The key details are: The incumbent contractor was Condortech Services, Inc. who was awarded a $135,247.75 contract (FA449723F0007) for 5 years of services. The current requirement is for the removal and replacement of 14 cameras, as well as the procurement and installation of 14 new cameras, for a total of 59 cameras to be serviced. A site visit is scheduled for June 28, 2024 and the solicitation due date has been extended to July 11, 2024. The new cameras must be compatible with the existing system and current generation models. The contractor will deliver and install 1 new DVR in Building 150 and integrate it with the current DVR and recording software in Building 550. Majority of the cameras are exterior and will require the use of lifts. No 360-degree cameras are needed, but some PTZ cameras are required, particularly for the parking area. 32TB of storage is needed for the video recordings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Provisions and Clauses.pdf | ||
| Attachment 5 - Quote Schedule.docx | DOCX document | |
| Attachment 7 - Building Square Footage_Redacted.pdf | ||
| Attachment 1 PWS - APS CAMERAS.pdf | ||
| Attachment 3 - WD 2015-4217.pdf | ||
| APS Cameras Combined Synopsis Solicitation.pdf | ||
| Attachment 4 - 52.212-1 Instructions to Quoters- Tailored.pdf | ||
| Attachment 5 - Quote Schedule.docx | DOCX document | |
| Attachment 2 - Provisions and Clauses.pdf | ||
| Attachment 3 - WD 2015-4217.pdf | ||
| COMBO APS.pdf | ||
| Attachment 1 PWS - APS CAMERAS.pdf | ||
| Attachment 4 - 52.212-1 Instructions to Quoters- Tailored.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of the Air Force 436th Contracting Squadron - DOVER AFB
Attachment 6: Questions and Answers
Requirement Title: APS Cameras
Solicitation Number: FA449724Q0044
1. Who/was the incumbent contractor providing Camera Maintenance and what was award amount/solicitation number?
FA449723F0007 was awarded to Condortech Services, INC. in the total amount of $135,247.75 for 5 years of services.
2. What is the exact number of cameras missing and require replacement? Is 14 cameras’ accurate per
PWS.
14 cameras to remove and replace, 14 new cameras to procure and install
3. What total number of cameras count for service?
59 Cameras total
4. Can base provide camera layout from DAFB.
No, a new site visit is scheduled for 28 June 2024 at 1300 hrs. Please see the combined synopsis/solicitation for more details. Site visit sign-up is due to the Contract Administrator and Contracting Officer by 21 June 2024 at 1000 hrs. It is highly recommended that potential offerors attend the second site visit for building layouts as they cannot be posted publicly for security reasons.
5. What cameras does Milestone support?
100% of the cameras
6. Does storage need RAID to protect recordings 32TB useable 2116.
Yes
7. Types of cameras installed resolution do we need to replace with the same?
Industry standard resolution and replace with a current generation model that is compatible.
Attachment 6: Questions and Answers
8. What type of wall mount free standing, secure w/positive ventilation conduit into rack?
See PWS Para. 2.1.1.4
9. Where does the “live viewing screen” need to be mounted (PC may be necessary)?
The Live Viewing Screen will be placed in Bldg 150, Rm 147 – Flight Operations
10. Is there a specific brand camera that you are interested in using?
See Question 7
11. Please clarify placement of new DVR: see PWS statement below:
i. “The contractor will deliver and install 14 cameras across buildings 550, 509, and 551, providing all hardware and software required to connect the cameras to the existing DVR. The contractor will deliver and install 1 new DVR to building 150 and ensure operational. The New DVR must integrate with the current DVR and recording software that is currently install in building 550. The installation of all equipment should be accomplished on or by 03/01/2024.”
Per site visit functioning/non-functioning cameras:
Functioning 18
Nonfunctioning 31 (non-functioning reason unknown/missing cameras)
59 Cameras total for the contract.
Bldg 550 – 38 cameras total and 18 Cameras non-operational
14 New Cameras required
4 Cameras to remove and replace
17 Cameras are interior, 17 are exterior
Bldg 509 – 1 camera total and 1 Camera non-operational
1 Camera to remove and replace
1 Camera is interior
Bldg 551 – 8 Cameras total and 4 non-operational
4 Cameras to remove and replace
2 cameras are interior, 6 are exterior
Bldg 150 – 12 Cameras total and 5 non-operational
5 cameras to replace
9 cameras are interior, 3 are exterior
12. How old is the facility?
All facilities are 20+ years old, but not more than 25 years.
13. Is the use of this facility mainly office use?
No, warehouses except for bldg. 150 (passenger terminal)
14. How much square footage is in the facility?
Please see the attached documents.
15. How stable is the power?
Power is stable with monthly generator tests.
16. Is there a dropped ceiling in all areas of installation?
No
17. What type of walls are in the perimeter areas?
Concrete/metal
18. What type of walls is inside the offices?
Drywall or concrete
19. Do we need to drill between the walls, to run our cable infrastructure?
Possibly based on camera location.
20. Do we need to use conduit? If yes, what do you estimate the total conduit footage will be?
21. Is the existing Command Control (SOC) well ventilated?
Yes
22. Are you planning to use the existing Command Control (SOC) for the new CCTV System?
For bldg. 550, 551, and 509, yes. For Bldg 150, no, requesting a new DVR.
23. Is there a plan new for a new command control system?
Yes, for bldg. 150, we would like both systems to communicate with each other – i.e. all cameras in Bldg 150 viewable from Bldg 550.
24. If yes, how far apart will the new Command Control be from the old command control system?
Approximately 1/3 mile between facilities.
25. Is there a special room with HVAC allocated for the new Servers?
26. How many cameras are interior?
27. How many cameras are to be installed in a hanger?
Zero, all buildings are warehouses or a passenger terminal
28. How many cameras are to be installed on a roof, and how high is it?
None
29. How many cameras will be installed outside the building?
31 – Contractor to provide lifts
30. Do you need 360-degree view in some areas? If so, can you specify what areas?
No 360-degree cameras
31. Do you need Pan/Tilt/Zoom for some areas?
Yes, mostly exterior are PTZ.
32. Is there a parking area to be viewed by any camera? If yes, please specify what type of camera?
Yes, PTZ
33. Is there a requirement to install some cameras on poles?
34. If yes, is there an existing connection to existing conduit to the poles?
No poles
35. Are they going to be standalone cameras, as in not connected to the facility’s network?
36. How much storage is needed for the CCTV Video recording?
32 TB
37. What is the existing power infrastructure?
Base power w/ Backup Generators
38. Is the power supply stable?
39. Will UPS(s) be required?
i. If so, what is the power requirement?
N/A
ii. How many UPS?
N/A
40. Are there existing fiber optic access points?
41. Will new fiber optic cables be required?
Unknown at this time – quoter not required to provide quote for this work.
i. If so, what type?
ii. What are the lengths of the fiber optic cables from point of origin to end destination?
iii. How many fiber optic runs?
iv. What termination types will be required?
42. Will trenching be required?
43. If so, are the utility locations marked on the ground and/or properly documented?
N/A
i. Will dig permits be required?’
N/A
ii. Who will be required to obtain the digging permits?
44. Will lead and asbestos abatement be required?
(1) Have the buildings been tested for lead and asbestos?
1. If so, will the government provide the results of the testing?
2. Are there any other health hazards associated with the applicable installation and maintenance?
45. Are any of the buildings listed as historic buildings?
i. If so, who will determine the locations approved for possible drilling and camera placement?
46. Is the existing camera system analog or IP?
All are IP except for two cameras
i. Are the cameras connected by ethernet or coax cable?
Ethernet except for two cameras
47. Is Cat6 plenum indoor and outdoor cable required?
i. Are there existing cable raceways or paths to route the new ethernet through?
ii. Will conduit be required?
(1) If so, what type and how many feet?
48. Will existing equipment need to be tested?
Yes
i. If so, what type of equipment?
DVRs, cameras, switches, cabling
ii. Number of each?
1 DVR, 59 Cameras, 10 switches
49. Will existing cameras need to be replaced?
Yes, but only a select few
i. If so, how many cameras need to be replaced?
14 cameras require replacement
ii. What type and/or brand of cameras are they to be replaced with?
Compatible with the current system and cameras that are current generation
50. Camera locations:
i. How many cameras are/will be mounted above 12' on the buildings/poles?
Exterior cameras are mostly above 12’
ii. How many cameras are/will be roof top mounted?
None
iii. How many cameras are/will require a lift?
Exterior cameras, select few interior (inside warehouse)
51. Do the buildings have drop ceilings, or are they solid ceilings between floors?
See question 16.
52. Are “To Scale” drawings available for publication?
No, see question 4.
i. If not, what is the length, width, and height of the building(s).
53. What are the “testing requirements” for the new or upgraded system(s)?
All cameras and both DVRs operational.
54. Is the government able to extend the solicitation’s due date?
Amendment 1 extends the solicitation due date to 11 July 2024
55. Can you please provide any more specifics on the types of cameras for the 14 cameras (will they all be standard fixed cameras,) and do you have drawings or a diagram of the camera locations?
PTZs are exterior, indoor are fixed. See Question 4.
56. Is there a specific brand camera that you are interested in using?
See Question 7.
57. Para 2.1.1 of the PWS (attachment 1) state on the last line....."The installation of all equip should be accomplished on or by 03/01/2024." This date has obviously already passed, so asking if you have a better date?
See updated PWS.
58. Would like to ask if we can receive the layouts of all associated buildings so that we can accurately build our quote and understand where the types of camera systems that should be placed.
See question 4.