Amend 01 Atch 03 - Grounding Test Results.pdf
PDF 450 KB Posted
- Attached to
- B502 ATC Lightning Rod Repair
- Solicitation number
- FA449724R0007
About this file
This document is Attachment 03 - Grounding Test Results, which is part of Amendment 01 to Solicitation FA449724R0007 for the B502 ATC Lightning Rod Repair requirement.
The solicitation is for a one-time construction service to replace the lightning protection air terminal masts and airfield obstruction lights on the roof of the air traffic control (ATC) cab of building 502 (B502) at Dover AFB. The contractor shall provide all design, labor, materials, tools, and equipment necessary to complete the services described in the attached Statement of Work (SOW), dated 08 February 2024. This attachment provides the results of grounding tests that were conducted as part of the project. The test results indicate the existing grounding system meets the required specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .