13-6011_Specs.pdf

PDF 378 KB Posted

Attached to
Ring Dike F2, F6, M11 (LF Contour/Repair Drainage)
Solicitation number
FA4528-15-R-0007
Issued by

About this file

Attachment 1

View the file

Other files

File Type Posted
Amendment_0001 _Ring_Dike.pdf PDF
Attachment_7 _Q A.pdf PDF
Solicitation.pdf PDF
WD.pdf PDF
13-6011_Drawings.pdf PDF
PIF.pdf PDF
Financial.pdf PDF
CCB.pdf PDF
13-6011_Combined_20_Nov 2014_DRAFT_VERSION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S P E C I F I C A T I O N

FOR PROJECT

UQJVF 13-6011

UCONSTRUCT RING DIKE AT F-02, F-06 & M-11

AT

MINOT AIR FORCE BASE, NORTH DAKOTA

PREPARED BY:

5 CES, MISSILE ENGINEERING FLIGHT

MINOT AIR FORCE BASE, NORTH DAKOTA

MAY 2013

UTABLE OF CONTENTS

UDIVISION 1U - UGENERAL REQUIREMENTSU USECTION PAGES

01000 Special Provisions 01300 Submittals 01400 Quality Control

01000-1 thru 7 01300-1 thru 5 01400-1 thru 6

01431 Environmental Protection 01431-1 thru 13

UDIVISION 2U - USITEWORK

02200 Riprap 02200-1 thru 4 02210 Site Grading 02010-1 thru 6 02260 Clay Barrier Layer 02260-1 thru 9 02275 Geotextile 02275-1 thru 4 02444 Chain Link Fence and Gates 02444-1 thru 6 02485 Seeding 02485-1 thru 7 i

QJVF 13-6011

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01000

USPECIAL PROVISIONS

U1. GENERALU:

U1.1 DESCRIPTION OF WORKU: In general, this project includes the following items.

U1.1.1U Install temporary security fence and remove existing security fence.

U1.1.2U Remove existing clay berm and CMP culvert.

U1.1.3U Install new clay berm, CMP culvert and stone riprap.

U1.1.4U Install new permanent security fence and remove temporary security fence.

U1.2 LOCATION OF WORKU: This work is at Launch Facility F-02, F-06 and M- 11 in the Minot Air Force Base (MAFB) Missile Field.

U1.3 APPLICABLE PUBLICATIONSU: Publications shall be of the most current date at the Invitation For bid date.

U1.4 HAZARDOUS MATERIALSU: Contractor shall submit prior to contract award Material Safety Data Sheet (MSDS) expected to be used during contract performance. Hazardous material shall be defined in the latest version of Federal Standard No. 313.

U2. PRODUCTSU: The products to be used in the work under this contract are described in the other sections of these specifications.

U3. EXECUTIONU:

U3.1 TRAFFIC CONTROLU: The Contractor shall provide all traffic control devices within the project limits and on all haul routes. The Contractor will be responsible for maintaining all areas of new construction until accepted by the Government.

U3.2 HAULING MATERIALSU: Materials will be hauled in vehicles equipped with pneumatic tires. Hauling of materials shall comply with state and local regulations. The Contractor shall be responsible for establishing and maintaining off-site haul routes.

01000-1

U3.3 EQUIPMENT PARKINGU: Space for the Contractor's equipment will be determined at the preconstruction conference. The Government shall not be liable for the security of any of the Contractor's equipment or material during the duration of the project.

U3.4 DRAWINGS AND SPECIFICATIONSU: At least one set of drawings and specifications shall be kept at the job site at all times by each superintendent.

U3.5 WORK CONDUCT, CORRELATION, EXECUTION, ETC. U:

U3.5.1U Work Performance: Contractor shall conduct all work, including materials distribution in an orderly manner with minimum disturbance and inconvenience to traffic operations. Contractor shall confine and limit his personnel to only those areas required for work performance. All work shall be performed in a neat, orderly fashion, with extreme care exercised to avoid damage to all property in and around project areas. Any damage caused by the Contractor shall be replaced, repaired, or restored at no cost to the Government. Upon completion, all work and storage areas shall be cleaned of all evidence of Contractor's debris accumulations. Contractor's proposed work schedule shall be coordinated with the Contracting Officer or his designated representative 14 days prior to the start of any work. All work areas shall be barricaded properly for day and nighttime vehicular safety warning.

U3.5.2U The Using Agency will occupy the premises during construction. The Contractor will be required to coordinate with the Contracting Officer to minimize conflict and to facilitate Using Agency operations.

U3.5.3U Work of the various sections of specifications shall be coordinated so as to assure efficient and orderly sequence of installation of construction elements, with provisions for accommodating items to be installed concurrently by others.

U3.5.4U Storage: At close of each day's operation, all excess materials and equipment shall be moved to Contractor's staging area. If Contractor should have a storage structure or equipment located on site, it shall be removed, and staging area restored to its original condition within fourteen days after final inspection.

U3.6 QUALITY CONTROLU: Refer to Spec. Section 01400 QUALITY CONTROL.

01000-2

U3.7 PERMITSU:

U3.7.1U Clearance Work Request:

U3.7.1.1U Contractor shall coordinate with appropriate utility locating agencies, including base communications cable maintenance (Item 1 through 15) of AF Form 103, Base Civil Engineering Work Clearance Request. AF Form 103 will be given to the Contractor during the pre-construction meeting.

