use any authorized hazardous materials and properly handle hazardous wastes. A monthly chemical usage report will be submitted to the CES Environmental Management Office (via the COR) that lists the amount of materials (with associated SDSs) used and locations of usage. After completion of the project, a final total chemical usage report will be submitted to the CES Environmental Management Office (via the COR) that lists the amount of materials (with associated SDSs) used and locations of usage. **Submittal required
1.10. All contractor-generated hazardous waste will be removed from the base the same day it is generated and disposed of off base. The contractor is responsible for all hazardous waste characterization and proper disposal. This shall be done in a manner to conform to the State of ND Health and Sanitation Codes. In no manner will the Government be responsible for disposals. No hazardous waste or excess materials will be left behind on Air Force property after the conclusion of the project.
1.11. Contractor shall be knowledgeable of, and comply with all applicable Federal, State, and local regulations and requirements regarding environmental protection.
1.12. The Contractor is solely responsible for compliance with EM 385-1-1 Safety & Health Requirements Manual and OSHA standards for the protection of their employees. The Contract Manager shall ensure specific safety requirements in Air Force Occupational Safety and Health (AFOSH) standards are complied with by Contractor Personnel when non-compliance would clearly present the potential to harm or damage government resources. The Air Force is not responsible for ensuring that Contractors comply with "personal" safety requirements that do not present the potential to damage government resources.
1.13. Contractor shall complete and follow all instructions on AF Form 103 before start of work on base. A copy of AF Form 103 instruction must be on the premises at all times, while work is being performed.
1.14. When welding, cutting, brazing or use of any open flame device is to be used, an AF Form 592 permit must be obtained from the Base Fire Department (Building 896) prior to beginning such work.
During such work, a fully charged and operable fire extinguisher, appropriate for the task, shall be provided by the Contractor. Contractor shall process form for approval.
1.15. All workers shall wear protective masks while working inside the facility.
2. DIVISION 02 – EXISTING CONDITIONS:
2.1. Demo, Architectural: Demo floor finishes; interior stud-framed wall partitions (excludes insulated perimeter furred wall assembly); suspended acoustical and drywall ceilings; and, other architectural components as required to facilitate finished work. Coordinate with Drawings and this SOW.
2.2. Demo, Electrical: Demo the existing electrical lighting throughout, and the existing power and data distribution as required to facilitate the new plan layout. Coordinate work required with the existing as-builts drawings, this SOW, and new design drawings.
2.3. Demolition, General: Review each SOW Division and the Drawings to identify the full extent of demolition required to facilitate the new construction.
3. DIVISION 06 CARPENTRY:
3.1. Demo existing casework throughout. Coordinate with Drawings.
3.2. Demo wainscot on walls throughout. Coordinate with Drawings and via site visits.
3.3. Demo cubicles and office furniture throughout.
4. DIVISION 09 – FINISHES:
4.1. Demo existing drywall and framing in areas depicted in Drawings. Patch, repair, and/or blend perimeter drywall surfaces as required from demolition activities, and incorporate existing drywall into perimeter wall finishes.
4.2. Flooring: *Submittals Required for all Flooring / Tile / Paint / Ceiling Systems*
4.2.1. Demo flooring throughout in rooms depicted in Drawings and via site visits.
4.2.2. See Room Finish Schedule in this SOW for initial finish material product, and color selection.
4.2.3. Install Carpet and Vinyl Base (VB).
4.3. Paint/Primer:
(15 SEPTEMBER 2023) SABER SEED P A G E 4 | 5
4.3.1. See Room Finish Schedule in this SOW for initial paint color selections.
4.3.2. Primer: Prime all new drywall and repaired drywall areas in preparation for new paint finishes.
Areas with substantial drywall repair, shall require two coats of primer.
4.3.3. Paint, Drywall Surfaces, General: Two Finish Coats; Zero VOC; Semi-Gloss Finish/Sheen.
4.4. Ceiling Grid System/Tile: *Submittals Required for all Flooring / Tile / Paint / Ceiling Systems*
4.4.1. See Room Finish Schedule in this SOW for acoustical tile and/or grid selections.
4.4.2. All existing devises (smoke detectors, diffusers, and other mechanical and electrical ceiling items) are to be reinstalled into the new ceiling system. All ceiling hung devices that shall be salvaged and reinstalled shall be cleaned. Lighting locations govern over other devices.
