Attachment 2(a) WD6 12-03-2010.docx
DOCX document 17 KB Posted
- Attached to
- Repair Cathodic Protection (LF/MAF) IDIQ Federal contract opportunity
- Solicitation number
- FA4528-11-R-0008
About this file
Attachment 2(a) Wage Determination ND100006
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2ND7 10-8-2010.docx | DOCX document | |
| Amendment 0001.doc | DOC document | |
| 11-6001 | — | |
| Attachment 2(b)ND5.docx | DOCX document | |
| Solicitation.rtf | RTF text file | |
| Attachment 3 Recent and Relevant Experience.doc | DOC document | |
| ATTACHMENT 4 Responsibility Questionnaire.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: ND100006 12/03/2010 ND6
Superseded General Decision Number: ND20080006
State: North Dakota
Construction Type: Building
Counties: Adams, Billings, Bottineau, Bowman, Burke, Divide, Dunn, Golden Valley, Grant, Hettinger, McHenry, McKenzie, McLean, Mercer, Mountrail, Oliver, Renville, Sioux, Slope, Stark and Williams Counties in North Dakota.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family fomes and apartments up to and including 4 stories)
Modification Number Publication Date 0 03/12/2010 1 05/14/2010 2 05/28/2010 3 06/04/2010 4 07/23/2010 5 10/29/2010 6 11/05/2010 7 12/03/2010
BRND0004-001 05/01/2009
Rates Fringes
BRICKLAYER.......................$ 26.18 8.87
ELEC0714-001 07/01/2010
Rates Fringes
ELECTRICIAN
CABLE SPLICER...............$ 27.92 7.87+10.5%
ELECTRICIAN.................$ 27.52 7.87+ 10.5%
PLUM0300-011 06/01/2009
ADAMS, BILLINGS, BOWMAN, DUNN, GOLDEN VALLEY, GRANT, HETTINGER,
McLEAN MERCER, OLIVER, SIOUX, SLOPE & STARK COUNTIES:
Rates Fringes
PLUMBER
PLUMBERS(including HVAC piping).....................$ 34.71 10.51
PLUM0300-012 06/01/2009
BOTTINEAU, BURKE, DIVIDE, McKENZIE, MOUNTRIAL, RENVILLE, &
WILLIAMS COUNTIES
Rates Fringes
PLUMBER
PLUMBERS(including HVAC piping).....................$ 34.71 10.51
* SHEE0010-039 06/02/2008
Rates Fringes
SHEET METAL WORKER (HVAC
duct & set unit only)............$ 19.20 10.29
SUND2000-002 03/23/2000
Rates Fringes
CARPENTER
CARPENTERS (including the installation of cabinets, drywall, form work, & drywall finishing, excluding the installation of bleachers, heat and frost insulation, soft floor laying, gypcrete flooring & the erection of metal buildings)............$ 11.94 2.64
CEMENT MASON/CONCRETE FINISHER
CEMENT MASONS (excluding form work, Gypcrete flooring & rebar)...........$ 11.17 .32
Heat and Frost Insulator.........$ 8.12 .43
Laborers:
LABORERS (including the installation of rebar & excluding form work)........$ 9.51
MASON TENDER................$ 10.83
PAINTER
PAINTER (including paper hanging & excluding drywall finishing)..........$ 13.61
Power equipment operators:
Backhoe.....................$ 10.75 1.79 Crane.......................$ 15.55 5.10 Skid Steer..................$ 9.64
ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 10.64
Sheet Metal Worker
SHEET METAL MECHANIC
(Exclud. HVAC)..............$ 16.76 2.24
TILE SETTER......................$ 11.50 .22
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .