Attachment 6 - Construction Cost Estimate Breakdown

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Construction Cost Breakdown
FA4528-15-R-0013
QJVF 11-0156, Repair Storm Drain APA to N LagoonContractor Name
Attachment 6Date
Line No.Description of Offer ItemUnitUnit CostQuantityLine Total
1General ConditionsLS
2MobilizationLS
3Erosion ControlLS
4Construction SurveyLS
5Remove Tree/BushEA
6Remove Rip RapCY
7Remove PilingEA
8Remove and Salvage Storm Sewer Flap GatesEA
9Stop Gate RepairLS
10Geotextile FabricSY
11Side Slope ReconstructionCY
12Unclassified Excavation/GradingCY
13Provide and Place TopsoilCY
14Aggregate Base/BeddingTON
15Storm Sewer Pipe RemovalLF
16Miscellaneous RemovalsLS
17Materials TestingLS
18Remove Storm Sewer Outlet/HeadwallsEA
19Storm Sewer Outlet StructureEA
20Gasketed 12" RCP, CL IILF
21Gasketed 15" RCP, CL IILF
22Gasketed 24" RCP, CL IILF
23Gasketed 36" RCP, CL IILF
24Gasketed 42" RCP, CL IILF
25Gasketed 48" RCP, CL IILF
26Gasketed 60" RCP, CL IILF
27Tied 12" Flared EndEA
28Tied 15" Flared EndEA
29Tied 24" Flared EndEA
30Tied 36" Flared EndEA
31Tied 42" Flared EndEA
32Tied 48" Flared EndEA
33Tied 60" Flared EndEA
34Tied 12" BendEA
35Tied 24" BendEA
36Tied 36" BendEA
37Tied 42" BendEA
38Tied 48" BendEA
39CL II Rip RapTON
40Connect to Existing Storm SewerEA
41Track RackEA
42Slide GatesEA
43Turf ReinforcementSY
44Seeding, Fertilizing, & MulchingSY
45
46
47
48
49OverheadLS
50ProfitLS
51BondingLS
Total