- Procure and Install a Pre-Engineered Steel Building for the purpose of cold storage, at Minot AFB, ND
- Solicitation number
- FA452820R0019
About this file
This statement of work outlines requirements for procuring and installing a pre-engineered steel building at Minot Air Force Base in North Dakota. The contractor must design and construct the foundation, superstructure, exterior enclosure, and basic utility connections for an approximately 24,000 square foot building with a 200 by 120 foot footprint. The building must have overhead doors, man doors, interior lighting, and electrical outlets but no other utilities will be connected. The contractor must follow all applicable construction codes and regulations. The work must be completed within the stated performance period and operating hours while coordinating with base personnel and maintaining safety and security protocols. The solicitation number for this opportunity is FA452820R0019 and it was issued by the Department of the Air Force Global Strike Command for cold storage facilities at Minot Air Force Base.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work For:
Construct Pre-Engineered Steel Building
Minot AFB, ND
13/Jul/2020
Contracting Officer
Carlan Taft, 5 CONS/PKA
701-723-7674 carlan.taft@us.af.mil
Contracting Officer Representative
A.J. Rutherford, 5 CES/CEOE
701-723-1310 alexander.rutherford@us.af.mil
SoW, Construct Pre-Engineered Steel Building, Minot AFB, ND i
Contents
1. GENERAL
1.1. BACKGROUND & SCOPE
2. DESCRIPTION OF WORK
2.1. DESIGN
2.2. FOUNDATION
2.3. SUPERSTRUCTURE
2.4. EXTERIOR ENCLOSURE
2.5. SERVICES
2.6. EARTHWORK
2.7. COORDINATION
3. SAFETY
3.1. TECHNICAL AND STATUTORY COMPLIANCE
3.2. PERSONNEL
3.3. PROTECTION OF PROPERTY
3.4. CLEANUP
4. SCHEDULING
4.1. OPERATING TIMES
4.2. FEDERAL HOLIDAYS
4.3. BASE CLOSURES
4.4. START OF WORK
4.5. ACCESS TO SITE
5. SECURITY REQUIREMENTS
5.1. GENERAL
5.2. BASE ACCESS/PASSES
5.3. REAL ID ACT
5.4. SITE ENTRY
6. RECORDS MANAGEMENT
7. SPECIAL INSTRUCTIONS
7.1. PROVISION OF CONTRACTING OFFICER’S AUTHORITY
7.2. TRAFFIC REGULATION
7.3. MANDATORY SEATBELT REQUIREMENT
7.4. FEDERAL, STATE, AND LOCAL COMPLIANCE
7.5. VEHICLE REGISTRATION
7.6. RADAR DETECTORS AND DASH CAMERAS
ii
7.7. DRIVING UNDER SUSPENSION
7.8. PORTABLE DEVICES
7.9. HIRING OF ILLEGAL IMMIGRANTS
7.10. FIRE PREVENTION
7.11. COOPERATION WITH GOVERNMENT PERSONNEL
7.12. TOBACCO USE
8. ATTACHMENTS
1. GENERAL
1.1. BACKGROUND & SCOPE
1.1.1. In order to regain storage footage from a fire that destroyed another building on base, the 5th Civil Engineer squadron requires a pre-engineered steel building (PEB) that will have capabilities of being upgraded into a fully functional building at a later date as funds become available. The requested building will have several services and amenities not installed or constructed.
1.1.2. This project is designed to begin the process of constructing a fully functional facility. The facility itself is broken out into phases. The first phase of the overall project is this project, with the construction of a basic foundation, superstructure, utility connection services, and basic electrical service in the facility. The end result of this project is an approximately 24,000 square foot facility with a footprint approximately 200x120 feet on a single span. The facility has the following critical requirements:
1.1.2.1. The facility requires bay doors at each end of the facility, man doors adjacent to the bay doors, two man doors on the front of the facility (designated east side on attached maps), and man doors on back of facility, all spaced in order to maintain fire escape requirements.
1.1.2.2. Services entrances for all utilities shall be installed in the facility.
1.1.2.3. The facility will be lit and contain electrical for connection to vehicles for winter heating purposes, but no other utilities will be connected in this phase of the project.
1.1.2.4. The minimum snow loading on the facility shall be not less than 40 psf, or snow loading requirements for this region per the International Building Code 2015, whichever is greater.
2. DESCRIPTION OF WORK
2.1. DESIGN
2.1.1. Utilizing attached drawings and drawings provided by the manufacturer of the proposed PEB, provide a design of the building size and location (if different from proposed location), footer, all service entrance/exit locations (electric, water, gas, and sewer), and internal lighting and electrical layout. Provide civil design for interior floor, including 12 inches of base course, and an 8 inch, dowel reinforced slab.
2.1.2. Provide cost for included metal roof from the manufacturer and EPDM roof upgrade.
2.1.3. Provide options for R-20 and R-38 or better roof insulation.
2.1.4. Provide options for 2 inch, and 3 inch sandwich panels and associated R values and costs.
2.1.5. Placement of the facility is preliminary. Adjustments of up to 25 feet from the preliminary placement are authorized to optimize construction.
2.2. FOUNDATION
2.2.1. Excavate and construct standard 4 foot depth footer system, or approved equal that meets the dimensional and other criteria set forth by the proposed PEB. Assume 2,000 psf soil bearing capacity for design purposes. Excavated soil shall be deposited in approved location on base.
2.2.2. Set final height of floor at 1,627 feet.
2.2.3. Insulate footer walls to IBC 2015 standards, assuming facility will be heated at a later date.
2.2.4. Internally, provide 20 inches of base course, compacted in industry standard lift depths that will terminate at the slab elevation. An internal concrete slab will not be poured in this phase of the project.
2.3. SUPERSTRUCTURE
2.3.1. Utilizing plans of the proposed PEB, construct on the footer system. The building itself shall have a floor to eave height of not less than 20 feet.
2.3.2. The roof pitch shall be not less than 1.5”/12”. The roof shall be constructed per the proposed building specifications. Provide an option for an EPDM roof. The roof shall be insulated to not less than R-20 rating.
2.3.3. Provide insulated metal sandwich panel for the exterior walls. Facility color shall be similar in color to Federal Standard 595C, Color #33578, or approved equal. Painting after installation is acceptable.
Provide estimate R Values for 2 inch and 3 inch panels.
2.4. EXTERIOR ENCLOSURE
2.4.1. The facility shall contain two overhead doors with a 30 foot wide x 16 foot height dimensions, or nearest standard size. A man door adjacent to each overhead door shall be included.
2.4.2. Install two man doors on the front of the facility (east- facing wall) and additional man doors on the rear of the facility (west-facing wall) to meet egress distance requirements in compliance with NFPA 101, Life Safety Code 2015 or newer.
2.5. SERVICES
2.5.1. Install Service points for electric, water, sewer, and gas in a best fit location. Except for Electrical, all services will be disconnected at completion of the project. Coordinate with Privatized Utilities Providers (UP), Verendrye Electric Cooperative (VEC), Montana-Dakota Utilities (MDU), and Base Utilities, for best service entrance locations of electric, gas, and water/sewer, respectively. Utilize liberal estimation for size requirements for a building of its size.
2.5.2. Install a Current Transformer for service connection to the facility. Ensure the CT Cabinet is installed at the nearest reasonable location to the service route. Coordinate with VEC during design to ensure best-fit and minimize service connection fee.
2.5.3. Install 240/120 3ph 400A service in facility. Install service panel with enough free slots to utilize typical light industrial 400A load.
2.5.4. Provide interior lighting fixtures for the facility in compliance with UFC 3-530-01, Interior and Exterior Lighting Systems and Controls. Lighting shall be LED with a color approximately 4,000°K.
2.5.5. Provide Lighting at all doors, both man and vehicle. Comply with illumination requirement per UFC 3-530-01. Lighting shall be LED with a color approximately 4,000°K.
2.5.6. Provide regular interval 120V connections throughout building perimeter, spaced every 12 feet.
2.5.7. All services not listed here are not to be included in the project.
2.6. EARTHWORK
2.6.1. Re-compact and groom property around facility to direct rainwater away from the building. Re-seed areas disturbed by construction.
2.6.2. Remove sections of the chain link fence that interferes with the layout of the building and any additional fencing that interferes with construction. Re-install fencing after construction in the affected area is complete.
2.6.3. Clear/Grub grass areas on north and south side of building to 6 inches. Add a layer of geotextile for containment and water drainage, then deposit and compact gravel for vehicle travel.
