Attachment_6_-_Detailed_Construction_Breakdown.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- FA4528-15-R-0013
About this file
Attachment 6 - Construction Cost Estimate Breakdown
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statement_of_Work_Revision_-_Amendment_1.docx | DOCX document | |
| FA4528-15-R-0013_Amendment_1.pdf | ||
| Attachment_1_-_Specifications.pdf | ||
| Attachment_2_-_Drawings.pdf | ||
| FA4528-15-R-0013_Solicitation.pdf | ||
| Attachment_3_-_Wage_Determination.docx | DOCX document | |
| Attachment_5_-_Financial_Responsibility.docx | DOCX document | |
| Attachment_4_-_Past_Performance_Information_Form.docx | DOCX document | |
| Draft01_Specifications.pdf | ||
| Draft02_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Construction Cost Breakdown | |||||
| FA4528-15-R-0013 | |||||
| QJVF 11-0156, Repair Storm Drain APA to N Lagoon | Contractor Name | ||||
| Attachment 6 | Date | ||||
| Line No. | Description of Offer Item | Unit | Unit Cost | Quantity | Line Total |
| 1 | General Conditions | LS | |||
| 2 | Mobilization | LS | |||
| 3 | Erosion Control | LS | |||
| 4 | Construction Survey | LS | |||
| 5 | Remove Tree/Bush | EA | |||
| 6 | Remove Rip Rap | CY | |||
| 7 | Remove Piling | EA | |||
| 8 | Remove and Salvage Storm Sewer Flap Gates | EA | |||
| 9 | Stop Gate Repair | LS | |||
| 10 | Geotextile Fabric | SY | |||
| 11 | Side Slope Reconstruction | CY | |||
| 12 | Unclassified Excavation/Grading | CY | |||
| 13 | Provide and Place Topsoil | CY | |||
| 14 | Aggregate Base/Bedding | TON | |||
| 15 | Storm Sewer Pipe Removal | LF | |||
| 16 | Miscellaneous Removals | LS | |||
| 17 | Materials Testing | LS | |||
| 18 | Remove Storm Sewer Outlet/Headwalls | EA | |||
| 19 | Storm Sewer Outlet Structure | EA | |||
| 20 | Gasketed 12" RCP, CL II | LF | |||
| 21 | Gasketed 15" RCP, CL II | LF | |||
| 22 | Gasketed 24" RCP, CL II | LF | |||
| 23 | Gasketed 36" RCP, CL II | LF | |||
| 24 | Gasketed 42" RCP, CL II | LF | |||
| 25 | Gasketed 48" RCP, CL II | LF | |||
| 26 | Gasketed 60" RCP, CL II | LF | |||
| 27 | Tied 12" Flared End | EA | |||
| 28 | Tied 15" Flared End | EA | |||
| 29 | Tied 24" Flared End | EA | |||
| 30 | Tied 36" Flared End | EA | |||
| 31 | Tied 42" Flared End | EA | |||
| 32 | Tied 48" Flared End | EA | |||
| 33 | Tied 60" Flared End | EA | |||
| 34 | Tied 12" Bend | EA | |||
| 35 | Tied 24" Bend | EA | |||
| 36 | Tied 36" Bend | EA | |||
| 37 | Tied 42" Bend | EA | |||
| 38 | Tied 48" Bend | EA | |||
| 39 | CL II Rip Rap | TON | |||
| 40 | Connect to Existing Storm Sewer | EA | |||
| 41 | Track Rack | EA | |||
| 42 | Slide Gates | EA | |||
| 43 | Turf Reinforcement | SY | |||
| 44 | Seeding, Fertilizing, & Mulching | SY | |||
| 45 | |||||
| 46 | |||||
| 47 | |||||
| 48 | |||||
| 49 | Overhead | LS | |||
| 50 | Profit | LS | |||
| 51 | Bonding | LS | |||
| Total |