5. DIVISION 12 – FURNISHINGS:
FINSH SCHEDULE (Flooring, Laminate, Countertops, Wall Tile, Paint, and Ceiling) Finish Schedule - Flooring, Paint, and Ceiling:
(Bids to be based on the below material finish options – or approved equals. Final selections for each are subject to change based on availability, Contractor to provide submission for each option, & CE review.)
Note: All finish schedule items require a submittal. Not all finish materials may be listed below; however, submittals are to be reviewed collectively - as an individual selection is dependent on the other materials.
VB-1: Vinyl Base-1; Johnsonite Wall Base / Tarkett; Color: TBD (Coved); Size: 4” (Typical at carpet)
PT-1: Paint-1: Color: TBD; Finish: Semi-gloss (Field Color)
ACT-1: Acoustical Ceiling Tile-1: Color: White: Edge: Fissured; Size: 24 x24 (x15/16);
Grid: Sized for new ceiling tile; Color: White FLR-1: Carpet Tile: City Walk 2’x2’ Lights Out 03974-36103 or Approved Equal
6. DIVISION 26 –ELECTRICAL
6.1. Demolition:
6.1.1. Demo existing 2’x4’ lighting throughout. Portions of the existing feeders and conduits shall be reused to the extent possible.
6.1.2. Demo existing power distribution conduit and feeders as required to facilitate electrical updates for new office space layout. Reuse to the extent possible.
6.1.3. Demo existing emergency lighting and emergency signs.
6.1.4. Demo any and all unused electrical conduit, electrical wiring, and electrical related hangers.
(Unused conduit located in the existing perimeter furred wall shall remain. Remove wiring.)
6.1.5. Demo existing electrical outlets, lighting sensors, thermostats, and all other devices on the demolished wall. All abandoned and unused material to be removed.
6.2. Lighting:
6.2.1. Install new LED 2’x4’ recessed troffers, per RCP. New LED’s shall be 4000K, 80+ CRI, and produce minimum 40 fc at 3’-0” AFF. Room XXX. (Use Columbia Lighting “TradeSELECT” or Approved Equal) : *Submittals Required*
6.2.2. Install new emergency lighting wall pack units direct wired to the power panel in Rm 137. New emergency lighting units shall be nickel cadmium battery operated. Emergency lighting shall be mounted in ceiling tile. Batteries shall be rated for 90 minutes minimum. Reuse existing conduit and feeders to the power panel to the extent possible.
6.2.3. Lighting motion detector controls, located in the ceiling shall be salvaged and reinstalled. Install new wall mounted light switch and motion sensor combo.
6.3. Power:
6.3.1. All power inside wall cavities of demolished wall shall be removed and all new work shall start at the electrical panel.
6.3.2. Install support hangers for existing EMT and conduit runs that were hidden above the ceiling and ran along the stud framing. All EMT and conduit above the ceiling that remain in use shall remain. Utilize Unistrut’s for horizontal runs of EMT and conduit. Runs shall be securely fastened to the upper roof, secured in intervals of 10’, and 3’ at junction boxes or termination ends. (Install in accordance with NEC 358.30)
6.4. General Requirements:
(15 SEPTEMBER 2023) SABER SEED P A G E 5 | 5
6.4.1. Utilize EMT conduit throughout, size to account for number of feeders, but not less than ¾”.
All conduit, to include those with comm cables, shall follow the 40% fill rule.
6.4.2. Where not possible. Install surface mounted raceways for communication and power (exterior walls).
6.5. Electrical Submittals: Provide submittals for light fixtures, emergency lighting, conduit, motion detectors, receptacle, cover plates, and arc flash analysis.
*Submittals Req’d, Division 26
16. DIVISION 27 – COMMUNICATION:
16.1. Demolition:
16.1.1. Demo existing communication conduit that will not be reused to support the new layout. No reused or new conduit is to be exposed. Existing data wiring can be salvaged for reinstallation if it is CAT6, and can support the new layout. Coordinate with Drawings.
16.2. Data Lines, Conduit: Install conduit in wall cavities and/or in furred wall locations as required to support the data location outlined on Drawings and in this SOW.
- Install (1) data feeds each cubicle. (2) 4-gang LAN drop per 4 cubicles cubicle).
- Install data feeds for wall mounted TV location.
- Install to coordinate other locations and heights as outlined on the Drawings.