2.7. COORDINATION
2.7.1. The Contractor shall be responsible for coordinating all phases of their operations with the appropriate base personnel through the Contracting Officer or an authorized representative (hereafter CO). The facility shall remain in operation throughout the Period of Performance. The Contractor shall coordinate around the normal activities of the facility.
3. SAFETY
3.1. TECHNICAL AND STATUTORY COMPLIANCE
3.1.1. The Contractor shall abide by the following regulations and guidelines while constructing this facility:
3.1.1.1. UFC 1-200-01 (2019/10/08) – DoD Building Code
3.1.1.2. UFC 3-101-01 (2019/09/25) – Architecture, with Change 5
3.1.1.3. UFC 3-110-03 (2019/10/29) – Roofing, with Change 4
3.1.1.4. UFC 3-201-01 (2018/04/01) – Civil Engineering, with Change 2
3.1.1.5. UFC 3-210-10 (2020/03/01) – Low Impact Devlopment, with Change 3
3.1.1.6. UFC 3-250-11 (2004/01/16) – Soil Stabilization for Pavements
3.1.1.7. UFC 3-401-01 (2013/07/01) – Mechanical Engineering, with Change 1
3.1.1.8. UFC 3-501-01 (2019/11/01) – Electrical Engineering, with Change 1
3.1.1.9. UFC 3-520-01 (2019/03/20) – Interior Electrical Systems, with Change 1
3.1.1.10. UFC 3-530-01 (2019/11/01) – Interior and Exterior Lighting Systems and Controls, with Change 4
3.1.1.11. UFC 4-010-01 (2018/12/12) – DoD Minimum Antiterrorism Standards for Buildings
3.1.1.12. International Building Code 2015
3.1.1.13. NFPA 70, National Electric Code
3.1.1.14. NFPA 101, Life Safety Code
3.1.1.15. National Electric Safety Code 2017
3.2. PERSONNEL
3.2.1. The Contractor shall strictly adhere to all relevant regulations as stated in 29 CFR 1910, Occupational Health and Safety. The Contractor must have a minimum of two qualified workers. In the event of a problem, either worker must be able to provide assistance to the other. Particular care shall be exercised in connection with operation of vehicles and other equipment on the site, and in transit to and from the site.
3.3. PROTECTION OF PROPERTY
3.3.1. The Contractor shall be responsible to check and determine that all necessary precautions have been taken to protect all property, both Government and private, in all areas where work is being accomplished. Damage caused from failure or neglect of the Contractor to exercise proper precautions in the performance of work shall be immediately repaired to the satisfaction of the CO without cost to the Government.
3.4. CLEANUP
3.4.1. Proper care of materials and waste shall be observed throughout the period of performance. All waste shall be promptly stored in a container suitable for outdoor storage, and all materials not in use shall be stored until needed for installation. Tools and equipment shall remain properly stored unless in use. All waste shall be properly disposed of by the Contractor per local laws and regulations. Any waste scattered by natural or man-made events shall be reclaimed by the Contractor, excepting where the waste moves into an unauthorized area to the Contractor. Upon completion of the work, the Contractor is obliged to perform a final cleanup of any remaining material, tools, equipment, and waste to the satisfaction of the CO. Any cleanup accomplished by the Government due to failure or neglect on the Contractor shall be charged to the Contractor and will be deducted from the final payment of the contract amount.
4. SCHEDULING
4.1. OPERATING TIMES
4.1.1. Working days and hours for the Contractor will normally be from Mondays to Fridays between the hours of 7:30 a.m. to 4:30 p.m. local time, excluding Saturdays, Sundays, and Federal holidays. If the contractor would like to request to work during periods other than above, it must be requested in writing to the CO at least three days in advance. The CO reserves the right to allow or deny work outside the normal hours.
4.2. FEDERAL HOLIDAYS
4.2.1. The following holidays are observed by the Government, and work will not occur on these days without prior approval from the CO.
New Year’s Day – January 1st Martin Luther King Day – 3rd Monday in January Memorial Day – Last Monday in May Independence Day – July 4th Labor Day – 1st Monday in September Columbus Day – Second Monday in October Veteran’s Day – November 11th Thanksgiving Day – 4th Thursday in November Christmas Day – December 25th
4.2.2. If holidays occur on a Saturday, the preceding Friday will be observed. If holidays occur on a Sunday, the following Monday will be observed. If a holiday occurs on a scheduled service day, the contractor will be responsible for rescheduling services for the first day after or before the holiday observance.