Contractor shall complete and follow all instructions on AF Form 103 before start of work. A copy of AF Form 103 instructions will be available to the Contractor during the pre-construction meeting.

U3.7.1.2U Before any excavation, alteration, or other construction work is begun, the Contractor shall obtain and fully process an AF Form 103, Base Civil Engineering Work Clearance Request. The form requires extensive coordination with several base agencies, including furnishing all locations, detailed information, and sketches regarding any proposed excavation(s). Processing a separate request for each Launch Facility is not required but a separate request for each planned excavation is required; each phase of processing the form and its attachments shall be completed prior to commencing work involving that phase. The AF Form 103 shall be prominently displayed on the job site at all times for review by the Contracting Officer and/or his or her designated representative. A copy of the signed form shall be submitted to the Contracting Officer and a copy to the project inspector.

Completion of the AF Form 103 includes certifying compliance with institutional controls indicated by 5 CES/CEAN, coordination in getting the form coordinated, and returning the form to the Environmental office when the project has been completed.

U3.7.1.3U Contractor shall schedule a meeting time to meet with each utility agency at the work site to locate affected utilities.

U3.7.1.4U Contractor shall maintain all marked utilities in the field once they are initially marked by each utility agency. If markings are damaged, Contractor shall request new locates and shall give the locating agency 48 hours to perform the new locates. Expenses for time and materials to perform repeat locates shall be borne by the Contractor, unless otherwise approved by the Approving Officer. Cost to do the repeat locates will be deducted from the final invoice. Cost will be calculated using the average shop rate of each agency. In cases where utilities were marked late in the year and operations had to be shut down for winter, marked utilities would still have to be maintained by the Contractor by placing stakes or transcribing the marks on a drawing. When construction resumes, Contractor shall re-mark the site and may request verification of utility locations at no additional cost to him. Off-base utility locates agencies might request additional cost for repeat locates.

01000-3

U3.7.1.5U Clearance request is not valid until signed by the Approving Officer, block 17 of the AF Form 103. Approving Officer will not sign until all locates are marked and all utility locating agencies signatures are on the form. Excavation work shall commence within 30 days after the Approving Officer's signature; otherwise, clearance request is invalid and a new request is required. Notify Contracting Officer immediately if new utilities were installed by others and not marked after all initial locates are made.

U3.7.1.6U Protection of Existing Utilities: The Contractor shall safeguard and protect from damage all utilities encountered or uncovered during digging, excavation, and backfilling.

U3.7.2U AF Form 592: When any welding, cutting, brazing or use of any open flame device is to be used, an AF Form 592 permit must be obtained from the Base Fire Department (Bldg 896, 896 Flightline Drive) prior to beginning such work. During such work, a fully charged and operable fire extinguisher, appropriate for the task, shall be provided by the Contractor.

U3.8 FIELD ENGINEERINGU: The Contractor shall provide field engineering services; establish grades, lines, and levels, by use of recognized engineering survey practices.

U3.9 DEWATERINGU: If groundwater is encountered, the Contractor shall be responsible for dewatering the site. Soils affected by the water shall be dried to a workable moisture prior to work proceeding. If the area cannot be stabilized by drying, the Contractor shall replace unsuitable soils with select fill.

U3.10 SAFETYU:

U3.10.1U Safety Requirements: Contractor will comply with all OSHA/NEC requirements and MAFB Instruction 32-2001, Responsibilities of Base Personnel to Eliminate or Control Fire Hazards.

U3.10.2U Radioactive Sources: The Contractor shall submit to the Contracting Officer the dates the radioactive sources will be on site and the Nuclear Regulatory Commission license at the preconstruction conference.

U3.10.3U Hazardous Waste: Any hazardous waste/material used or generated by the Contractor shall become the property of the Contractor. The use, generation, and disposal of all hazardous waste/material will be the responsibility of the Contractor and shall be handled in accordance with all federal and state hazardous waste and toxic substances control regulations.

01000-4

U3.11 UTILITIESU: Electricity required by the Contractor for the completion of the contract shall be provided by the Government at no cost to the Contractor.

U3.12 WINTER EXCLUSIONU: The winter exclusion shall be from 15 November through 1 April.

U3.13 SECURITY REQUIREMENTS:

U3.13.1U The Contractor shall be responsible for furnishing to each employee and for requiring each employee engaged on the work to display such identification as may be approved and directed by the Contracting Officer.

All prescribed identification shall immediately be delivered to the Contracting Officer, for cancellation upon release of any employees.

U3.13.2U Entry and Site Regulations:

U3.13.2.1U Entry: In order to gain entry onto a facility, Contractor personnel and mission essential Contractor owned/leased/rented vehicles must be listed on an Entry Authority List (EAL), identified by Government inspector/escort personnel, and physically escorted on site by authorized Government inspector/personnel. No privately owned vehicles (POVs) will be permitted on MAFs or LFs.

U3.13.2.2U Thirty (30) working days prior to the initial commencement of work, the Contractor must submit to the Contracting Officer a summarized list of employees and mission essential Contractor owned/leased/rented vehicles along with a legible photocopy of each employee’s government issued credential photo ID. The lists and photocopies will be used to prepare the Contractor’s EAL referenced above. Foremen, supervisors and superintendents must be identified as such on the Contractor’s list of employee information. Deletions to the EAL may be made without preparing a new list but must be requested by the Contractor in writing. However, a new list must be submitted by the Contractor for any addition or change to the EAL. All requested changes in writing to an approved list submitted between the 1st and 15th of the month inclusive shall be in place by the end of that month. All requested changes in writing to an approved list submitted between the 16th and end of the month inclusive shall be in place by the 15th of the following month.

U3.13.2.2.1U The Contractor’s summarized list of employee information must show each employee’s full name exactly as it appears on the credentialed photo ID submitted; date of birth (DOB); full Social Security Account Number (SSAN); citizenship; the government issuing agency name and control number exactly as it appears on the credentialed ID submitted. U.S. government issued credential photo IDs must have a picture of the individual, individual’s DOB and a control number. Acceptable government

01000-5 issued credentialed photo IDs are U.S. Federal passport or passport card, or state, commonwealth, territory, protectorate, District of Columbia, U.S.

sovereign insular area or tribal organization recognized by the U.S.

Department of the Interior cards.

U3.13.2.2.2U The Contractor’s summarized list of vehicle information must include vehicle make; vehicle model; vehicle year;

vehicle primary color; vehicle license plate state of issue and number.

Vehicles include mission essential company owned/leased/rented vehicles driven out to the MAF or LF and brought onsite for use, i.e. pick-up trucks, cars, vans, lineman’s trucks, dump trucks and all trailers being taken onsite. All equipment (i.e. skit-steers, Bobcats, forklifts, loaders/backhoes/ lifts, trenchers, air compressors, welders, etc.), materials, and hand-carried items (i.e. power tools and hand tools) brought out to the site on a trailer are not required to be listed on the EAL. A piece of equipment driven on-site rather than on a listed trailer needs to be listed on the EAL. No privately owned vehicles will be permitted on MAFs or LFs.

U3.13.2.3U Upon arrival at the MAF, Contractor personnel will contact the Flight Security Controller (FSC) using the gate intercom telephone and inform the FSC of their presence at the security gate. Contractor personnel must remain outside of the security fence and in or near their vehicle until the arrival of the Government inspector/escort.

U3.13.2.4U Upon arrival, the Government inspector/escort will identify and search all Contractor personnel. All Contractor personnel will provide the Government inspector/escort with two (2) forms of identification as listed above (one being photo) stating the employee’s full name and SSN.

These two forms of identification shall be the same two forms of ID used to generate the EAL. The Contractor's vehicles will be checked and possibly searched prior to site entry. Contractor vehicles shall be clearly marked identifying each contracting firm.

U3.13.2.5U If Contractor personnel are not listed on the EAL, or those who are listed cannot provide proper identification, they will not be permitted on the site. Delays caused by lack of proper EAL data or proper identification shall be at no cost to the Government.

U3.13.2.6U Restricted Area. The work to be performed is in a restricted area. Therefore, the Contractor shall conform to all requirements of MAFB IDP 31. Workers will be required to have an escort with them at all times. The Using Agency will provide an escort for the Contractor. The Contractor shall allow 60 minutes each day for personnel to process on and off the work site that will not be considered delay time. The Contractor shall bid a crew hourly rate for any delays beyond the 60 minutes. This hourly rate will also apply to Government-caused work stoppages when the entire work crew will be asked to evacuate the work area. All site access delays must be reported by

01000-6 the Contractor, in writing, to the Contracting Officer within 24 hours of occurrence. All Government-caused work stoppages must be documented by Government personnel at the time of occurrence and reported by the Contractor, in writing, to the Contracting Officer within 48 hours of occurrence.

U3.13.3U Security: The Contractor shall:

U3.13.3.1U Protect all Government property.

U3.13.3.2U Comply with base physical security regulations and procedures.

U3.13.3.3U The Government inspector/escort will be responsible for on-site security.

U3.8.3.3.1U While work is in progress, the Contractor may be required to remove his personnel due to Alert status, real or exercise.

U3.13.3.4U During all on-site work, the Contractor personnel will be accompanied and continuously monitored by one (1) Government inspector/escort. Failure to remain within the area being monitored is a serious breach of security and safety regulations. The Contractor will take all necessary action to ensure compliance. The Contracting Officer reserves the right to deny entry to/or take action with any Contractor personnel who refuse to conform to security and/or safety regulations. Delays resulting from such entry denial shall not result in any cost to the Government or schedule delay.

U3.14 AS-BUILT DRAWINGS:U The Contractor shall maintain a set of red-lined full-size, as-built construction drawings marked-up to fully indicate as-built conditions. These drawings shall be maintained in a current condition at all times until completion of the work and shall be available for review by Government personnel at all times. The location as dimensioned from permanent features, general description, type of material, and approximate depth below finished grade of all new and existing exterior underground utilities encountered shall be indicated. All variations from the contract drawings for the required coordination between trades shall be indicated.

These variations shall be shown in the same general detail utilized in the initial contract drawings. As-built construction drawings shall be furnished to the Contracting Officer for use during the final inspection. The as-built drawings shall be submitted to the Contracting Officer in accordance with Section 01300: SUBMITTALS.

END OF SECTION

01000-7

SECTION 01300

USUBMITTALS

U1. GENERAL:

U1.1 PROCEDURESU:

U1.1.1U The Contractor shall be required to submit items listed in the Submittal Schedule at the end of this section to the Contracting Officer for approval.

U1.1.2U Items shall be transmitted under AF 3000, Material Approval Submittal form. Each submittal shall identify contract number, project number, and Contractor. Section and paragraph reference shall be made for each item submitted with the AF 3000. Contractor shall submit three copies unless otherwise required elsewhere in the specification.

U1.1.3U Unless specifically stated otherwise elsewhere in this specification, each submittal shall be approved by the Contracting Officer prior to incorporation of materials into the work.

U1.1.4U Approvals of submittals which do not conform to the contract shall not be construed as a change to the contract.

U1.1.5U The Contractor shall fill in the "Required Submission Date" on the AF Form 66s with the date he plans on submitting the submittals to the Government. A copy of the AF Form 66s with the required submission date filled in shall be submitted to the Contracting Officer for use by the contract administrator. Form 66s shall be submitted in accordance with this section.

U1.2 MANUFACTURER'S DATA AND SAMPLESU: Where manufacturer's data and samples are required, Contractor shall submit in accordance with procedures identified in 1.1 above.

U1.2.1U Manufacturer's Certification: Contractor shall submit a statement from the product manufacturer that proposed products meet the specified standards and other salient characteristics identified as requirements in the specification.

U1.3 TEST DATAU: Test results shall be dated and signed by the agency performing the test.

01300-1

U1.4 MISCELLANEOUS SUBMITTALSU: Submittals which are none of the above types shall meet the specific requirements identified in the referenced paragraph of the Specification Section identified in the schedule.

U1.5 SUBMITTAL SCHEDULEU: The following is a list of required submittals for this Contract and deadlines for their submittal.

01300-2

AF Form 66

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract Number

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Number of Copies Required

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O

M M

EN

D

A

TI

O N

S M

A N

U

FA

C

TU

R

W A

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R U

C

TI

O N

S

TE

ST

S

O

TH

ER

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

D

TE

D A

TE

R

EC

EI

VE

C

N

TR

A C

TI

N

G

D A

TE

T

O C

IV

IL

EN

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

SE

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

TO

ES

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPPROVED

1 01000/1.3

MSDS 3

2 01000/3.7.1.2 AF Form 103 1

3 01000/3.10.2 NRC License 3

4 01000/3.14 As-Built Drawings 3

5 01400/1.2.1 Quality Assurance Plan 3

6 01400/1.2.2.3 Inspection System description 3

7 01400/1.2.2.4 Monthly Performance Report 3

8 01400/1.2.2.5 Letters of Authority 3

9 01400/1.3.1.1 Qualifications 3

01431/1.4.1 Environmental Pollution Control Proposal

QJVF 13-6011 Construct Ring Dike at F-02, F-06 & M-11

01300-3

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Number of Copies Required

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

O

M M

EN

D

A

TI

O N

S M

A N

U

FA

C

TU

R

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

TE

ST

S

O

TH

ER

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

D A

TE

R

EC

EI

VE

N

TR

A C

TI

N

G

D A

TE

T

O C

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPPROVED

QJVF 13-6011 Construct Ring Dike at F-02, F-06 & M-11

11 01431/1.4.2 Preconstruction Survey 3

12 01431/1.4.3 HAZMAT Authorization Info. 3

13 01431/1.4.4 Monthly HAZMAT Usage Data 3

14 01431/1.4.5 Completion HAZMAT Usage Data 3

15 01431/1.4.6 C & D Report 3

01431/1.4.7 Disposal Documents and Weight Tickets

17 01431/1.4.8 Solid Waste Diversion Report 3

18 01431/1.4.9 Notice of Intent 1

19 02200/1.2.2.1 Test Results 3

20 02200/1.2.2.5 Initial Tests 3

01300-4

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Number of Copies Required

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

O

M M

EN

D

A

TI

O N

S M

A N

U

FA

C

TU

R

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

TE

ST

S

O

TH

ER

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

D A

TE

R

EC

EI

VE

N

TR

A C

TI

N

G

D A

TE

T

O C

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPPROVED

QJVF 13-6011 Construct Ring Dike at F-02, F-06 & M-11

21 02200/1.4.1 Gradation Tests 3

22 02200/1.5.3 Gradation Tests 3

23 02210/3.5.2.1 Test Results 3

24 02210/3.5.3.2 Test Results 3

25 02210/3.5.3.3 Test Results 3

26 02260/1.2 Materials Handling Plan 3

02260/1.2 Borrow Source Assessment Report

28 02260/1.2 Testing Lab Qualifications 3

29 02444/2.1.9 PCC product information 3

30 02444/2.2 Certificate of Compliance 3

01300-5

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Number of Copies Required

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

O

M M

EN

D

A

TI

O N

S M

A N

U

FA

C

TU

R

R R

A N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

TE

ST

S

O

TH

ER

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

D A

TE

R

EC

EI

VE

N

TR

A C

TI

N

G

D A

TE

T

O C

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

TE

SU

B

M

IT

TA

L

N U

M B

ER

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPPROVED

QJVF 13-6011 Construct Ring Dike at F-02, F-06 & M-11

31 02485/1.4.1 Herbicide Data 3

32 02485/1.4.2 Certifications 3

33 02485/1.4.3 Certification of Compliance 3

EN

D

O

F SEC

TIO

01300-6

SECTION 01400

UQUALITY CONTROL

U1.1 SUMMARYU:

U1.1.1U The requirements of this Section apply to, and are a component part of, each section of the specifications.

U1.2 SUBMITTALSU: The following shall be submitted in accordance with Section 01300 SUBMITTALS:

U1.2.1U Quality Assurance Plan: The Quality Assurance Plan shall address the following:

U1.2.1.1U Description of the authority, responsibilities and coordinating procedures of on-site/off-site quality assurance personnel, including those QA personnel not under direct control of the Contractor.

U1.2.1.2U A list of personnel designated by the Contractor to accomplish the work required by the contract.