16.3. Data Lines, CAT 6: Reinstall salvaged CAT6 data wiring, and install new communication data lines as required to support all noted locations in SOW and on the Drawings.
16.3.1. The office area data jack terminations connections, and labeling, shall be provided Contractor.
16.3.2. The data wire connection end, and labeling, at the rack in Mech Rm, shall be provided by Contractor. Installation and connections to the rack, by Comm Squadron and/or End-User.
16.3.3. Data Line Basis of Design: CAT6 plenum rated cable.
16.3.4. Label each termination point, providing a corresponding number with the distribution rack.
16.3.5. Provide data management cable J-hooks above the ceiling tile. Hooks to be at least
10” above the ceiling, located no more than 42” apart, and size to account for data cables - plus 10%.
16.3.6. Coordinate with 5CES POC/PM and Comm Squadron for approval of communication cable routes and connections to communication switches. (Data lines are installed by Contractor.)
16.3.7. Install LAN drop receptacles and cover plates. Match color of elec receptacles & cover plates.
16.3.8. Data jack termination, connections, and labeling, shall be provided by the Contractor.
6.6.
___________________ END OF SECTION ___________________
00475
00455
00437
00505
00145
00445
00425
00748
00426
00166
00140
00442
00168
00583
00202
00292
00174
00213
00135
00156
00146
00167
00128
00164
00761
00211
00276
00275
00207
00210
00155
00205
00130
00120
00430
00122
00123
00131
00185
00165
00294
00125
00893
00121
00220
00418
00173
00284
00260
00175
00460
00443
00440
01389
01394
00470
00161
00160
00159
00158
00596
01395
01388
01390
01392
01387
01396
01391
01393
00450
01420
01414
01413
01412
01421
01422
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
-9999
01339
01329
05244
01430
05247
05248
05215
05217
05246
01428
05243
05245
00270
05249
01375
01346
01324
01343
01325
01341
01326
01327
01349
01411
01358
01360
01429
01431
01427
00183
01364
01356
01376
01363
01357
01374
01354
01355
01362
00171
05251
05255
05253
05250
01404
01409
05252
00170
00182
00184
00147
00457
00281
01406
01402
01400
01401
01408
01405
01410
01403
01407
00587
00427
00118
00756
00169
00280
00891
00163
00162
S i r o c c o
D r i v e
S u m m i t
D i v e
T a n k e
T a i l
H u y
L a n e
R a l
R a d
F i g h t a d
C h o p p
P t h
T a n g l a d
C h e v
C h a s e
L o c k n e
B o w l i n g
A l e y
S i n g r c l e
H a m p t o p
R o k d g r c l e
R a r c l e
W e d g e w o d r c l e
Office Renovation B445
PROJECT:
#1140393
MINOT AFB, ND
S O
L I C
I T
A T
I O
N
N
O
F I
E
N
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N M
A R
K A
P P
R
D A
T E
F I
U M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
I S
S U
E
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
O
D A
T E
A P
P R
M I N
I
F
R
B
S
E
N O
R T
H
D
A K
O T
A
N A
N A
A N
S I
B
N A
N O
T
T
O
S
C A
L E
O f f i n o
B
C O
V E
R
P
A G
E
L
O C
A T
I O
N
SHEET
IDENTIFICATION
Z W e b b
Z W e b b
SHEET: 1 OF 6
CVR
S e p
AutoCAD SHX Text
CIVIL ENGINEERING (B445)
AutoCAD SHX Text
CONTRACTING (B165)
1a
1)
GENERAL NOTES, DEMOLITION:
2)
3)
4)
KEYNOTES, DEMOLITION:
1b
1a
1b
Therm
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N M
A R
K A
P P
R
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
I S
S U
E
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
D A
T E
A P
P R
M I N
R
S
E
N O
R T
H
D
A K
O T
A
N A
N A
S p
A N
S I
B
N A
S
C A
L E
O f f i c e
R e n o
B
D E
M
A
N
SHEET
IDENTIFICATION
SHEET: 2 OF 6
Z w e b b
Z W e b b
A1.1
AutoCAD SHX Text DEMO EXISTING WALLS WHERE DEPICTED AND AS REQUIRED TO SUPPORT NEW OPEN SPACE. DEMO EXISTING WOOD FRAMING AND DRYWALL EXTENDS TO ROOF DECK. (NON-STRUCTURAL) DEMO EXISTING WOOD FRAMING AND DRYWALL. EXTENDS 4" ABOVE CEILING. EXISTING CONDUITS ABOVE THE CEILING THAT ARE ATTACHED TO THE EXISTING WALL TO BE REMOVED, SHALL REMAIN AND BE PROTECTED THROUGHOUT. (SEE FLOOR PLAN.) DEMO ABANDONED LIGHT FIXTURE ABOVE CEILING GRID. DEMO WOOD PANEL WAINSCOT THROUGHOUT. DEMO ACOUSTICAL CEILING AND GRID SYSTEM. TYPICAL THROUGHOUT. DEMO ELECTRICAL OUTLETS, ELECTRICAL WHIPS AND FEEDS TO CUBICLES, LIGHTING, SENSORS, AND ALL OTHER DEVICES REQUIRED TO FACILITATE WORK. (ALL ABANDON AND UNUSED MATERIAL TO BE REMOVED. NEW WORK SHALL START AT THE ELEC PANELS.) DEMO UPPER AND LOWER CASEWORK THROUGHOUT.
