MAF_Refuse_PWS_-_12_Aug_14_Amendment_2.pdf

PDF 334 KB Posted

Attached to
Missile Alert Facilities (MAF) Refuse Services Federal contract opportunity
Solicitation number
FA4528-14-R-0024
Issued by
Department of the Air Force Global Strike Command

About this file

Updated Performance Work Statement. Changes made to section 3.

View the file

Other files for this federal contract opportunity

Other files attached to Missile Alert Facilities (MAF) Refuse Services, newest first.
File Type Posted
FA4528-14-R-0024-0002.pdf PDF
MAF_Refuse_PWS_-_12_Aug_14_Amendment_1.pdf PDF
FA4528-14-R-0024-0001.pdf PDF
Attachment_2_-_QASP-_Customer_Complaint_Only_for_COR_(FY15).pdf PDF
Attachment_3_-_Responsibility_Questionnaire.pdf PDF
FA4528-14-R-0024.pdf PDF
Attachment_1_-_MAF_Refuse_PWS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4528-14-R-0024

Attachment 1

PERFORMANCE WORK STATEMENT

FOR

MISSILE ALERT FACILITIES (MAF)

REFUSE SERVICES

Minot AFB ND

12 August 2014

MAF Refuse Service

Table of Contents

1. DESCRIPTION OF SERVICES…………………….….…….3

2. GOVERNMENT FURNISHED PROPERTY/SERVICES…..3

3. CONTRACTOR FURNISHED EQUIPMENT..……………..3

4. CONTRACTOR PERSONNEL………………………….……4

5. GENERAL INFORMATION………….………………….…..4

6. SECURITY REQUIREMENTS………………….…

7. HOURS OF OPERATION……………………………………5

8. RECORDS MANAGEMENT………………………………...5

APPENDICES

A. Estimated Workload Data……………

B. Maps…………………………………

PERFORMANCE WORK STATEMENT

MAF REFUSE COLLECTION

1. DESCRIPTION OF SERVICES. The Contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform refuse removal services as defined in the Performance Work Statement (PWS) at the 15 locations for the Minot Air Force Base

Missile Alert Facilities (MAF). The contractor shall perform to the standards in the contract as well as all local, state, and federal regulations. Estimated workload factors are in Appendix A and collection areas are in Appendix B.

1.1. Routes/Schedules Submittals. The contractor shall establish vehicle routes and collection schedules based on a 10 day collection cycle. They are to be submitted to the Contracting Officer (CO) five (5) calendar days prior to start of contract performance for the base year and every option year if the option is exercised. The Contracting Officer will review the schedule for approval.

1.1.1. Unscheduled/Changes/Reduction of Collections. The Contractor must coordinate all changes to the schedule with the the CO 10 days in advance prior to approval. Frequency tables are located at Appendix

A. The Government reserves the right to reduce the frequency of collections.

1.1.2. Inclement Weather Schedule. The Contractor shall collect refuse material during periods of inclement weather. However, in cases of severe weather, the CO may authorize exceptions. When exceptions are granted, the Contractor shall make up all missed collections within 24 hours after the severe weather has terminated or travel is authorized on public road.

1.1.3. Route Parameters. The Contractor shall establish routes to each Missile Alert Facility using attached map. Collection shall be made between the hours of 0730 and 1630 on the day of the week specified.

Collection outside these hours shall require prior approval of the CO or the on-duty MAF personnel.

1.1.4. Points of Collection. Collection stations for refuse are shown in Appendix B. Dumpsters shall be located outside the fenced area of each MAF. The Contractor shall position bulk containers for customer ease in depositing refuse. The Contractor shall also position containers to minimize interference with adjacent parking areas, roadways, overhead utilities, trees, and other potential obstructions.

1.1.5. Prohibited Waste. Customers will not dispose of Hazardous Waste or items covered by the MAF

Recycling program.

1.1.6. Maintaining Containers and Collection Area. When collecting refuse, the Contractor shall return the containers to their original location after servicing, in an upright position with the lids securely in place

(closed). The Contractor will also be responsible for immediately cleaning up any spills, debris, etc., which may occur during servicing of containers. All refuse on the ground within ten feet of the container, whether spilled by the Contractor or placed there by on-site personnel, shall be picked up by the Contractor during collection. The Contractor shall collect debris placed at collection stations; for example, tree branches, sacks, cartons, boxes, cans, tied bundles, or other containers. The Contractor will be responsible for keeping collection areas free of refuse and debris.

1.2. Off-Base Disposal. The Contractor shall transport and dispose of all solid waste at a licensed off-base disposal site selected by the contractor. Disposal shall be in accordance with existing local, state, and federal regulations. The Contractor shall be responsible for any permit or fees associated with the use of off-base disposal locations.

2. GOVERNMENT FURNISHED PROPERTY/SERVICES. There is no Government furnished property or services in this contract.

3. CONTRACTOR FURNISHED EQUIPMENT. The Contractor shall provide all vehicles and dumpster containers needed to perform the requirements of the contract. One dumpster shall be provided per MAF, 15 dumpsters total. The Contractor-provided, industry standard dumpster containers must be pre-approved by the CO prior to placement and before contract performance is to begin. Typical capacity of containers located at the MAFs is 6 cubic yards. For security purposes, the contractor provides a padlock for each container and duplicate keys to the on-site MAF personnel.