U1.2.1.3U Contractor’s operational plan for accomplishing and reviewing work controls, certifications, and documentation of quality control operations, inspections, and test records, including those for subcontractors.

U1.2.1.4U Methods to be used during the procurement cycle (order to delivery) for those materials or equipment that require source inspections, shop fabrications, or similar operations located separately from the work site.

U1.2.1.5U Description of on-site personnel training.

U1.2.1.6U Certifications of personnel, procedures, processes, and equipment.

U1.2.1.7U Nondestructive testing requirements.

U1.2.1.8U Identification of independent certifying and testing laboratories.

U1.2.2U Records

01400-1

U1.2.2.1U Contractor shall include all quality control data;

factory tests or manufacturer’s certifications, quality control coordinating actions; records of quality control training/certifications as well as routine hydrostatic, electrical continuity, grounding, welding, line cleaning, field tests and similar tests. Quality Control records must be available for examination by the Contracting Officer.

U1.2.2.2U Contractor shall furnish legible copies of the test and inspection records to the Contracting Officer.

U1.2.2.3U A narrative description of an inspection system which provides for compliance with the quality requirements and technical criteria of the contract shall be submitted for approval within 14 calendar days after notice to proceed.

U1.2.2.4U A monthly performance report that summarizes the quality operations shall be submitted. Contractor shall identify inspections made, tests performed, nonconformances, corrective actions taken, status of plans/procedures being developed, and status of open items/problems in work.

U1.2.2.5U Letters of Authority or Delegation, outlining the authority and responsibilities of quality control personnel, shall be submitted along with a copy of the letter of delegation to the Contracting Officer that defines delegated duties and responsibilities.

U1.3 QUALITY ASSURANCE

U1.3.1U Qualifications

U1.3.1.1U Contractor shall submit Quality Representative Qualifications to the Contracting Officer for approval. Quality Representative may be assigned to more than one contract provided that the assigned contracts are located at the same site.

U1.3.1.2U When approval or certifications of special processes, operating personnel, and special equipment or procedures is required by the specifications, approvals or certifications shall be obtained prior to starting the work.

U1.3.2U Quality Control Requirements: Contractor shall provide a quality control program encompassing selection of construction materials and sources; suppliers; subcontractors; on-site and off-site fabrication of Contractor-furnished assemblies; on-site and off-site assembly; erection; work procedures; workmanship; inspection; and testing.

01400-2

U1.3.2.1U Contractor shall designate an individual within the on-site organizations whose sole responsibility is the day-to-day on-site management and direction of the Quality Program. The Quality Program manager will report to the Contractor’s management and have the necessary authority to discharge contractual responsibilities.

U1.3.2.2U Records, drawings, submittals, and equipment must be identified by referencing the Contract Number; Contract Specification Section;

Drawing Sheet Number; Submittal Document Number; and Contract Change Number.

U1.3.2.3U Procurement: Contractor is responsible for controlling procurement sources and those of his subcontractors to ensure that each purchase meets quality requirements.

U1.3.2.4U Receiving Inspection System: Contractor shall maintain a site receiving inspection system that ensures procured materials and equipment are inspected and tested. Receiving inspection records must accompany each procurement delivery to the construction site. Contractor shall maintain records of site receiving inspections. Defects, discrepancies, dispositions, and waivers shall be shown within the records.

U1.3.2.5U Nonconforming Articles and Material Control:

Nonconformance discovered by the Contractor, subcontractors, suppliers or Government quality representatives shall be controlled to prevent their use and to correct deficient operations.

U1.3.2.5.1U A “nonconformance” report shall be prepared for each instance comprising: A unique and traceable number, identification of the nonconforming article or material, a description of the nonconformance and the applicable requirement, cause or reason for the nonconformance, remedial actions taken or recommended, and disposition of the nonconforming article or material.

U1.3.2.5.2U Each nonconforming article shall be identified and marked for removal from the work area.

U1.3.2.6U Fabrication, Process, and Work Control: Contractor shall establish in-process inspections to ensure compliance with quality requirements in contract specifications and drawings.

U1.3.2.7U Quality Control Records: Quality control records shall be maintained at a central on-site location. Maintenance of quality control records does not relieve the Contractor from submitting samples, test data, detail drawings, material certificates, or other information required by each section in the specification. Contractor shall ensure each record is identified and traceable to specific requirements in the specifications and drawings.

01400-3

U1.3.3U Quality Inspections.

U1.3.3.1U Government Inspections: Work performed under this contract will be subject to inspection by the Contracting Officer. Changes to the specifications or drawings will not be allowed without written authorization of the Contracting Officer. When the Contracting Officer determines that inspected work needs to be corrected, the Contracting Officer will be allowed 24 hours to complete re-inspection of the corrected work.

U1.3.3.1.1U Contractor shall notify Contracting Officer in writing 3 hours prior to backfilling or encasing any underground utility so that work may be inspected. Failure to notify the Contracting Officer before backfill or encasement occurs will require the work be uncovered at no additional cost to the Government.

U1.3.3.1.2U Contractor’s program is subject to continuous evaluation, review, and verification by the Contracting Officer.

Contractor will be notified in writing of any noncompliance and will be given 3 working days to correct identified deficiencies.

U1.3.3.2U Contractor’s Quality Inspections: Contractor shall implement an inspection system that documents and indicates quality control through records of inspections, tests, and procedures, including a system of scheduled or random audits to ensure task completion. The following items shall be included in the Contractor’s Quality Assurance System:

U1.3.3.2.1U A single Contractor’s representative responsible for on-site communication and operation of the inspection program.