AutoCAD SHX Text COORDINATE THE FULL EXTENT OF WORK WITH DESIGN DRAWING PACKAGE, STATEMENT OF WORK (SOW), AND OTHER RELATED CONTRACTING DOCUMENTS. PLANS & ELEVATIONS PROVIDE THE OVERALL LAYOUT. SEE SOW FOR A DETAILED DESCRIPTION OF THE WORK REQUIRED, OUTLINED BY DISCIPLINE AND/OR LOCATION. MAINTAIN CLEAN CIRCULATION PATHS TO ACCESS/EXIT POINTS THROUGHOUT CONSTRUCTION. ENSURE EXISTING ITEMS AND FINISHES TO REMAIN ARE PROTECTED THROUGHOUT CONSTRUCTION. AFTER COMPLETING OF DEMO, THE FOLLOWING ITEMS SHALL HAVE BEEN REMOVED: 1) ALL INTERIOR STUD FRAMING AND DRYWALL AT LOCATIONS DEPECTITED ONLY, 2) ALL FLOOR AND CEILING FINISHES 3) ALL ELEC CONDUIT & FEEDERS IN DEMOED WALL, BACK TO THE PANELS AS REQ'D TO SUPPORT NEW LAYOUT.
AutoCAD SHX Text
BUILDING 445, DEMOLITION PLAN
SCALE: 1/8" = 1'-0"
1)
GENERAL NOTES, DEMOLITION:
2)
3)
4)
KEYNOTES, DEMOLITION:
Therm
Therm
Therm
POWER & DATA LEGEND:
Therm
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N M
A R
K A
P P
R
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
I S
S U
E
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
D A
T E
A P
P R
M I N
R
S
E
N O
R T
H
D
A K
O T
A
N A
N A
S
A N
S I
B
N A
S
C A
L E
O f f i c e
R e n o
B
D E
M
A
N
SHEET
IDENTIFICATION
SHEET: 2 OF 5
Z w e b b
Z W e b b
A1.2
AutoCAD SHX Text DEMO DATA, ELECTRICAL DUPLEX AND QUADS, LIGHT SWITCHES, THERMOSTATS AND ALL FEEDERS AND CONDUITS IN DEMOLISHED WALL. (NEW LOCATIONS SHALL UTILIZE EXISTING RUNS TO THE EXTENT POSSIBLE. (REFER TO ELECTRICAL PLAN FOR NEW LAYOUT)). CONFIRM REQUIREMENT FOR POWER AND DATA CONNECTIONS TO EITHER A PRE-WIRED CUBICLE PANEL SYSTEM, OR FOR ROUTING THROUGHOUT CUBICLE PANELS VIA WIRE-MOLD, PRIOR TO SUBMISSION OF BID/QUOTE. CONFIRM REQUIREMENT FOR POWER AND DATA CONNECTIONS TO CONFERENCE TABLE PRIOR TO BID/QUOTE SUBMISSION.