3.1. Contractor Maintenance Requirements. The Contractor shall furnish containers that are fully serviceable with working doors, hinges, lids, and hasps. The containers shall remain easily accessible to customers and in good, workable condition. The Contractor shall maintain all contractor containers ensuring they are free of unpleasant odors, dirt, debris, and pests. The Contractor shall furnish replacement containers for any container removed from the MAF unless previously approved by the CO.

4. CONTRACTOR PERSONNEL. The Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person, and an alternate or alternates, who shall act for the Contractor when the Manager is absent, shall be designated in writing to the Contracting

Officer.

4.1. The Contract Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.

4.2. The Contract Manager or alternate shall be available during normal duty hours (0730-1730) within 24 hours to meet, on the installation, with Government Personnel (designated by the Contracting Officer) to discuss problem areas. After normal duty hours, the Manager or alternate shall be available within 4 hours.

4.3. The Contract Manager and alternate or alternates must be able to read, write, speak and understand

English.

4.4. The Contractor shall not employ persons for work on this contract if such employee is identified to the

Contractor by the Contracting Officer as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.

4.5. Contractor Personnel shall present a neat appearance and be easily recognized as Contractor employees. This shall be accomplished by wearing distinctive clothing bearing the name of the company.

5. GENERAL INFORMATION.

5.1. Occupational Safety and Health (OSHA) Standards. The Contractor is solely responsible for compliance with OSHA standards for the protection of their employees. The Contract Manager shall ensure specific safety requirements in Air Force Occupational Safety and Health (AFOSH) standards and Air

Force technical orders are complied with by Contractor Personnel when non-compliance would clearly present the potential to harm or damage government resources (see AFI 21-101, paragraph 9.16.). The Air

Force is not responsible for ensuring that Contractors comply with “personal” safety requirements that do not present the potential to damage government resources.

5.2. Environmental Compliance. Contractor shall be knowledgeable of and comply with all applicable

Federal, State and local regulation and requirements regarding environmental protection.

5.3. Contract Manpower Reporting. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the MAF

Refuse Services via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.

5.3.1. Reporting inputs will be for the labor executed during the period of performance for each

Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

http://www.ecmra.mil/

6. SECURITY REQUIREMENTS. Dumpsters must be locked with a padlock to prevent unauthorized use of the dumpster. Duplicate keys for each dumpster must be provided to the on-site MAF personnel.

7. HOURS OF OPERATIONS. The Contractor shall perform services between the hours of 0730 - 1630.

7.1. Holidays. The Contractor may be required to provide services on all holidays except Thanksgiving, Christmas and New Year’s Day.

8. RECORDS MANAGEMENT: All records, files, documents, regardless of media (e.g., paper, electronic, etc.), as described in the PWS, that are the responsibility of the Contractor are the property of the Government and shall remain so upon termination or completion of the contract. The

Contractor shall keep these items current and maintain and dispose of them in accordance with the requirements established in Air Force Instruction (AFI) 33-322, Records Management Program, Air Force

Manual (AFMAN) 33-363, paragraph 6.4, AFMAN 33-364, paragraph 2.13, and the Air Force Records

Disposition Schedule which can be provided by the CO upon request. Records shall be turned over to the

Government upon completion of the contract unless otherwise stated. All records are subject to the

Freedom of Information and Privacy Act. The Minot AFB Records Management Office (5 CS/SCXR), 723-3529/3186, will provide assistance and training to the Contractor to ensure compliance with Federal record keeping requirements.

APPENDIX A

ESTIMATED WORKLOAD DATA

ITEM NAME ESTIMATE

QUANTITY

1 Refuse Volume on a 10 day cycle from all 15 MAFs 1.5 Tons

2 Distance To MAF from Minot Air Force Base Approximate Miles

A-1 50 Miles

B-1 50 Miles

C-1 50 Miles

D-1 40 Miles

E-1 60 Miles

F-1 55 Miles

G-1 65 Miles

H-1 75 Miles

I-1 50 Miles

J-1 45 Miles

K-1 50 Miles

L-1 75 Miles

M-1 50 Miles

N-1 40 Miles

O-1 40 Miles

Distance From MAF To MAF

A-1 to B-1 25 Miles

B-1 to C-1 20 Miles

C-1 to D-1 30 Miles

D-1 to E-1 30 Miles

E-1 to F-1 10 Miles

F-1 to G-1 30 Miles

G-1 to H-1 25 Miles

H-1 to I-1 35 Miles

I-1 to J-1 25 Miles

J-1 to K-1 20 Miles

K-1 to L-1 30 Miles

L-1 to M-1 30 Miles

M-1 to N-1 20 Miles

N-1 to O-1 20 Miles

TASKS & FREQUENCY TABLES

COLLECTION

STATION

LOCATION

SIZE

FREQUENCY

See Attached Map

See Attached Map

6 CY

Each site (15) once every 10 days

APPENDIX B

MAPS

File details come from the government source that posted it. Updated .