4.3. BASE CLOSURES
4.3.1. Scheduled work that cannot progress due to base closure shall resume as soon as possible after re-opening the base. The Period of Performance will be extended by the amount of time lost due to base closure.
4.4. START OF WORK
4.4.1. The Contractor will coordinate the date for actual commencement of work with the, CO, COR, and Engineering Representative after the Entry Access List is approved.
4.5. ACCESS TO SITE
4.5.1. U.S. Air Force personnel control the site and the right-of-way.
4.5.2. Emergency Access: The Contractor shall not block vehicle access to and from the base.
4.5.3. The contractor shall immediately obey any and all orders to vacate the site for any reason.
5. SECURITY REQUIREMENTS
5.1. GENERAL
5.1.1. The contractor is required to comply with all Minot AFB security regulations and directives.
5.2. BASE ACCESS/PASSES
5.2.1. The Contractor shall be responsible for obtaining all necessary passes or other items required for access to the areas in which work will be performed. The Contractor shall request contractor passes through the Contracting Officer by providing the name, social security number, date of birth, work phone, and home phone of employees requiring passes on the contractor’s company letterhead. Pass requests will be forwarded by the Contracting Officer to the 5th Security Forces Squadron Visitor’s Control Center who will conduct the required criminal history background check for each employee. Personnel identified with a felony conviction within the past 10 years, any sex crimes and or homicide will be denied base access. Upon completion or termination of the contract or an individual’s release from employment, the contractor shall retrieve the identification issued above and surrender it to the 5th Security Forces Squadron Pass and ID Section located in the Visitor Control Center.
5.3. REAL ID ACT
5.3.1. Individuals, who do not possess a driver’s license or identification card compliant with the REAL ID Act and do not possess an acceptable alternate identification credential, will be denied access.One form of the following documents will be accepted as proof of identity. The document must be a picture ID and all documents must be unexpired and valid. The goal is to minimize, within acceptable risk, the potential of improper screening and access credential issuance. NOTE: The information in section
3.7.6.1. – 3.7.6.15. is from Handbook for Employers, Instructions for Completing Form I-9 (Employment Eligibility Verification Form), U.S. Department of Homeland Security, U.S. Citizenship and Immigration Services and REAL ID Act of 2005 Implementation: An Interagency Security Committee Guide
5.3.1.1. US Passport
5.3.1.2. Permanent Resident Card/Alien Registration Receipt Card (Form I-551)
5.3.1.3. Foreign passport with a temporary (I-551) stamp or temporary (I-551) printed notation on a machine-readable immigrant visa
5.3.1.4. Employment authorization document that contains a photograph (Form I-766)
5.3.1.5. Driver’s License that is current and meets REAL ID Act it contains a photograph and biographic information such as name, date of birth, gender, height, weight, eye color, and address
5.3.1.6. Identification card issued by Federal, State, or local government agencies, provided it contains a photograph and biographic information such as name, date of birth, gender, height, eye color, and address
5.3.1.7. U.S. Coast Guard Merchant Mariner Cards/Credentials
5.3.1.8. PIV or Federally Issued PIV-1 Cards (Personal Identification Verification) issued by the Federal Government
5.3.1.9. PIV-I card (Personal identification verification-Interoperable Issued by Non-Federal Government entities’
5.3.1.10. DHS “Trusted Traveler Cards” (Global entry, NEXUS, SENTRI, FAST)
5.3.1.11. Merchant Mariner card issued by DHS/ United States Coast Guard (USCG)
5.3.1.12. Border Crossing Card (Form DSP-150)
5.3.1.13. U.S. Certificate of Naturalization or Certificate of Citizenship (Form N-550) and U.S.
Permanent Resident Card (Form I-551)
5.3.1.14. U.S. Refugee travel document or other travel document or evidence of immigration status issued by DHS containing a photograph
5.3.1.15. Foreign Government Issued Passport
5.3.2. Prior to beginning any work in a controlled secure area, the Contractor shall be required to submit a list of employees that includes actual employee identification credentials (i.e. driver’s license information (driver’s license number State of Issue, and name listed on the license exactly as displayed on the license) in order for an EAL letter to be developed to gain access into secure areas. The contractor or the designated representative shall be responsible for pre-announcing workers into controlled/secure areas.