U1.3.3.2.2U A purchasing control system documenting project procurement to drawings, specifications, and approved submittals.

U1.3.3.2.3U A receiving inspection system documenting inspections for each procurement.

U1.3.3.2.4U Documentation for handling and disposing of nonconforming components and materials.

U1.3.3.2.5U Inspection records for each specific section of the specifications and drawings.

U1.3.3.2.6U Identification of test(s) to be performed, test procedures, records and independent organizations use.

U1.3.3.2.7U Documentation and maintenance certification or re-certification of procedures.

01400-4

U1.3.3.2.8U Management of government-furnished equipment, components, and materials.

U1.3.3.2.9U Calibration of gages, tools, measuring instruments and independent laboratories used.

U1.3.4U Field Services

U1.3.4.1U Responsibility for Inspection and Testing:

Contractor is responsible for all inspections and tests, and the accompanying documentation for each inspection and test. Contractor may utilize independent inspection and testing laboratories or services as approved by the Contracting Officer. Contractor is also responsible for tests of construction materials utilizing the services of an approved independent testing laboratory.

U1.3.4.2U Inspection and test records: Contractor shall provide on-site records of each inspection and test performed throughout the life of the contract including, but not limited to, factual evidence that the required inspections or tests have been performed, including type and number of inspections or tests involved, identification of operators and inspectors, result of inspections or tests, nature of defects, causes for rejection, proposed remedial action, and corrective actions taken. Inspection records, test procedures, test results, and associated forms shall be verified by and provided to the Contracting Officer.

U1.4 HANDLING AND STORAGE

U1.4.1U Contractor shall provide controls, procedures and documentation with each shipment that meet requirements of each section of the specifications. Documentation shall consist of that required by the contract along with specifications required to identify, store, preserve, operate, and maintain the items shipped.

U1.5 SEQUENCING AND SCHEDULINGU:

U1.5.1U Contractor shall notify Government at least 24 hours prior to scheduled inspections and tests.

U1.5.2U Contractor shall provide notice to the Government not less than 7 calendar days prior to contract work starting at the site. When Contractor suspends work for 7 calendar days or longer prior to completion of work, the Contractor shall notify the Contracting Officer. No work shall resume without notification of the Contracting Officer.

U2. PRODUCTSU: Not Used.

01400-5

U3. EXECUTIONU: Not Used.

01400-6

SECTION 01431

UENVIRONMENTAL PROTECTION

U1.1U The Contractor shall perform all work in such manner as to minimize the polluting of air, water, or land, and shall, within reasonable limits, control noise and the disposal of solid waste materials, as well as other pollutants. Recycling of construction and demolition debris is required when economically advantageous.

U1.2 IMPLEMENTATIONU: Within 20 calendar days after Notice to Proceed and prior to commencement of the work at the site, the Contractor shall:

U1.2.1U Detail their proposal for implementing the requirements for environmental pollution control specified herein. Submit in accordance with the submittal table.

U1.3 REFERENCESU: The publications listed below form a part of this specification to the extent referenced. All references listed in these specifications are intended to be the current version or edition, unless specifically identified otherwise. The Contractor shall conform to the Occupational Safety & Health Act, Environmental Protection Agency, North Dakota Department of Health, U.S. Air Force and all other Federal, State and Local environmental regulatory requirements.

29 CFR Occupational Safety and Health Administration Code of Federal Regulations

40 CFR Environmental Protection Agency Code of Federal Regulations

49 CFR Department of Transportation Code of Federal Regulations

EO 13423 Executive Order, Strengthening Federal Environmental, Energy, and Transportation Management

EO 13514 Executive Order, Federal Leadership in Environmental, Energy, and Economic Performance

EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements Manual(1996)

WETLANDS U.S. Army Corps of Engineers Wetlands Delineation Manual

AFI 32-7042 Air Force Instruction, Waste Management

01431-1

AFI 32-7080 Air Force Instruction Pollution Prevention

AFI 32-7086 Air Force Instruction, Hazardous Materials Management

Federal Acquisition Regulation (FAR)

U1.4 SUBMITTALSU: In accordance with Section 01300: Submittals, the Contractor shall submit the following.

1.4.1 Environmental Pollution Control Proposal, see paragraph 1.2.1

1.4.2 Preconstruction Survey, see paragraph 3.1

1.4.3 Hazardous Materials Authorization Information, see paragraph 3.7

1.4.4 Hazardous Material Usage Data (Monthly), see paragraph 3.7

1.4.5 Hazardous Materials Usage Data (Completion), see paragraph 3.7.3

1.4.6 C&D Report, see paragraph 3.9.2

1.4.7 Disposal Documents and Weight Tickets, see paragraph 3.11.4.5

1.4.8 Solid Waste Diversion Report, see paragraph 3.11.5

1.4.9 Notice of Intent, see paragraphs 3.4.1.1

U2. PRODUCTS:U Not Used

U3. EXECUTION:

U3.1 PRECONSTRUCTION SURVEYU: Prior to start of any on-site construction activities, the Contractor shall make a condition survey after which the Contractor shall record on a layout plan the condition of trees, shrubs and grassed areas immediately adjacent to the site of the work and adjacent to his assigned storage area and access route as applicable. Submit in accordance with Section 1.4 above.

