Epoxy - Submittal Schedle Attach 4.pdf

PDF 15 KB Posted

Attached to
Epoxy Flooring
Solicitation number
FA4497-11-R-0010
Issued by

About this file

Attachment 4 - Material Approval Submittals

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NUMBER FA4497-11-R-0010

CONTRACT NUMBER

-1-

MATERIAL SUBMITTAL SCHEDULE

EXTERIOR PAINT REQUIREMENTS CONTRACT

PROJECT NUMBER: 111102

NOTE: Submittals shall be made on AF Form 3000 within 10 days from the issuance of the Notice to Proceed, unless otherwise approved. Each submittal item shall be listed separately on the form with the "Item No." on the form corresponding to the item number on this schedule. Submittals required by specification and/or drawing shall be made regardless whether or not they are listed below. The type of submittal required for each item shall be identified by the following letter code:

A - Catalog Cuts/Technical Literature F - Color Selection B - Sample G - Control

Diagram C - Certification H - Delivery

Tickets D - Shop Drawings I - Manufacturer's

Instructions/ Manuals

E - Test Results J - Other K -

Material Safety Data Sheets (MSDS)

Item Item Description Submittal

Code Reference Date

Approved by CO

1 MSDS/HazmatChemical Worksheets

K 01 20 00

2 Recycling of Materials K 01 20 00 / Part C 3 Inspector Certificates C,K 01 45 00 / 1.2 4 Waste Management Records J 02 42 00 / 1.3

5 Concrete Rehabilitation A,C,E,I 03 01 30 / 1.3

6 Color Samples B,F 09 06 90 /1.2

7 Thin Film Flooring B,C,E,F,I,J 09 62 51/1.2

8 Epoxy Mortar Flooring B,C,E,F,I,J 09 62 52 /1.2 9 Fluid Applied Flooring A,B,C,D,F,I 09 62 53 /1.2 10 Resilient Flooring A,B,E,F,I 09 65 00 /1.2

--End of Material Submittal Schedule— Attachment 4