Preannouncement is handled through the controlled area monitor of the owning/using unit. Each person must present their submitted identification matching the EAL.
5.3.3. Occasionally, Government forces will conduct various disaster or contingency exercises. Should the contractor be in an area subject to control, they shall immediately comply with the directions of Minot AFB personnel. This may include cessation of work and immediate departure from the area. The contractor or their representative shall immediately inform the CO and await a clearance to return to the area under work. The contractor may shift workers to other work sites with concurrence of the CO.
Disruption of work schedules shall be at no cost to the Government. These military exercises occur 5-10 times per year
5.4. SITE ENTRY
5.4.1. All work will need to be coordinated with the Security Forces POC to properly coordinate scheduled work times. Contractor shall coordinate with POC to gain access to the site.
6. RECORDS MANAGEMENT
6.1.1. All records, files, documents, regardless of media (e.g., paper, electronic, etc.), that are the responsibility of the contractor are the property of the Government and shall remain so upon termination or completion of the contract. The contractor shall keep these items current and maintain and dispose of them in accordance with the requirements established in Air Force Instruction (AFI) 33-322, Records Management Program, and the Air Force Records Disposition Schedule which can be provided by the records management POC upon request. Records shall be turned over to the Government upon completion of the contract unless otherwise stated. All records are subject to the Freedom of Information and Privacy Act. The Minot AFB Records Management Office (5 CS/SCXR), 723-7542/2084, will provide assistance and training to the contractor to ensure compliance with Federal record keeping requirements.
7. SPECIAL INSTRUCTIONS
7.1. PROVISION OF CONTRACTING OFFICER’S AUTHORITY
7.1.1. No person other than the CO shall have the authority to modify the terms of this contract. In the event the contractor, or any subcontractor, effects any change to the terms and conditions of this contract at the direction of any person other than the CO, the change will be considered to have been made without authority, and no increase in cost or price will be made to the contract amount.
7.2. TRAFFIC REGULATION
7.2.1. The contractor will abide by all traffic regulations outlined in the Air Force Regulation 31-204, for Minot AFB, as supplemented. Copies of these regulations and supplements are available for review at Base Pass and Registration, 15 Missile Avenue or Base Security Police Office, 547 Tanker Trail. Changes will be furnished to the contractor prior to enforcement.
7.3. MANDATORY SEATBELT REQUIREMENT
7.3.1. The use of seatbelts by all vehicle operators and passengers is mandatory on Minot AFB, ND, to include the operation of vehicles on Minot AFB Missile Sites. Violations can result in the temporary or complete loss of the violators on base driving privileges.
7.4. FEDERAL, STATE, AND LOCAL COMPLIANCE
7.4.1. In addition to base ordinance, law, and policy, the contractor shall comply with all applicable federal, state, and local statutes, ordinances, laws, and regulations at all times while on Minot AFB.
7.5. VEHICLE REGISTRATION
7.5.1. All contractor vehicles must be permanently or temporarily registered with the State of North Dakota Motor Vehicle Department, per applicable State Law. Details concerning a non-resident permit will be provided at the pre-performance conference.
7.6. RADAR DETECTORS AND DASH CAMERAS
7.6.1. Radar detectors and dashboard mounted video systems must be turned off while on the base.
7.7. DRIVING UNDER SUSPENSION
7.7.1. The contractor is responsible for ensuring all drivers under their employ have valid driver’s licenses by the issuing state. Any person caught driving under suspension will be escorted off the base and barred from returning.
7.8. PORTABLE DEVICES
7.8.1. It is illegal to use hand-held phones, GPS, or other portable devices while driving on Minot AFB.
Use of devices while parked is acceptable. Anyone caught using a portable device while driving will be escorted off base and barred from returning.
7.9. HIRING OF ILLEGAL IMMIGRANTS
7.9.1. It is prohibited to hire illegal immigrants. All undocumented workers will not be permitted access to Minot AFB, ND. Violation of this policy will result in corrective action, up to and including termination of the contract.