U3.2 PERMITS AND FEESU: No separate payment will be made for work covered under this section. The Contractor shall be responsible for payment of fees associated with environmental permits, application, and/or notices obtained by the Contractor. All costs associated with this section shall be included in the contract price. The Contractor shall be responsible for payment of all fines/fees for violation or non-compliance with Federal, State, Regional and local laws and regulations.

01431-2

U3.2.1U The Contractor shall be responsible for obtaining and complying with all environmental permits and commitments required by Federal, State, regional, and local environmental laws and regulations.

U3.3 PROTECTION OF LAND AREASU: Except for work areas, storage areas, or access routes specifically assigned for the use of the Contractor under this contract, the land areas outside the limits of permanent work performed under this contract shall be preserved in their present condition. The Contractor shall confine his construction activities to areas defined for work on the plans or specifically assigned for his use. Storage and related areas and access routes required temporarily by the Contractor in the performance of the work will be assigned by the Contracting Officer.

U3.4 WATER RESOURCES AND STORM WATER DISCHARGEU: The Contractor shall monitor construction activities to prevent pollution of surface and ground waters. Toxic or hazardous chemicals shall not be applied to soil or vegetation unless otherwise indicated. The Contractor shall monitor all water areas affected by construction activities.

U3.4.1U NPDES Storm Water Program General Construction Permit

U3.4.1.1U Small Construction: Small Construction Activity is defined as a site that is equal to or greater than 1 acre and less than 5 acres in size. This also includes sites that are less than 1 acre in total land area that are part of a large common plan of development or sale if the larger common plan will ultimately disturb no less than 1 acre. The Contractor shall submit one (1) single Notice of Intent (NOI) form to obtain coverage for all of an owner/operator’s Small Construction Activities. A SWPPP must be developed and implemented but not submitted to the Department unless requested. Permit and forms are available through the NDDH web-site.

U3.4.1.2U Wetlands, Erosion and Sediment Controls:

U3.4.1.2.1U Wetlands: The Contractor shall not enter, disturb, destroy, place fill into, or allow discharge of contaminants into any wetlands except as specifically authorized herein. The Contractor shall be responsible for the protection of wetlands near the Launch Facility. Authorization to enter specific wetlands identified shall not relieve the Contractor from any obligation to protect other wetlands within, adjacent to, or in the vicinity of the construction site and associated boundaries.

U3.4.1.2.2U The Contractor shall be responsible for providing erosion and sediment control measures in accordance with Federal, State and local laws. This applies in all cases, even for construction activity that disturbs less than an acre of soil. The erosion and sediment controls selected and maintained by the Contractor shall be such that water quality standards are not violated as a result of the Contractor’s construction activities. The area of bare soil exposed at any one time by construction operations should be kept to a minimum. The Contractor shall construct or install temporary and permanent erosion and sediment control best management practices (BMPs). BMPs

01431-3 may include, but not be limited to, vegetation cover, stream bank stabilization, slope stabilization, silt fences, construction of terraces, interceptor channels, sediment traps, inlet and outfall protection, diversion channels, and sedimentation basins. The Contractor’s best management practices shall also be in accordance with the Base National Pollutant Discharge Elimination System (NPDES) Storm Water Pollution Prevention Plan (SWPPP) which may be reviewed at the Minot AFB Environmental Management Office. Any temporary measures shall be removed after the area has been stabilized.

U3.4.2U For discharge of ground water, the Contractor shall obtain a State permit specific for pumping and discharging ground water prior to surface discharging in accordance with the requirements of the State Storm Water Discharges From Construction Sites permit. Refer to the NDDH web site.

U3.4.3U Protection of Water Resources: The Contractor shall control the disposal of fuels, oils, bitumen, calcium chloride, acids or harmful materials, both on and off the Government premises and shall comply with applicable federal, state, county and municipal laws concerning pollution of rivers, streams, and wetlands while performing work under this contract.

Special measures shall be taken to prevent chemicals, fuels, oils, greases, bituminous materials, herbicides, and insecticides from entering public waters. Water used in on-site material processing, concrete curing, foundation and concrete cleanup, and other waste waters shall not be allowed to reenter a stream if an increase in the turbidity of the stream could result therefrom.

U3.4.3.1U Dewatering of Groundwater: For temporary dewatering of groundwater encountered during construction, the Contractor shall land apply all water generated at locations approved by the Technical Representative.

Land application shall follow state requirements; however, no permit will be necessary. "Land application" implies that the Contractor shall discharge water at a rate which allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, defined drainage areas, or discharge into the "waters of the State" shall occur. The Contractor shall contact the State of North Dakota, Division of Water Quality and Permit Program, to discuss the water quality parameters for chemical contaminants (such as chlorine), oil, grease, and total suspended solids and shall ensure that all water intended for land application will meet the state requirements.

U3.4.4U Erosion and Sediment Control: The Contractor shall be responsible for providing erosion and sediment control measures in accordance with local, state, and federal regulations. The erosion and sediment controls selected and maintained by the Contractor shall be such that local, state, and federal water quality standards are not violated as a result of the Contractor's construction activities. The area of bare soil exposed at any one time by construction operations should be held to a minimum. For areas subject to erosion including, but not limited to, steep slopes, soils spreading areas, and stockpile areas, the Contractor shall disturb as little vegetation as possible, minimize the period of time that the soil is exposed, 01431-4 prevent surface water runoff from flowing across disturbed areas, stabilize disturbed soils as soon as possible, and provide adequate drainage for the increased runoff. Sedimentation/erosion control features may include, but not be limited to, vegetation cover, stream bank stabilization, slope stabilization construction of terraces, interceptor channels, sediment traps, inlet and outfall protection, diversion channels, and sedimentation basins.