AutoCAD SHX Text COORDINATE THE FULL EXTENT OF WORK WITH DESIGN DRAWING PACKAGE, STATEMENT OF WORK (SOW), AND OTHER RELATED CONTRACTING DOCUMENTS. PLANS & ELEVATIONS PROVIDE THE OVERALL LAYOUT. SEE SOW FOR A DETAILED DESCRIPTION OF THE WORK REQUIRED, OUTLINED BY DISCIPLINE AND/OR LOCATION. MAINTAIN CLEAN CIRCULATION PATHS TO ACCESS/EXIT POINTS THROUGHOUT CONSTRUCTION. ENSURE EXISTING ITEMS AND FINISHES TO REMAIN ARE PROTECTED THROUGHOUT CONSTRUCTION. AFTER COMPLETING OF DEMO, THE FOLLOWING ITEMS SHALL HAVE BEEN REMOVED: 1) ALL INTERIOR STUD FRAMING AND DRYWALL AT LOCATIONS DEPECTITED ONLY, 2) ALL FLOOR AND CEILING FINISHES 3) ALL ELEC CONDUIT & FEEDERS IN DEMOED WALL, BACK TO THE PANELS AS REQ'D TO SUPPORT NEW LAYOUT.
AutoCAD SHX Text
BUILDING 445, DATA, ELECTRICAL DEMOLITION PLAN
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text
18" AFF
AutoCAD SHX Text
48" AFF
SINGLE DATA JACK LOCATION W/ (1) CAT-6 FEED TWO DATA JACK LOCATION W/ (2) CAT-6 FEEDS. (DATA TO SHARE SINGLE GANG JUNCTION BOX) DUPLEX (2) POWER LOCATION; SINGLE GANG J-BOX QUAD (4) OUTLET POWER; IN DOUBLE GANG J-BOX LIGHT SWITCH THERMOSTAT
1)
GENERAL NOTES, FLOOR PLAN:
2)
3)
KEYNOTES, FLOOR PLAN:
1 2
Therm
Therm
POWER & DATA LEGEND:
Therm
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N M
A R
K A
P P
R
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
I S
S U
E
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
D A
T E
A P
P R
M I N
R
S
E
N O
R T
H
D
A K
O T
A
N A
N A
S
A N
S I
B
N A
S
C A
L E
O f f i c e
R e n o
B
F L O
A
N
SHEET
IDENTIFICATION
SHEET: 4 OF 6
Z W e b b
Z W e b b
A1.3
AutoCAD SHX Text INSTALL NEW FLOOR, WALL, AND CEILING FINISHES AS REQUIRED IN THE SOW. (PREP SURFACES AS REQUIRED.) INSTALL SUPPORT HANGERS FOR ELECTRICAL CONDUIT ABOVE CEILING WHERE WALLS WERE REMOVED. ALL HORIZONTAL RUNS OF EMT SHALL BE SECURELY FASTENED TO UPPER ROOF, SECURED IN INTERVALS OF 10', AND 3' AT JUNCTION BOXES OR TERMINATION ENDS. (INSTALL IN ACCORDANCE WITH NEC 358.30) INSTALL DATA DROPS, THERMOSTATS, AND LIGHTING SWITCHES AS DEPICTED. UTILIZE EXISTING TO THE EXTENT POSSIBLE TO RECONFIGURE THE PROPOSED LAYOUT. DASHED LINES TO HIGHLIGHT CUBICLE LOCATIONS. POWER AND DATA TO SUPPORT (8) CUBICLE LOCATIONS. SEE STATEMENT OF WORK FOR DATA CABLE CONNECTION AND POWER REQUIREMENTS. THE POWER AND DATA LOCATIONS OUTLINED ARE TO ACCOUNT FOR GENERAL OFFICE FUNCTIONS AND NEEDS. ADDITIONAL POWER AND DATA TO SUPPORT THE BUILDING SYSTEMS, LIGHTS, FIRE ALARMS, HVAC EQUIPMENT, EXIT SIGNS, EMERGENCY LIGHTING, SERVER CABINETS, AND OTHER SIMILAR TYPE ITEMS ARE NOT DEPICTED. COORDINATE FULL REQUIREMENTS WITH STATEMENT AND REQUIREMENTS NOTED BY ALL/OTHER DISCIPLINES.