7.10. FIRE PREVENTION
7.10.1. The Contractor shall ensure that all contract employees know how to report a fire. Contractor personnel shall observe all requirements for handling and storage of combustible supplies, materials, waste, and trash. Contractor employees operating critical equipment shall be trained to properly respond during a fire alarm or fire. Welding shall not be accomplished without prior coordination and approval of the Base Fire Department.
7.11. COOPERATION WITH GOVERNMENT PERSONNEL
7.11.1. The contractor must always obey federal Equal Employment Opportunity directives. The Air Force, and all other government entities, maintain a zero-tolerance policy toward anyone in violation of those directives, as well as harassing government personnel, or fellow co-worker by using profanities or other offensive language during meetings, phone calls, working on Federal facilities, or through any other electronic media. Harassment of any person based on race, color, sex (including pregnancy, sexual orientation, transgender status or identity, sex stereotyping, and sexual harassment), religion, national origin, age, disability, or any other category protected by law or policy will not be tolerated. Harassment by anyone, including harassment by any manager, supervisor, work leader, co-worker, or contractor is strictly prohibited. This requirement is a material part of the contract, and will form a significant part of the performance evaluation conducted by the Contracting Officer during and after the contract period of performance. Failure to comply is grounds for removal from any government or military installation in addition to termination for cause /default.
7.12. TOBACCO USE
7.12.1. (AFI 40-102 – 26 MAR 2012) Tobacco use is prohibited on Air Force installations except in Designated Tobacco Areas (DTAs). Tobacco use includes: cigarettes, cigars, and electronic cigarettes, stem pipes, water pipes, hookahs, and smokeless products that are chewed, dipped, or sniffed. Following contract award, the Designated Tobacco Areas will be identified to the contractor.
7.12.2. Designated Tobacco Areas shall be marked with signs: “Designated Tobacco Area.” Designated Tobacco Areas: Shall be away from common points of facility entry/egress, and not in front of buildings or air intake ducts. The distance from the building shall not be less than 50 feet. DTAs shall be a minimum of 50 feet from pedestrian walkways, to include parking lots. DTAs shall be a minimum of 100 feet from playgrounds. Tobacco use is prohibited in Air Force vehicles.
Medical Treatment Facility campuses shall be tobacco free. Medical Treatment Facility campuses are defined as the contiguous area surrounding the clinic or hospital, to include parking structures and lots;
and other outdoor areas contiguous with the Medical Treatment Facility.
8. ATTACHMENTS
1. Minot AFB CE PEB Building Location
2. PEB Preliminary Sighting
3. PEB Basic Dimensions
4. PEB Topographical Map
5. Composite Map of Utility Systems
6. Legend of Utility Systems
Minot AFB CE PEB Building Location
Construction
Siting
5 CES PEB Sighting
AutoCAD SHX Text Building Siting
AutoCAD SHX Text Compacted Gravel
AutoCAD SHX Text Peacekeeper Pl.
AutoCAD SHX Text Bldg 445 5 CES
AutoCAD SHX Text Fence Line Demo
AutoCAD SHX Text Compacted Gravel
24'x40' @60° Parking Space
5 CES PEB Dimensions
Notes:
- Dimensions are for planning purposes only.
- Units converted from metric to English.
- Units are in feet.
AutoCAD SHX Text Peacekeeper Pl.
Bldg 445 5 CES
5 CES Pre-Engineered Steel Building Topographical Siting
AutoCAD SHX Text 1625.66
AutoCAD SHX Text 1627.3
AutoCAD SHX Text 1627.3
AutoCAD SHX Text
AutoCAD SHX Text Building Siting
AutoCAD SHX Text Peacekeeper Pl.
Bldg 445 5 CES ùù
445445
Chopper Path
Pe ace kee per
Pl ace
Document Path: S:\MAPS\Tab Maps\G - Utility Systems\MXDs\FOUO\resourcedG-11 Composite B size mapbook.mxd G-11 Composite Utility System Constraints Ü1 inch = 100 feet
1 inch = 30 meters
1:12000 100 20050 Feet 0 30 6015 Meters Page 232 of 354 Date: 7/13/2020
88888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888888# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *# *%,%,%,%,%,"S"S"S"S"S"S"S"S"S"S"S"S"S"S"S!?!?!?!?!?!?!?!?!?!?!?!?!?!?!?!?!?!?!?!?!?!?!?!?!?!?!?¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬GFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGFGF"6"6"6"6"6"6"6"6"6#0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0# 0ùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù
Legend ù WaterDistribution ControlValve
# 0 WaterDistribution CurbStopValve
"6 WaterDistribution Facility
GF WaterDistribution Fitting
¬ WaterDistribution Hydrant
!? WaterDistribution Manhole
"S WaterDistribution NetworkStructure
%, WaterDistribution ServiceConnection
# * WaterDistribution SystemValve
8 WaterDistribution TestStation
WaterDistribution LateralLine
WaterDistribution Main
GF Wastewater Fitting
$1 Wastewater CleanOut ù Wastewater ControlValve
#* Wastewater DischargePoint
C Wastewater Inlet
!? Wastewater Manhole
"S Wastewater Network Structure
# * Wastewater System Valve
Wastewater Gravity Main
Wastewater Pressurized Main
Wastewater Lateral Line é Storm Pump
!? Storm Manhole
C Storm Inlet
#* Storm Discharge ù Storm Control Valve
QJVFGIO_310.dStorageReservoir_P
Storm Open Drainage
Storm Line Gravity
Culvert
Storm Storage Reservoir j Access Point àk Current Regulator
6 Dynamic Protective Device
¬ Exterior Light
É Generator
× Electrical Utility Node
º Meter
!. Structure Support
Ó Substation
#* Surface Structure
Å Switch
Ê Switching Station
Ò Transformer
Õ Voltage Regulator
Conduit System
Counterpoise System
Guy Wire
Electrical Utility Segment
OH Primary
! ! ! ! ! ! ! ! ! OH Secondary
OH Transmission
UG Primary
UG Secondary
UG Transmission
L Anchor Guy
Ó Electric Station
ÎV Fuse Cabinet
6 Overcurrent Device
Plug-In p Service Point
#0 Station
! Street Light
!. Support Structure
#* Surface Structure
Å Switch
Ò Transformer
_̂ MAFB VEC Demarcation
Device Leader
Span
(!ù Valve
#0 Meter
#* Station
!( Marker Ball
#* Excess Flow Valve
") CP Rectifier
!( Noncontrollable Fitting
") Controllable Fitting
!( Liquid Removal Point
D Abandoned Device
CP Bond Wire
Downstream Pipe
Service
Main
Abandoned Service
Abandoned Main
POL Utility Node ô Pump Station
Ý Hydrant ß Meter
Ú Fitting
Þ Filter Strainer
Ö Pump
Control Valve
Pig Launch
Ö Air Eliminator á Oil Water Sep
POL Utility Segment
Installation Pipeline
Interterminal Pipeline
Line Defueling
Tank Farm
Pump Station
L Privatized Anode
Z Privatized Rectifier
M Privatized Test Station â Rectifier
Ø Test Point
 Access Port
× Anode
Installation
Ammunition Storage
Unexploded Ordnance Clearance
Quantity Distance Arc, Combined
Quantity Distance Arc
Military Weapons Range
Military Training Location siteType
Military Field Training Area
Military Parade Ground
}} Fence
Gate
! ! ! ! ! ! ! ! Wall
Wall, Area
Barricade
à Barricade Point
Blast Door
Building
Structure sdsFeatureName
Airfield Facility Surface
Bleachers
Canopy, Pavilion
Shed
Tower
Communications Tower
Pavement Slab
Storage Tank
Wastewater Lagoon
Sidewalk
Pavement Markings
Airfield Surface
Bridge Centerline sdsFeatureName
Road
Railroad
Bridge
Road Centerline
Parking Lots, Driveways
QJVFGIO_310.PavementBranch_A
Road Area
Dam
Water Body
Water Feature
Wetland
Water Course
Campground
! ! ! Recreation Trail
Playground
Recreation Feature recreationFeatureType
Archery Range, Horseshoe Pit
Athletic Court, Field
Picnic Site
Swimming Pool
Park
Golf Course Feature sdsFeatureDescription
Fairway
Green
Sand Bunker
Tee Box
Water Hazard
Golf Course
| CE PEB Topographic.pdf |
| Sheets and Views |
| Minot Complex Full Space Use-Site Layout 1 |
File details come from the government source that posted it. Updated .