Runoff management practices should be employed in areas where the potential for storm water contamination exists that cannot be addressed by a prevention or source reduction measure. Runoff management procedures may include vegetative swales, reuse of collected storm water, infiltration devices, and detention/sedimentation basins. Any erosion and sediment control measures which are damaged or found to be ineffective shall be remedied by the Contractor at no additional cost to the Government. Any areas damaged by erosion shall be repaired by the Contractor at no additional cost to the Government.

U3.4.5U Spill Prevention and Response Plan: The Contractor shall include a Spill Prevention and Response Plan in the Implementation Proposal.

The plan shall describe the Contractor's procedures for preventing and responding to spills of hazardous materials.

U3.5 AIR QUALITYU: Equipment operation, activities, or processes performed by the Contractor shall be in accordance with all Federal and State air emission and performance laws and standards.

U3.5.1U Burning of material by the Contractor is not allowed.

U3.5.2U Particulates: The contractor shall not operate a construction site or demolition project unless reasonable precautions are taken to control emissions of particulate matter. Such emissions of airborne particulate matter shall not exceed 20% opacity as defined in 40 CFR 60 Appendix A.

U3.5.3U Ozone Depleting Chemicals (ODCs): The contractor shall ensure activities performed under this contract are in compliance with the Air Force Policy on ODCs. The contractor shall not purchase, use, or specify the use of any Class I ODC in the production, design, or maintenance of the end item. Class II ODCs may be used or specified only with the written approval of the Contracting Officer.

U3.5.4U Dust Control: The Contractor shall maintain all excavations, embankments, stockpiles, access roads, plant sites, waste areas, borrow areas, and all other work areas free from excess dust to such reasonable degree as to avoid causing a hazard or nuisance. Temporary methods consisting of sprinkling, chemical treatment, light bituminous treatment or similar methods will be permitted to control dust. Dust control shall be performed as the work proceeds and whenever a dust nuisance or hazard occurs.

01431-5

U3.6 TOXICSU: The Contractor is responsible for ensuring that no employee is exposed to toxic materials like airborne asbestos, lead from lead base paint or polychlorinated biphenyls (PCB’s).

U3.7 HAZARDOUS MATERIALS (HAZMAT)U: Contractors must obtain an authorization prior to bringing any hazardous materials (Federal Standard 313) on Air Force installations. Contractors must submit all required documentation including appropriate Hazardous Materials Authorization Information Form, Material Safety Data Sheets (MSDS) and projected usage information to 5 CES/CEIE through the Contracting Officer at least 15 days before the HAZMAT is brought onto facilities within the Missile Field. This review is to ensure that no Air Force restricted hazardous materials are being proposed for use.

The contractor will comply with Federal Acquisition Regulation (FAR) 52.223-5.

Following contract award, the contractor shall provide the name and an initial volume of each hazardous material being used and its storage location.

Contractors shall provide 5 CES/CEIE with specific usage data on a monthly basis and a finalized usage report at project completion, as determined by the Installation Hazardous Materials Management Process (IHMMP) Team. Reports must include: name of material, manufacturer, NSN/Part #, container size, volume start balance, volume of material used in reporting period, storage location if it’s changed since initial reporting and the name and phone number of the reporting official. Reports shall be on letterhead paper, dated, and signed by the reporting official. Prime contractors shall be responsible for reporting hazardous material used by subcontractors. FAR 52.223-3 provides guidance on Hazardous Material Identification and Material Safety Data.

U3.7.1U Emergency Planning and Community Right-to-Know Act (EPRCRA):

Contractors shall comply with the reporting provisions of EPCRA Sections 311, 312 and 313 during the life of the contract. Contractors shall provide a list of all hazardous materials procured, used and stored along with a current MSDS for each item, an initial inventory and a monthly or quarterly inventory.

Contractors shall provide the information to 5 CES/CEIE through the Contracting Officer. The inventory reporting period shall be determined by the installation Hazardous Materials Management Process Team.

U3.7.2U The contractor shall maintain MSDSs for all hazardous materials used and the MSDSs shall be on file on site at the construction site office at all times. The contractor shall send 5 CES/CEIE an MSDS, via the Contracting Officer, for any new material not initially identified, the volume being brought on site, and its storage location. The MSDS shall be submitted to 5 CES/CEIE in accordance with paragraph 3.7.

U3.7.3U Prior to completion of the contract, the contractor shall provide a finalized report of the actual quantities used during the contract, and remove any excess materials. Contractors may use excess materials on other projects and shall be responsible for proper disposal of any materials removed from job site.

U3.7.4U All hazardous materials used by the contractor on U.S. Air Force property shall be stored properly in segregated areas in accordance with

01431-6 all regulatory and MAFB Fire Department requirements. Storage requirements shall include, but not be limited to:

U3.7.4.U1 Containers must be securely closed when not in use.

U3.7.4.2U Containers must be labeled with appropriate warning labels.

U3.7.4.3U Storage area must be posted with hazardous signs as required.

U3.7.4.4U Storage must have secondary containment.

U3.7.4.5U Contractor shall check at least weekly for leaks and spills and maintain a log of the inspections.

U3.7.4.6U Materials shall be stored in one central location.

U3.7.4.7U Flammable items must be stored in an approved flammable storage locker and grounded as needed.

U3.7.4.8U All fuel storage tanks and containers must have secondary containment.

U3.7.5U Fuel and Lubricants. Storage, fueling and lubrication of…