STATEMENT OF WORK

Rpr Storm Water Drain, APA to North Lagoon, Project Number QJVF 11-0156 Project Amendment #1, 27 April 2015

Amendment consists of the following:

1. Drawings CD 101 to CD 108, change key note 2 to: “FENCE – DO NOT DISTURB, EXCEPT AS DESCRIBED IN GENERAL DEMOLITION NOTE 11.”

2. Drawings CD 101 to CD 108, add GENERAL DEMOLITION NOTE Number 11: “REMOVE FENCE SECTIONS AS REQUIRED FOR A COMPLETE PROJECT. DISTURBANCE SHALL BE KEPT TO A MINIMUM. SITE SHALL BE SECURED AT ALL TIMES DURING WORK TO MAINTAIN SAFETY & ACCESS. AREA SHALL BE SECURED AT THE END OF EACH WORK DAY TO MAINTAIN SAFETY AT THE SITE. FENCE SHALL BE REINSTALLED TO EQUAL TO OR BETTER CONDITION THAN WHICH IS EXISTING. REPLACE FENCE, AS NECESSARY, TO FULLFILL ‘EQUAL OR BETTER TO CONDITION.’ FENCING LOCATIONS PROPOSED TO BE DISTURBED SHALL BE COORDINATED WITH THE PROJECT ENGINEER.”