AutoCAD SHX Text COORDINATE THE FULL EXTENT OF WORK WITH DESIGN DRAWING PACKAGE, BID OPTIONS, STATEMENT OF WORK (SOW), AND OTHER RELATED CONTRACTING DOCUMENTS. WORK IS OCCURRING IN AN OCCUPIED BUILDING. POWER DISRUPTIONS WILL NEED TO BE COORDINATED WEEKS AHEAD OF EXECUTING SHUT-DOWN REQUIRED WORK. PLANS & ELEVATIONS PROVIDE THE OVERALL LAYOUT. SEE SOW FOR DETAILED DESCRIPTION OF WORK REQ'D, OUTLINED BY DISCIPLINE & LOCATION, & BID OPTIONS.
AutoCAD SHX Text
BUILDING 445, FLOOR PLAN
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
SINGLE DATA JACK LOCATION W/ (1) CAT-6 FEED TWO DATA JACK LOCATION W/ (2) CAT-6 FEEDS. (DATA TO SHARE SINGLE GANG JUNCTION BOX) DUPLEX (2) POWER LOCATION; SINGLE GANG J-BOX QUAD (4) OUTLET POWER; IN DOUBLE GANG J-BOX LIGHT SWITCH THERMOSTAT
GENERAL NOTES, REFLECTED CEILING:
KEYNOTES, REFLECTED CEILING PLAN:
1)
2)
3)
4)
5)
6)
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N M
A R
K A
P P
R
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
I S
S U
E
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
D A
T E
A P
P R
M I N
R
S
E
N O
R T
H
D
A K
O T
A
N A
N A
S
A N
S I
B
N A
S
C A
L E
O f f i c e
R e n o
B
R C
P
P
L A
N
SHEET
IDENTIFICATION
SHEET: 5 OF 6
Z W e b b
Z W e b b
A1.4
AutoCAD SHX Text COORDINATE THE FULL EXTENT OF WORK WITH DESIGN DRAWING PACKAGE, BID OPTIONS, STATEMENT OF WORK (SOW), AND OTHER RELATED CONTRACTING DOCUMENTS. SOW INCLUDES SUPPORTING INFORMATION, OUTLINING: CEILING FINISHES; LIGHTING, AND, OTHER BUILDING ACCESSORIES AND REQUIREMENTS. PLANS & ELEVATIONS PROVIDE THE OVERALL LAYOUT. SEE SOW FOR DETAILED DESCRIPTION OF WORK REQ'D, OUTLINED BY DISCIPLINE & LOCATION, & BID OPTIONS. PROVIDE DEMOLITION AS REQUIRED TO SUPPORT ALL FINISH WORK, COORDINATING W/ SOW & ALL DRAWINGS. CEILING TILE/GRID TO BE CENTERED IN RM, UNO. LIGHT LOCATION AS DEPICTED, GOVERNING OVER ALL OTHER CEILING DEVICES AND/OR EQUIPMENT. THEN DIFFUSERS. NOT ALL CEILING MOUNTED DEVICES ARE DEPICTED IN THE CEILING PLAN. COORDINATE ALL SIGNAL, COMM, HVAC, AND ELECTRICAL NEEDS WITH EACH DISCIPLINE. CEILING HEIGHT: 7'9" THROUGHOUT
AutoCAD SHX Text EXISTING CEILING TILE AND LIGHTING TO BE DEMO'D. SPRINKLERS, FIRE ALARMS MOTION SENSORS, DIFFUSERS AND RETURNS, AND ALL OTHER ITEMS WITHIN RCP TO BE SALVAGED FOR REINSTALLATION. INSTALL 2' X 2' SOUND ABSORBENT TILES AND GRID. LIGHTING, DIFFUSERS AND RETURNS SHALL BE OFFSET IN GRID, CENTERING DEVICES IN RM WHILE AVOIDING SMALL PERIMETER PIECES INSTALL 2' X 4' LED LIGHTING OFFSET IN GRID. LIGHT LOCATIONS ARE TO GOVERN CEILING LAYOUT. INSTALL NEW LIGHTING AT THE LOCATION DEPICTED. REINSTALL SMOKE DETECTORS & OTHER CEILING ITEMS. ADJUST LIGHTING & SMOKE DETECTORS IN ROOM AS DEPICTED IN THE CEILING PLAN DRAWINGS. CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND MEASUREMENTS.
AutoCAD SHX Text
BUILDING 445, REFLECTED CEILING PLAN
GENERAL NOTES, FURNITURE PLAN:
KEYNOTES, FUNITURE PLAN:
1)
2)
3)
4)
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D W
N
B
Y
C K
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N M
A R
K A
P P
R
D A
T E
F I
M
B E
R
S I Z
E
S U
B M
I T
T E
D
B
Y
P L O
T
S
C A
L E
I S
S U
E
D
A T
E
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
D A
T E
A P
P R
M I N
R
S
E
N O
R T
H
D
A K
O T
A
N A
N A
S
A N
S I
B
N A
S
C A
L E
O f f i c e
R e n o
B
F U
R N
I T
U R
E
P
L A
N
SHEET
IDENTIFICATION
SHEET: 6 OF 6
Z W e b b
Z W e b b
A1.5
AutoCAD SHX Text COORDINATE THE FULL EXTENT OF WORK WITH DESIGN DRAWING PACKAGE, BID OPTIONS, STATEMENT OF WORK (SOW), AND OTHER RELATED CONTRACTING DOCUMENTS. PLANS & ELEVATIONS PROVIDE THE OVERALL LAYOUT. SEE SOW FOR DETAILED DESCRIPTION OF WORK REQ'D, OUTLINED BY DISCIPLINE & LOCATION, & BID OPTIONS. DIMENSIONS ARE INTENDED TO DEPICTED A LAYOUT FROM FACE OF DRYWALL, UNLESS NOTED OTHERWISE. ALL FURNITURE AND EQUIPMENT IS TO BE PROVIDED BY END-USER. THUS, FURNITURE & EQUIPMENT IS NOT IN CONSTRUCTION CONTRACT. DRAWING PROVIDED FOR PLANNING PURPOSES, TO ASSURE FIT, TO COORDINATE CONNECTIONS AND ROUTING TO CUBICLES AND TO THE CONFERENCE ROOM TABLES.
AutoCAD SHX Text CONFERENCE TABLE: 8' LONG X 42" WIDE: - POWER AND DATA POP-UP IN TOP SURFACE. DATA CONNECTION TO TV/MONITOR DISPLAY ON WALL CUBICLE(S): INTERNAL SIZE, (8) @ 8'-0" X 6'-0" - POWER & DATA FED IN CUBICLE PANELS - LOWER PORTION: FABRIC. UPPER FROSTED GLASS HEADER - L SHAPED DESK SURFACE - FLIPPERS OR SLIDING DOOR OVERHEADS AT NON MONITOR WORK AREA - UNDERNEATH OVERHEADS, LED MOUNTED LIGHTS OFFICE SYSTEM WORK DESK: - L SHAPED (5) @ 5' LONG BY 3' BRIDGE (FOR OFFICES) - L SHAPED (8) @ 8' LONG BY 6' BRIDGE (FOR CUBS) - LOCKING BBF PEDESTAL LOCATED AT EACH ENDS OF CUBICLE ALL DESKS 15" TPY.
AutoCAD SHX Text BUILDING 445, FURNITURE PLAN: (8) WORK STATIONS AND (2) OFFICES (DRAWING PROVIDED FOR REFERENCE, FURNITURE NOT IN CONTRACT)
NEW CAT6 FROM NAE TO COM SWITCH
4090-0163
Drawing Title
James Klein
Johnson Controls, Inc.
2320 North 12th Street Fargo, ND 58102 Phone: (701) 293-1140 Fax: (701) 280-0787
REFERENCE DRAWING
BLDG 445
BLDG-445-2
Project Title
NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
MAFB - 125 Bldg DDC Upgrade
BUILDING 445
CE OFFICE
Panel Location
Panel Location
T
T
NEW
CAT6
FROM
NAE TO
COM
SWITCH
| SoW B445 Seed Project |
| 07_SABER SEED B445 office reno Combined Drawings |
| Cover445_1-Layout1 |
| Sheets and Views |
| Layout1 |
| Floor Plan 445_1_recover-Demo.Plan.A1.1 |
| Sheets and Views |
| Demo.Plan.A1.1 |
| Floor Plan 445_1_recover-Demo Elec 1.2 |
| Sheets and Views |
| Demo Elec 1.2 |
| Floor Plan 445_1_recover-FLR.Plan. A1.3 |
| Sheets and Views |
| FLR.Plan. A1.3 |
| Floor Plan 445_1_recover-RCP.A1.4 |
| Sheets and Views |
| RCP.A1.4 |
| Floor Plan 445_1_recover-Furn1.5 |
| Sheets and Views |
| Furn1.5 |
| Asbuilt 7.pdf |
| Visio-BLDG 445 FP |